One, site management
1, strengthen the ideological education of workers
To carry out regular educational activities to cultivate workers' awareness of compliance with the law. Strengthen workers' business training and improve their technical level. Make use of project resources and spare time to arrange for migrant workers to stay on site to organize study or watch TV programs.
2. Uniform dress code and badge management
Select and configure several different colors of clothing according to the team of the operating team, while the project uses digital cameras to make real-name badges for each worker, and requires workers to hang them in a specified location during working hours.
Strengthen the management of entry and exit, each worker with a badge into the construction site, undocumented personnel into the field need to have the relevant personnel transportation, otherwise prohibited from entering.
3. Management of workers' living area
The project is strictly in accordance with the "living area management system" to carry out the daily inspection and management of the living area, care for the life of workers, improve the living environment, and carry out some healthy recreational activities, so that the workers can feel the warmth, abide by the regulations, and hold fast to the workplace.
Two, the labor force to protect
1, to create a good environment for construction and production, to provide adequate security for labor workers, the full amount of the amount of labor protection supplies.
2. The Finance Department commissions the bank to pay the workers' wages directly into the workers' MI card on time.
3. To each labor enterprise workers for workers' compensation insurance, and supervision of labor enterprises for workers' medical insurance, such as not to be mandatory.
4. Provide labor workers with good living facilities in the pro-construction, the pro-construction is equipped with infirmary, bathroom, activity room, etc., so that the workers' spare time life is colorful.
Third, the use of project funds
Funds are the basic guarantee for the implementation of the project, if the funds are not functioning well, the progress of the project will be difficult to ensure. In order to ensure the normal operation of the project, rationalize the use of funds, the use of funds for the project will be based on the project annual (monthly) progress schedule, annual (monthly) volume statistics for dynamic adjustment.
The use of funds should be prioritized to meet the workers' wages, with the completion of key nodes in all phases of the project in a timely manner to cash the professional construction team's labor costs, to ensure that the civilian workers receive their salaries on a monthly basis. This can fully mobilize the enthusiasm of the operating team, but also to ensure the stability of the construction team, so that the operating team for the project to arrange for the operating personnel, especially in winter, the Spring Festival period of the operating personnel adequately equipped to provide a guarantee.
Four, safety, civilized construction
1, the preparation of construction safety management specifications
According to the specification requirements, and the owner, the supervisory side of the approval of the construction of the construction of the general layout and the construction of the organization of the design plan, to provide the entire construction project and the construction of construction site construction safety measures, and regular inspections, maintenance, in order to ensure that the safety measures of the security measures are safe and effective. It is fully responsible for the construction safety of the whole construction site, and carries out construction safety management for the specialized subcontracting units, and implements various construction safety management measures.
2. Establishment of safety construction team
Organization of the establishment of civilization and safety construction of professional groups, each professional subcontracting must provide at least one safety operator, the company unified command, daily safety patrol, the hidden dangers of safety and timely rectification.
3. Implementation of civilized construction measures
Develop and implement the civilized construction of the entire project (including garbage removal, sanitation, safety enclosure, finished product protection, security, fire safety, public **** lighting, construction nuisance, dust and noise reduction, sewage discharge, peripheral traffic, material storage, etc.) measures and programs, to provide civilized construction facilities, supervision and management of construction sites and professional subcontractors civilized construction. Professional subcontracting unit civilized construction, and constantly improve civilized construction management measures, so that the entire construction site in a safe and orderly legal construction status.
4. Garbage removal and sanitary facilities
Construct garbage collection stations according to the construction layout plan approved by the owner and supervisors, and be responsible for relocating or restoring them according to the construction requirements. Collect and transport the construction waste of the general contracting work and the site to the garbage collection station, and remove the garbage of the whole project from the garbage collection station to the designated/approved dumping ground by the city management department.
Specialty subcontractors shall collect and transport garbage generated by their own specialty subcontracts to the designated on-site garbage collection station according to the requirements. Properly use the temporary toilets according to the requirements of civilized construction, and assist in keeping the toilets and the surrounding environment clean and hygienic.
5. Safety and security
Elect a sufficient number of qualified security personnel. Develop and implement safety and security measures, and prevent the loss of materials throughout the construction site.
Specialized subcontracting is responsible for specialized subcontracting project equipment, materials, construction site security and care, to take effective measures to ensure the safety of their own project equipment, materials.
6. Protection of finished products
Select a sufficient number of personnel responsible for the protection of finished products to undertake the general contracting work of finished products, semi-finished products protection. Provide finished product protection for completed or partially completed specialized subcontracted works which have been formally accepted and handed over.
When several projects are operated at the same time, the specialized subcontracting units shall undertake the protection of finished and semi-finished products of the projects. Unless there are sufficient reasonable grounds to prove that the responsibility for the damage or destruction of the finished or semi-finished products lies with the destroying unit, the damage or destruction of the finished or semi-finished products within the scope of any subcontract shall be borne by the contracting unit.
7. Fire safety
Develop and implement fire safety management measures, and carry out fire safety management for specialized subcontractors.
Develop fire safety emergency measures, and educate and instruct all personnel at the construction site to establish emergency treatment methods for fire accidents.
Developing management measures for open-flame operations and supervising professional subcontracting units to implement them effectively.