According to the Regulations on the Administration of Town Gas issued by the State Council, enterprises engaged in gas business activities must obtain a Gas Business License in order to operate.
A complete liquefied natural gas filling station (hereinafter referred to as liquefied natural gas station) has to go through six stages, including site selection, project, design, construction, construction, acceptance, etc. In the pre-construction stage, the construction unit needs to apply for a land use certificate from the Land and Resources Bureau first.
Yiyang City, for example, the specific requirements are as follows:
Required materials:
1, LPG outlets licensing application form;
2, "Enterprise Business License", the legal representative of the personal identity card;
3, the legal representative, safety management, gas delivery and emergency personnel training and assessment certificates (each outlet at least) Equipped with 2 people);
4, gas supply contract or agreement;
5, proof of business premises;
6, gas safety management system in the premises, safety accident and rescue plan and outlets and gas companies signed a safety responsibility;
7, gas authorities of the premises acceptance of the record information;
8, laws and regulations Other supporting documents required.
Conditions for approval
1, there is stable and meet national standards of gas gas source;
2, gas business outlets should be set up in line with the requirements of the local gas development plan;
3, there is a fixed, safety-compliant business premises, improve the management system and the safety of the accident and emergency plans;
4, with the size of the gas business Appropriate capital funds. Gas business license standards in line with the requirements of the fire, safety and protection, rescue and emergency equipment and equipment;
5, the legal representative of the enterprise, the main person in charge, safety management personnel, operation and rescue personnel through the competent gas department of gas professional training and assessment of the qualification;
6, laws and regulations of other conditions.
Expanded Information
According to the "Yiyang City, Ⅲ bottled liquefied petroleum gas supply station setup specifications"
Four, the supply station and the station outside the building, the structure of the fire prevention distance should not be less than the following provisions:
1, from the open fire, the location of the emitting sparks 20m;
2, from the important public ** * building, a class of high civil buildings, 12m;
2, from the important public ** * building, a class of high civil buildings. ** building, a class of high-rise civil buildings 12m;
3, 6m from civil buildings;
4, 8m from the main road curb;
5, 5m from the side of the secondary road curb.
5, the bottle depot of the supply station is suitable for open or semi-open type of building. Cylinders should be stored in the bottle storage area, that is, divided into the real bottle area and empty bottle area KYe China City Gas Association.
Six. Supply station consists of bottle storage and business room through the room, the center should be set up non-combustible material safety barrier, the bottom of which is set up at a height of not less than 0.6m solid separation wall.
Xixian.com - Henan Qixian: liquefied petroleum gas station in chaos, multi-departmental supervision in vain
Yiyang City - Yiyang City, liquefied petroleum gas business outlets license approval matters Handling process