How to write the self-evaluation report of construction project acceptance?
The project quality evaluation report is a report that the supervision engineer correctly evaluates the project quality of the unit project, sub-projects and some sub-projects after completion according to the daily inspection and the situation mastered by the side station and combined with the preliminary inspection opinions of the project. It is an objective and true evaluation of the project quality by the supervision engineer, one of the main contents of the supervision data, and also an important basic data for the quality supervision station to verify the quality grade. The contents of the project quality evaluation report should generally include the general situation of the project, the basis of quality evaluation, partial projects, quality evaluation and quality evaluation opinions. \x0d\3. 1 project overview \x0d\ should explain the geographical location, building area, design, construction, supervision unit, building function, structural type and decorative features of the project. \x0d\3.2 Quality evaluation basis \x0d\( 1) design document; (2) Standards for quality inspection and evaluation of construction and installation projects, specifications for construction acceptance and corresponding current national and local standards; (3) Current national and local measures and regulations on quality management of construction projects. \x0d\3.3 Division and quality evaluation of subdivisional work \x0d\ The quality evaluation report of subdivisional work shall describe the division of subdivisional work and the self-evaluation of quality grade by the construction unit, mainly reflecting the daily verification of quality grade of subdivisional work by the supervision engineer. Foundation and foundation engineering should also focus on the construction quality of pile foundation, the main engineering division should increase the observation of building settlement and the evaluation of concrete strength, and the brick-concrete structure should explain the evaluation of mortar strength. In the preparation of the unit project quality evaluation report, it is necessary to briefly describe the quality evaluation of the engineering, equipment installation, height and trial operation of each division. This paper focuses on the review of quality assurance data and visual quality evaluation. , reflecting the structural safety of the project, important use functions, quality characteristics of decoration engineering, etc. In addition, it should also indicate whether the building has abnormal settlement, cracks and inclination. \x0d\3.4 Quality evaluation opinions \x0d\ The supervision unit shall have clear opinions on the evaluated division, disciplines and unit projects. After the completion of the unit project, the supervision engineer can evaluate the quality grades of the sub-projects and sub-projects according to the on-site inspection and the spot check of the sub-projects grades. The supervision engineer should evaluate the structural safety, important use functions and main quality conditions of the project according to the quality evaluation of the main body and decoration projects, quality assurance data review and visual quality evaluation, and should have exact quality evaluation conclusions \ x0d \ x0d \ have a real sample of self-evaluation report) and send them to you!