How to install the central vacuum cleaner system?
The so-called central vacuum cleaner system refers to a class of large-scale vacuum cleaner equipment composed of vacuum cleaner host, pipe network, vacuum cleaner socket, vacuum cleaner and other components, usually vacuum cleaner host is placed in the building's engine room, balcony, garage, equipment room (or outdoor), the host through the pipe network is connected to the suction port of each room, the vacuum cleaner component is inserted into the suction port during cleaning work, the system automatically will be harmful gases and dust through the vacuum vacuum cleaner The system automatically vacuums the harmful gases and dust through the vacuum pipe and sucks the indoor and harmful dust into the large-capacity garbage bag. Central vacuum cleaner system is mainly used in factories, libraries, schools and other large-scale building materials, can avoid the dust brought about by the secondary pollution, but the installation of the central vacuum cleaner system is also a technical work, how to install the central vacuum cleaner system? Installation of the central vacuum cleaner system steps and processes: 1, the installation of the pipe network: pipe laying in line with the relevant national construction standards on the basis of the special requirements should also comply with the vacuum cleaner system. The central cleaning system is to use the principle of negative pressure to work, therefore, in order to ensure that each suction port has enough negative pressure, it is necessary to ensure the tightness of the entire system. After doing the corresponding work surface of the pipeline installation shall use special negative pressure table for pipeline tightness test, the system is completed, shall be tested again, each time the test results need to make a detailed record. 2, the installation of the dust port: dust port installation location is usually the same height as the electrical socket. Dust port panel to ensure that the level, tight connection. 3, the installation of the host: the host is installed in the room, the bottom of the host needs to do shock absorption treatment, and the connection between the pipe network using a hose connection, that is, to facilitate and reduce the host vibration impact on the pipe network. View count