Security contract

With the growing popularity of the concept of law, many occasions can not be separated from the contract, the contract is the protection of both sides and a kind of constraint. Then the format of the contract, have you mastered? The following is a security contract I organized for you 6, for reference only, welcome to read.

Safety contract Part 1

Party A: Xinghua Shunda Road Pavement Reconstruction Project Manager (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In order to effectively strengthen the management of production safety, to protect the Xinghua Shunda Road Pavement Reconstruction Project construction of the project to ensure that A and B life and property safety, by A, B and the two sides of the consultation, is now on the relevant Safety responsibility to reach the following agreement:

a, party B before entering the field is obliged to inform their health status to party A, shall not deliberately conceal their own diseases, party B in the construction process, if due to their own disease induced, recurrence and lead to death, all to party A has nothing to do.

Second, Party B in the field, Party A is obliged to Party B for safety education, safety technology briefing, job safety skills training.

Third, Party B in the construction of the project, must strictly abide by the management system formulated by Party A, to comply with traffic rules, abide by labor discipline, and comply with Party A site management personnel division of labor and command.

Fourth, Party B, whether in the construction site, or on the way to and from work, must comply with the relevant laws and regulations on production safety, the People's Republic of China *** and the State Road Traffic Safety Law and the People's Republic of China *** and the State Road Traffic Management Regulations, if Party B safety accidents resulting in death or injury or property damage, will be dealt with in accordance with the relevant laws and regulations, Party B or relatives of Party B shall not interfere with or prevent Party A construction. Party B or Party B's relatives shall not interfere with or prevent Party A's construction, and Party A is obliged to assist Party B or Party B's relatives to deal with related matters.

V. Party B shall ensure its own safety as well as the safety of others in the work, and if Party B's fault or negligence causes injury or property damage to others, Party B shall be responsible for all the damages caused.

Six, this agreement in duplicate, A, B each party to sign a copy, effective from the date of signature of both parties. Valid until the end of the project.

Party A (seal): Date:

Party B (seal): Date:

Safety Contract Part 2

Party A: xx Project Manager Department

Party B: Welder

1, the welder must be licensed, humbly accepting the head office, the project, the team (or labor team) safety management and education, according to the security briefings and according to the safe operation procedures. Operation.

2, the switch box should be locked, when not in use or repair to lock the switch, repair should be added to the "repair, please do not close the gate.

3, the switch box is not allowed to put debris, not allowed to use other metal wire instead of fuse.

4, welding machine primary line more than 2 meters, the wire should be hung up or take other measures to prevent wear and tear leakage; such as working on metal structures, need to ensure the integrity of the wire insulation.

5, welding must be equipped with masks and other protective equipment, welding at height on the scaffolding to wear a safety belt, back welding to wear asbestos gloves, wet environment to wear insulated rubber shoes, to prevent leakage of electric welding pliers and other parts.

6, in addition to the welding machine on the wheel line connector can be removed by the welder, the other power lines only allow electricians to install and remove.

7, energized, the welder shall not touch the uninsulated conductive part of the welding machine, there is a leakage to find an electrician to repair.

8, welding stored oil or natural gas containers, pipelines, oil lines before, you must first find out the relevant safety regulations, according to the provisions of the security measures, or not allowed to weld.

9, welders are not allowed to move the tungsten iodine lamps and other security of the work of the lamp, are not allowed to drunken work on the heights.

10, welding, to clean up the welding slag spatter may cause a fire of flammable materials; electric welding tongs, welding pieces to be put, to prevent the items from heat triggered a fire.

11, their own safety hazards should be corrected in a timely manner, and found that the safety hazards of the bystanders should be pointed out in a timely manner and assist in the elimination of their own inability to deal with hidden dangers, should be reflected to the superiors and the project safety officer in a timely manner.

12, on their own negligence caused by violations and accidents is responsible for, and is willing to accept the company and the project's appropriate penalties, the individual penalties on the welder can not exempt or mitigate the project on the production of safety accidents and casualties in accordance with the law should be responsible for.

Party A representative (signature): Signature of Party B:

Monthly, January

Safety Contract Part 3

Party A: (hereinafter referred to as Party A) Party B: Gender : Age : (hereinafter referred to as Party B)

The terms of the contract is the commitment of Party A and Party B to each other in the implementation of the contract during the period of the basis of the legal effect of the contract in order to make the contract period of implementation of the safety responsibilities in order to perform and timely treatment of major accidents. In order to enable the contract implementation period to fulfill the safety responsibilities in an orderly manner, and the timely handling of major accidents, the formulation of this agreement.

1, Party B in the provisions of the work period in the event of unsafe accidents, work-related injuries resulting in medical costs, without hospitalization of all costs borne by Party A, the need for hospitalization of the cost of reimbursement by the combined treatment of the rest of the part borne by Party A, due to personal violation of the operation of the casualty and the cost of accidents caused by the severity of the circumstances can be determined by a separate study.

2, Party B in the provisions of the working time outside the time (including leave, vacation, vacation, sick leave, absenteeism) all the unsafe accidents, resulting in disability, death, hospitalization due to illness, death accidents and all the costs of Party B to solve their own, Party A does not bear any responsibility.

3, Party B in the stipulated work period due to sudden death or death due to public accidents, according to the national normal public accidents and deaths of the relevant policy provisions.

4, Party B in the stipulated working hours, the body should be timely diagnosis and treatment or hospital treatment and hospitalization, general diagnosis and treatment costs borne by Party B, the need for hospitalization and can not be terminated labor relations, hospitalized in the county, municipal hospitals, where the rural cooperative reimbursement, the company will not be in the subsidies, for those who do not participate in the cooperative medical care, Party A according to the amount of the official invoice cost of the discharge of 20% to give the subsidy. 20% subsidies.

5, Party B, such as major illnesses or health convalescence can not guarantee normal work, should be timely termination of labor relations, for separation procedures.

6, Party B due to hospitalization at the end of the hospital, due to various types of residual diseases affecting the normal work of Party A should be timely termination of labor relations.

7, Party B in the stipulated work period in violation of the employer's system due to fighting and brawling caused by all kinds of accidents caused by Party B or the responsible party responsible for their own costs.

8, Party B in the work period to go out privately or leave the workplace, for personal affairs, crosstalk, illegal operation of other people's equipment and machinery, vehicles, private contact with the power supply, the installation of electrical appliances, and therefore all the accidents, the responsibility for the cost of Party B shall bear the responsibility.

9, Party B shall not designate others to take over the post, instead of going to work, if there is a similar situation, the accidents occurred on behalf of the post, Party A does not bear any responsibility.

10, Party B contract expires, should be timely clean up Party A or the employer of all kinds of goods, information materials, and seriously for the termination of the labor contract procedures, otherwise, Party B shall bear the corresponding legal responsibility.

11, due to the contract between the two parties to the performance of contradictions and disputes, such as any party is not convinced by the people's court mediation or adjudication.

12, the contract period, Party B shall not establish labor relations with another unit, or Party A has the right to terminate the contract, and all the responsibilities and costs arising from the Party B shall be borne by the Party.

13, Party B, such as being investigated for criminal liability, Party A and Party B contractual labor relations are terminated, and therefore all the responsibilities and costs borne by Party B itself.

14, Party A to Party B to participate in accident insurance, Party B, such as accidental injury or death during the work period, the insurance company in accordance with the relevant provisions of the insurance claims contract.

15, Party B in the temporary labor or villagers labor export and other types of employment during the work, all due to violation of work rules, regulations and rules of unsafe accidents occurring by Party B to bear.

16, Party B due to leave, vacation, out of the expiration of the period and did not go to work on time, did not apply for separation procedures, according to their own separation from the treatment, and therefore outside the responsibility for all accidents occurring at their own expense, Party A does not assume any responsibility.

17, this agreement in duplicate, A and B each party to sign a copy, with the same legal effect.

18, this agreement is effective after both parties fill in the word, the termination of the contract expires on its own.

19, the two sides of this agreement to resolve the outstanding issues separately.

Signature of Party A: Signature of Party B:

Year Monthly

Safety Contract Part 4

Party A: Jilin Zhongyi Industry Co.

Party B: _____________________________

Article 1 On-site group of tower personnel must wear helmets, including accompanying workers.

Article 2 The tower should be set up in the tower site bar cordon or cordon road cone.

Article 3 The ground anchor bolts of the flange will be cleaned up and leveled before the tower is set.

Article 4 After the first section of the tower is assembled, the double nuts should be screwed on and firmly.

Article 5 The personnel on the tower must have a work-at-height license, and the personnel on the tower should wear safety belts and safety ropes.

Article 6 When the tower crane is hoisting the tower, no one is allowed to stand under the hoist to prevent falling objects.

Article VII in the assembly of sections of the tower, the staff do not make noise with each other, to keep the working environment relatively quiet, so as not to cause unnecessary trouble in the busy neighborhood or downtown group tower.

Article 8 The tower must be cleaned up after the completion of the site, do not throw the garbage everywhere, to wrap the garbage together and find a suitable place to dispose of it.

Article IX After the tower is completed, the tower should be adjusted vertically, such as the day time is not enough, must be the next day to adjust the tower vertically.

Article 10 The tower should be cleaned up before hoisting and the damaged places should be treated accordingly before hoisting.

Article 11 If the above requirements are not carried out, all the consequences are the responsibility of the construction company.

Article 12 The tower crew must strictly follow the tower construction procedures, and any personal damage to the tower crews in non-tower construction procedures shall be borne by the tower crews themselves.

Article 13 The tower crews shall strictly follow the safety agreement, and if the tower crews fail to follow the safety agreement, the tower crews shall be responsible for the personal injuries caused by the tower crews.

Article 14 The safety agreement is recognized by both parties *** with the same signature, and strictly in accordance with the implementation of this safety agreement, the safety agreement in duplicate, both sides of a copy, signed by both parties to take effect.

Party A: Jilin Zhongyi Industry Co.

Party B: _____________________________

Month of the year

Safety Contract Part 5

Party A: _____________ Phone number: _____________

Party B: _______________

Article 1: Party A voluntarily participates in Party B's group visits and tours, and undertakes to abide by the provisions of this agreement.

Article 2: Party A shall not participate in this tour if it has a heart attack. Party A travel may occur personal safety, economic, disease and other personal factors caused by sudden illness, Party B does not bear any responsibility, by Party A to bear their own.

Article 3: Party A shall not leave the team without authorization, bring unnecessary trouble to the collective or the team, or bear the consequences.

Article 4: In the visit, travel during the accident and responsibility, Party A make myself or others personal, property and other injuries caused by Party B does not bear any responsibility.

Article 5: Party A should pay attention to personal property and personal safety, shall not unlawfully take possession of other people's property, due to their own reasons for poor custody of property damage caused by Party A is responsible for, Party B does not bear any responsibility. Party A shall watch over its children and follow the unified arrangement and guidance of the tour guide during the visit and tour. No unauthorized action.

Article 6: If Party A causes damage to others, Party A shall bear all the compensation responsibility personally.

Article 7: Party A should strictly abide by the traffic rules, traffic accidents, the party responsible for the accident, Party B does not bear any responsibility.

Article 8: Party A has full capacity for civil behavior and voluntary participation. Willing to independently bear all the damage that may occur. On the way to play because of my own accidents and responsibilities are responsible for their own.

Article IX: This tour is led by _____________ company tours, to the national tourism regulations to buy travel insurance.

Article 10: This agreement is in duplicate, A and B parties responsible for each one.

This agreement can only come into effect after the signature of both parties, Party B determined that Party A returned to the school is automatically lifted.

Signature of Party A _______________ ________ ________ year _____ month _____ day

Signature of Party B:________________ ________ year _____ month _____ day

Sample Agreement on Safety Contract 3

Party A: _______

Party B: _______

In order to implement the policy of "safety first, prevention first, comprehensive management", to protect the lives and health of construction workers, to protect the national enterprise property from loss, to strengthen the safety of the construction site, to eliminate all kinds of safety accidents, according to the relevant laws and administrative regulations of the state. According to the relevant national laws and administrative regulations, Party A and Party B negotiated the development of safety responsibilities are as follows:

1, Party B in the first three days before entering the establishment of the unit and Party A corresponding supporting safety management system, the project manager of Party B to organize the implementation of the "Beijing Construction Enterprise Safety Production Responsibility System" according to the scale of construction and the number of workers, the setup of the safety production management agencies, with full-time, part-time and group from the safety organization to supervise the safety of the production work.

2, Party B should strictly implement the "Chinese People's *** and State Security Law" "Construction Safety Regulations" to implement the state, industry safety, labor protection and fire safety regulations, rules, regulations, and comply with the enterprise's management system, the construction of the construction of strict compliance with the "Beijing Building Construction Safety Regulations" will be the safety of production into the whole process of construction production.

3, Party B is fully responsible for the safety protection of the construction site, pro-electricity safety management, machinery safety management, machinery safety management.

4, Party B construction, Party B must be construction workers safety education. Party B construction personnel must wear a badge to enter the site, special operators must also wear a badge, special operators must also carry a special operations license. Party A personnel have the right to inspect at any time.

5, Party B should set up obvious signs in the construction area, for a longer period of concentrated construction projects to do closed processing, construction personnel should be in the construction area activities, do not enter the non-construction area, Party A personnel have the right to check at any time.

6, Party B construction team's safety protection equipment must be configured in place, the safety measures are effective, or will not be allowed to start operations.

7, Party B in the construction process, such as the need to use water, electricity, etc., Party B must fill out the application form, agreed to by Party A, designated by the professionals to receive water, electricity, electrical wiring and piping connected to the standardized, and by the installation of qualified meters before use. The required cost shall be borne by Party B. Party B in the construction site to use temporary electricity, A and B must sign a "construction site temporary electricity management agreement".

8, if the construction process requires fire operation, approved by Party B's safety management personnel and confirmed to meet the fire conditions, the implementation of safety precautions before the fire operation. Party A personnel have the right to check at any time.

9, Party B in the construction site construction, in advance to Party A reported to the construction site application form and the number of operators. Party B materials out of the field, reported to the Ministry of Materials in advance, and open the door note. Party B's construction vehicles into the field, the speed shall not be greater than 5Km / h, out of the gate must be checked by the duty officer.

10, the construction process, Party A has the right to inspect at any time, the right to stop illegal operation, the right to violate the station safety provisions of the behavior of the penalty or order Party B construction team to stop work and rectify.

11, Party B in the construction process of the day produced by the garbage as far as possible the same day clean up. After the end of construction, Party B should be thoroughly cleaned up the construction site, so that the work is done, the material end, the site clear. Clean out the garbage can not be arbitrarily piled up in the management of the site, or according to the reality of the fine, the external pollution, traffic and other accidents by Party B is responsible for.

12, due to the construction of the construction site, Party B safety, civilized construction, environmental protection (including earth and slag transport) is not up to standard by the development, supervision and government law enforcement departments to punish, all the costs of loss have Party B to bear, Party A has the right to double the penalty on the basis of the original.

13, Party A has the right to penalize the Party B unit that violates this Agreement based on the "Project Subcontracting Management Manual", "Regulations on Safe Production Management of Construction Projects" and relevant documents and project penalties in Beijing (attached).

The actual situation of fines, external pollution, traffic and other accidents occurring by Party B is responsible for.12, due to the construction of this construction site, Party B's safety, civilized construction, environmental protection (including earth and slag outbound) did not meet the standard by the development side, supervision and government law enforcement agencies to punish, all the costs of damage have Party B to bear, Party A has the right to double the penalty on the original basis.13, Party A has According to "Project Subcontracting Management Manual", "Construction Safety Management Regulations" and Beijing relevant documents and project penalties (attached), Party B will be penalized for violation of this agreement.14. This agreement will run through the entire construction process, and the content not included in it will be implemented according to the relevant national and Beijing standards, and if there is any latest decree or regulation in Beijing, it will be implemented according to the new decree or regulation.

Supplementary Agreement

Party A (signature and seal): _____ ___months___

Party B (signature and seal): _____ ___months___

Safety Contracts Part 6

Name of Party A: Yanchang Oilfield Dingbian Oil Extraction Plant

Name of Party B:

I. Purpose.

In order to further clarify the safety responsibilities assumed by both sides in the construction process, to protect the safety and health of construction personnel, to prevent the occurrence of employee casualties, to protect the safety of Party A's production order, according to the "Chinese People's *** and the State Work Safety Law" and "Labor Law" and the provisions of the relevant laws and regulations, the signing of the agreement on the safety of the construction of the oil wells.

Second, the construction time: year months to year months

Third, the name and location of the project:

Fourth, the content of the agreement

1, Party A's rights

1 have the right to require Party B to Establishment of safety organizations, strict implementation of safety regulations, standards, compliance with oil production plant safety regulations, the development of emergency response plan, the establishment of safety signage and so on.

(2) have the right to require Party B must fulfill the production safety duties, and supervise Party B's fulfillment of production safety duties.

(3) The right to warn, stop work and rectify, and fine Party B when it is found to have violated the regulations.

(4) The right to require Party B to maintain the relevant production safety facilities, equipment and devices.

(5) Have the right to manage the safety of Party B's equipment and facilities.

(6) The right to supervise, inspect and deal with the safe operation of Party B's construction work site.

(7) After an accident, participate in the accident investigation according to the relevant regulations and report the accident statistically.

2. Party B's safety responsibility

(1) Party B shall have the safety production conditions stipulated in the Work Safety Law and relevant laws, administrative regulations and national standards. It must improve the safety organization, establish the production safety responsibility system, develop the health and safety environment operation instruction for the construction operation project, equip the necessary labor protection supplies according to the requirements, and implement the relevant safety system of Party A.

(2) Organize safety inspections according to the regulations, and take effective measures to actively deal with and report to Party A when unsafe hidden dangers and major risks are found in the course of operation.

(3) Formulate emergency response plan for safety accidents, and if an accident occurs, it should be started in time and implemented in accordance with the rescue procedures. When an accident occurs, it should actively rescue, obey the unified command, avoid further expansion of the accident, and report the accident according to Party A's requirements.

(4) Should maintain the relevant production safety facilities, equipment and equipment.

(5) Shall carry out safety education and training for the operating personnel, with corresponding safety awareness and safety skills; special operating personnel shall have corresponding qualification certificates.

(6) to protect the environment, trees and lawns, restore vegetation, garbage, feces, sewage, centralized closed treatment, shall not be arbitrarily piled up and discharged, to prevent sewage, crude oil leakage. The oil pollution generated in the operation is promptly recovered.

(7) construction personnel work must be uniformly wearing labor insurance clothing, is a special operator must carry a special operating license, the construction area to set up obvious signs, the use of construction sites to do closed with the warning tape, Party B construction personnel shall not enter the non-construction area at will.

(8) must comply with Party A's management system and special requirements for safety and construction.

(9) In case of accidents, Party A and Party B have the obligation of rescue and disaster relief, and the costs incurred shall be borne by Party B.

(10) Accidents occurring shall be subject to accident investigation to confirm responsibility; accident reporting and investigation shall be carried out in accordance with relevant state regulations.

(11) Party B contracted construction of all personal injury and death accidents and economic losses (non-Party A reasons), Party B bears full responsibility, and in accordance with the provisions of the responsibility of the relevant personnel and report to Party A; due to the quality of Party B's works caused by the accidents, Party B bears the responsibility.

(12) Party B's construction workers are responsible for their own work injury insurance.

(13) All losses caused to Party A by accidents occurring during Party B's construction that are not Party A's responsibility shall be borne entirely by Party B.

(14) Party B in the construction process, due to conflicts with the local townspeople need to be caused by environmental pollution, personal injury and other accidents, Party B to solve their own problems; and therefore the losses caused to Party A, fully borne by Party B.

(15) Party B must strengthen the HSE management of the production site, strictly implement all the provisions and requirements of the unit and Party A's HSE management, and accept the inspection of the relevant departments of the local government; due to the lack of in-place management of the production site, caused by the local government fines, the loss of which is borne entirely by Party B; thus causing losses to Party A is borne by Party B; therefore, the hidden dangers left behind, Party A in the When the project cost is settled, Party A has the right to take the deduction to penalize.

(16) All the consequences caused by Party B's violation of the safety agreement, the responsibility is entirely borne by Party B.

(17) Party B in the construction of safety, environmental protection accidents, Party A will be based on the nature of the accident, the proportion of responsibility, deduction of part or even all of the security deposit, and ultimately to the safety and environmental quality supervision section of the refund bill.

V. Liability for breach of contract

This agreement shall enter into force upon signature and seal of Party A and Party B, and shall have the same legal effect, and both parties shall implement it seriously. If a security incident is caused by Party A or Party B's breach of contract, the responsibility will be investigated according to law. This agreement in duplicate, A and B each party to sign a copy, effective from the date of signing.

Party A (official seal) Party B (official seal)

The person in charge of Party A: The person in charge of Party B:

Phone: Phone:

Year Month Day Year Month Day

.