Ventilation and air conditioning engineering system commissioning does not include the main content ( ).

Answer: C

Textbook P149, 2020 Edition

System commissioning includes stand-alone commissioning and debugging of equipment, and joint commissioning and debugging of the system under non-designed full-load conditions

Option A belongs to the content of joint commissioning and debugging of the system under non-designed full-load conditions.