Village Road Maintenance Meeting Minutes Template Three

Village Road Maintenance Meeting Minutes Template Three

Village Road Maintenance Meeting Minutes 1

Time: February 20, 20xx

Place: Village Committee Office

Content: Discussion on the widening and hardening of the village road in Zhongchang Village

Participants: village branch committees, the village three bosses, all group leaders and village representatives **** 55 people.

Presiding Officer: Xia Dongming

Recorder: Ning Hongxia

After the village? two committees? Will study, decided to convene the village trunk road hardening public welfare construction of villagers people - the main deliberative meeting, should participate in the village representatives of 72 people, now the actual presence of 65 people, more than 2/3 of the number of people who should be present, you can meet.

Speaker: Xia Dongming I. Xia Dongming introduced the basic situation and topography of the village.

Today's meeting was held to discuss the widening and hardening of the village highway. The transportation in our village is closed, which seriously restricts the development of village-level economy.

II. Analyze the village economic situation and development

Our village branch of the two committees spent nearly 1 month to conduct a full public opinion survey to understand the villagers' willingness to repair roads. Villagers traveling rainy days covered with mud, sunny days covered with dust, for this reason, to solve the road difficult confusion, it has become the local villagers for many years of desire. By visiting the old party members, old cadres and the local prestige, appealing to the masses, ask their views, to do the people - the intention of the heart. Through door-to-door visits and surveys, the vast majority of people in the village have a very strong desire to repair the road, and the villagers have been fully mobilized to repair the road, showing active participation in repairing the road ` enthusiasm. We all know that the village economy is weak, have expressed their willingness to contribute to the hardening of the village highway.

III. About my village highway widening and hardening, route, highway length of 6000 meters, need funds 1.8 million yuan.

Fourth, the source of funds

1. To find local bosses and friends from all walks of life to donate money.

2. To the higher authorities for funds

3. Mobilize all villagers to collect 15 yuan per capita and other channels to raise funds.

4. Construction.

My village plans to widen and harden the village road. The length of 6000 meters, pavement width 4 meters, thick 20CM, (concrete pounding). The use of contract labor, each kilometer cost about 300,000 yuan, the construction period of about 2 months. The repair of the village road will greatly facilitate people's travel, improve people's production and living conditions, but also will make the village's economic development. The village road construction of the fund-raising object for all village road beneficiaries, in accordance with the standard of 15 yuan per person to raise funds.

V. On the implementation of the program, staff organization, the meeting to determine.

Through the secretary of the launch and the strong demand of all participants, we are confident, state that we must get this village highway, change the long village backward state, to solve the problem of villagers travel difficult, difficult to do. Elected road formation team:

Commander-in-chief: Xia Dongming Tao Guoqiang Liao Zhongluo

Site management personnel: Ning Kaiming Xia Xueming Xia Yunfu

Liao Zhongluo speech:

On today's meeting we all have the confidence to make the village road better. I see from tomorrow onwards please everyone here to do a good job of publicity, we will organize door-to-door fund-raising, as soon as possible with the local bosses to approach, ask them to voluntarily and enthusiastically donate part of the funds, about the upper level of funding please secretary responsible for the appearance.

The meeting has been decided, no objection. Please sign the statement. (Attached)

Lotus Township, Zhongchang Village Villagers Committee 2011.2.20

Village Road Maintenance Meeting Minutes Template 2

January

1. Summarize the situation of safety production in the area of the village in the past 14 years, and lay out the work of safety production in 15 years. Organize personnel in accordance with the division of responsibilities, the enterprises, residential settlements, all kinds of stores to carry out a thorough inspection. Inspection content is mainly whether there is a dangerous house, electricity safety, safety inspection fire, food hygiene, etc., the inspector did not have to check one by one, leaving no dead ends, found that the problem of timely supervision and rectification, there are major security risks to the degree of units, must be reported to the town security department.

2. Volunteer fire - defense - team personnel, must be able to do a fire failure occurs when the fire can be timely out of the water, the points of the hydrant to be in the heart of the clear, familiar with the roads in the village, the location of the enterprises know.

3. Organize voluntary fire - prevention - team to carry out field exercises fire prevention knowledge, support each business unit door-to-door inspection, while carrying out on-site exercises trial.

February

1, on the last stage of production safety work report.

2, the layout of the unit production safety tasks, and door-to-door signing of the certificate of responsibility for production safety.

3, the village area of production safety inspection, fire inspection, public **** gathering place housing safety inspection, foreign vehicle mapping registration place registration, tea stove basic statistics.

4, voluntary fire - defense - team fire drills.

March

1, the village director reported on the last stage of production safety: ① to safety production management personnel in the village to conduct an inspection visit to the work of the enterprise, found that there are hidden dangers to the safety of the work of the unit pointed out in a timely manner to urge rectification; ② in the inspection found that there are individual enterprises are not responsible for the work of production safety, the individual owners of enterprises do not pay attention to the safety of the work of the work of production, I The owner of the enterprise was severely criticized, and a deadline for rectification, and into the equipped with a dedicated production safety work, the idea should pay attention to production safety work.

2, the area of the construction team to check, the village fire facilities, fire hydrant inspection.

3, to carry out the village voluntary fire - defense - team drills, for the village safety work to be fully prepared.

April

A, the support committee to convey the spirit of the higher documents

(1) to further strengthen the legal system and mechanism of production safety construction

(2) to further strengthen the production safety guarantee capacity building

(3) to further strengthen the production safety supervision team construction

Second, the support committee Wu Jinbao layout of this month's security Production work

(1) Solidly do a good job? Two meetings? Safe production work

(2) Increase the daily inspection of production safety of enterprises within the jurisdiction, to ensure that there is no? three-in-one? The company's business is to provide a wide range of products and services to the public.

Third, the branch secretary speech

(1) to recognize in place

(2) to check in place

(3) to inform in place

(4) to record in place

May

a. In accordance with? Production Safety? and Responsibility for the implementation of the system. System deployment work, based on production safety laws and regulations, crack down on all kinds of illegal, illegal production and construction operations, resolutely rectify the governance, banning production and operation units that do not meet the safety production conditions, effective prevention, resolutely curb the occurrence of production safety accidents.

Second, in the ? May Day? Before the arrival of the holiday, the person in charge of each area to take the lead in the area responsible for a production safety inspection, and in the ? May Day? During the holiday by the village director, secretary is responsible for, each area responsible for taking turns on duty, be sure to do a good job of holiday safety.

June

1, the rapid implementation of the month of production safety and electricity publicity activities;

2, to quickly organize a forest fire prevention work inspection, to ensure fire safety;

3, the community should quickly organize the force, a large-scale inspection, to increase the safety efforts.

4 power supply department to the village-wide power supply lines and large electrical equipment to carry out a thorough inspection

I hope that you will seriously understand the spirit of the meeting, and seriously carry out inspections, inspections, find problems, solve problems. Do not have accidents, a high degree of responsibility for people's lives and property, and promote the village safety work to a higher level.

July,

1 to strengthen the summer vacation safety management of students, urge parents to improve safety awareness.

2, in the village ponds, reservoirs and other places where you can swim tree warning signs,

August

Received the county county documents, the requirements of the document in my village jurisdiction to carry out a production safety inspection. The safety of wildfire as the focus of the inspection. Problems arising during the inspection were corrected in a timely manner, and the circumstances are serious enough to give the appropriate penalties and notification of criticism.

Strengthen the management of the use of liquefied gas

⑤ Strictly in accordance with ? Clear responsibility, in accordance with the law, combined with blocking, standardized management? the overall principle of focusing on remediation.

Village Road Maintenance Meeting Minutes Template 3

In the afternoon of September 28, 20xx, Hengqin New Area Public **** Construction Bureau Director Chen Yilan presided over the coordination meeting of the road maintenance of the East Circle Road and the Center South Road, Zhuhai Dahongqin Investment Company Limited (hereinafter referred to as Dahongqin Company), Zhuhai Zhongyue Infrastructure Construction Investment Company Limited (hereinafter referred to as Zhongyue Company), Zhuhai Engineering Supervision Company Limited related to the meeting. (hereinafter referred to as CMC), Zhuhai Engineering Supervision Co.

At present, Hengqin Island municipal roads BT project has been fully implemented, the existing East Ring Road and Center South Road due to the construction of the road surface is seriously damaged. Due to the two roads to take into account the construction of access and social daily traffic double function, and construction of road maintenance responsibility is not the original municipal maintenance unit services, must be clear during the construction of the road daily maintenance responsibility to protect the safety and smooth. The parties reached agreement on the road maintenance and funding arrangements. Summary is as follows:

First, on the way the road maintenance. The meeting decided that the East Ring Road (Hengqin Bridge to Hongqi Village) and the center of South Road (bus section) the next road maintenance work by the EPC unit is responsible for the implementation of the maintenance work, including the status quo maintenance and follow-up maintenance, maintenance time until the new East Ring Road when the traffic. Supervision company is responsible for the supervision of road maintenance to ensure that the progress and quality of road maintenance to meet the needs of social vehicle traffic.

Second, on the issue of road maintenance costs. The meeting decided that the cost of road maintenance on the east side of the island and the center of the South Road into the Hengqin New Area municipal infrastructure (BT) project? Three through one leveling? Costs, including June 2011 - September period successively completed the cost of road repair works on the East Circular Island Road.

Third, on the issue of carrying out road treadmill. In order to ensure that the road repair work can completely solve the problem of municipal road maintenance during the construction of the BT project, the meeting decided that the company led by the Metallurgical Company to organize the big Hengqin company, design units, supervision units, EPC implementation of the responsible unit to carry out on-site site surveys, a comprehensive understanding of the current state of the road damage as well as possible future damage, and seize the time to complete the construction plan design and specific construction program, on October 15, 2011 to report to the big Hengqin company. October 15, 2011 to report to the Grand Hengqin Company.

Fourth, on the issue of carrying out road repair. The meeting requested CMC to organize the EPC unit as soon as possible to carry out the repair work of the East Ring Road and the Center South Road first, the amount of repair work into the total amount of work determined in the road maintenance program.

Participants: Chen Yilan, Wang Quan, Yang Jian (Public **** Construction Bureau), Chen Yixin, Chen Guohua, Lin Liuhan (Dahongqin Company), Wang Zhandong, Li Jian, Zou Shurong (CMC), Chen Dagang, Jiao Minggang, Cai Dong, Song Zengli (China XX Metallurgical Group Co., Ltd.), Hu Qin (Zhuhai Engineering Supervision Co.,Ltd.

?