Yantian Waste Power Plant under Shenzhen Energy and Environmental Protection Co., Ltd. is located in Qinglinkeng, Yan Tianao, Yantian District, Shenzhen, with a total investment of about 270 million yuan. Civil engineering started on August 8, 2002 and was completed and put into production in February, 2003. It is equipped with two garbage incinerators with a capacity of 225 tons/day, 6MW steam turbine generator set 1 set, with an annual power generation of 50 million kwh, 450 tons of domestic garbage per day, and 0/.7 million tons of domestic garbage per year.
Qingshuihe Waste Incineration Plant, 1986 1 1, was completed in June, 2008, and it is the first modern waste incineration plant in China. In 2009, the daily garbage output in Shenzhen has reached 12074 tons, and seven garbage incineration power plants have been built, with a total designed garbage incineration capacity of 4875 tons/day.
Baigehu Waste Incineration Treatment Plant (under construction) located at the junction of Baoan and Longgang in Shenzhen.