Simple scaffolding contract

Simple version of scaffolding contract template

Simple scaffolding contract mode, with the increasing legal awareness of China citizens, more citizens will choose to use legal weapons to protect themselves. As a legally effective manuscript, contract has become a common manuscript in daily life. The following is a simple scaffolding contract model.

Simple scaffolding contract 1

Party A:

Party B:

In accordance with the Economic Contract Law of the People's Republic of China and the Regulations on the Contract of Construction and Installation Projects, and with the purpose of strengthening management, ensuring safety, quality and benefit, and creating excellent products together, Party A agrees to contract the external wall scaffolding project to Party B through consultation and reaches the following agreement:

I. Project Location:

Two. Commencement date of the project: year month day,

Completion date: year

Third, the contracting method: materials contracting, erection of double outer frame steel pipes, 300 springboard, a layer of net, the service life is two months.

Fourth, the total project price:

Calculated by the construction area, RMB per square meter, with a total construction area of square meters. The total price is yuan. According to the actual erection area, the unit price per square meter includes: materials entering and leaving the site, scaffolding erection and dismantling costs, scaffolding management costs, and the loss and loss of all pipelines and pipe sections during the two-month service period from entry to exit.

Function of verb (abbreviation of verb)

1. Double exclusive scaffolding shall be erected for steel pipes of facilities as required.

2, transportation, loading and unloading materials needed for external scaffolding.

3. Party A shall provide Party B with material storage yard, accommodation space, embedded parts of scaffold reinforcement and hoisting machinery.

The responsibility of party a with intransitive verbs

1. Party A sends construction technicians to guide and solve related problems in construction at any time.

2. During the construction, Party A shall not throw things into the air or tamper with Party B's scaffolding at will. If the shelves are damaged, Party A shall bear relevant responsibilities.

3. Party A shall not damage scaffold reinforcement facilities or overload stacking, and Party A shall bear relevant responsibilities for safety accidents caused thereby.

4. Party A's other use of Party B's materials shall be subject to Party B's consent and approval, and relevant procedures shall be handled.

5. Party A shall complete the project according to the completion date, and Party B shall dismantle the scaffold on time. If Party A fails to complete the project on the completion date, resulting in delay, Party A shall compensate RMB yuan per day, and provide Party B with the material rental fee and related expenses. If the payment is not made within one month, Party B has the right to dismantle the scaffold, and Party A shall bear all economic losses caused by dismantling the scaffold.

Seven. Party B's responsibilities:

1, scaffolding must comply with the relevant provisions, construction by the chapter. Springboard laid in place, bag net installed in the room (according to the specification.

2. Party B must obey the arrangement and guidance of Party A's construction personnel and accept Party A's inspection at any time.

3, scaffolding in the process of erection, shall not affect the construction progress of Party A. ..

4. During the use of scaffolding, Party B is responsible for fine-tuning the scaffolding and cooperating with Party A to use it.

Eight, dismantling scaffolding, Party A shall issue an alarm or announcement, notify the construction team, to assist in safety protection measures.

Nine. Payment terms:

When Party B's materials enter the site, Party A will pay 30% of the material entrance fee of about 10000 yuan according to the number of trains, and when scaffolding is erected, (because of the second erection: when the first erection is completed, Party A will pay 80% of the project payment according to the construction area, that is, yuan, and 80% of the project payment, that is, yuan; After the scaffolding is removed, I will pay it in one lump sum.

10. After Party B's scaffold materials enter the construction site, they shall be jointly managed by both parties. The construction team or other personnel who steal scaffold materials will be fined 20_ yuan each time. If the circumstances are serious, it will be handed over to the public security organ for handling.

XI。 This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties. After the project is completed, the money will be void after settlement.

Party A (official seal, _ _ _ _ _) and Party B (official seal, _ _ _ _ _ _)

Legal representative (signature, _ _ _ _ _ _)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Simple Scaffolding Contract 2 Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In order to make the project construction go smoothly, ensure the project quality, safety and construction period, and improve the economic interests of enterprises and employees. In accordance with the provisions of relevant laws, in line with the principles of equality, mutual benefit and voluntariness, combined with the actual situation of this project, through friendly negotiation between both parties, Party A contracted the scaffolding sub-project of this project to Party B in the form of cleaning, and in order to clarify the responsibilities and obligations of both parties, the following agreement is hereby concluded:

Article 1 Name and location of the project:

1, project name: XX project.

2. Project location: XX

Article 2 Content and scope of the project:

1, XX scaffold component project construction.

2. Work content: According to the structure of this project, prepare the erection and demolition plan, draw the construction plan, classification report and material plan, and ensure the safety of climbing stairs (ramps) in the foundation pit (mixer, entrance and exit, protective shed) around the house; Scaffolding outside the main body, hole, temporary roof erection, stair erection and demolition, protective shed and limb protection, and isolation net demolition; Scaffolding, safety net enclosure hanging, rotating, dismantling, fittings embedded; Oiling fasteners; Left hand cleaning work, on-site transportation. When the materials used in this type of work come into play, two people shall be assigned to unload the new steel pipe, and the old steel pipe shall be unloaded by itself; Stacked connectors and temporary removal and temporary fixation in the process of exterior wall decoration; Embedding, fixing, welding and cutting of the pull-tab; After demolition, all the materials of this project will be cleaned up and piled up in the place designated by Party A ... Untie the parts, dismantle the safety net and put them into storage, and set up temporary sheds and sheds on site. Including steel bars, carpentry, tool rooms and other operating sheds, not including the erection and dismantling of material hoists, but including the laying of access doors and access plates, not including the painting of new steel pipes, and this work has no point operation.

Article 3 Form of contract: Contract settlement.

Article 4 Contract Fees and Settlement Standards

65438+

(1) salary and bonus.

(2) various allowances. And dinner. Health care and other subsidies

(3) Labor insurance benefits, labor insurance supplies, heatstroke prevention drinks, and anti-freezing and heating.

(4) Unproductive employment: including social compulsory employment, meetings, study, training, visiting relatives, etc.

Such as labor and travel expenses, downtime due to climate impact, special downtime, etc.

(5) Recruitment, entry and exit of operation team members, transfer between construction sites and other expenses.

(6) Horizontal transportation of components at the site, loading and unloading of materials within the scope of this type of work.

2. Party B promises that the security deposit for the quality and safety construction period of scaffold project is RMB 3,000 Yuan only (submitted before this contract comes into effect), and the security deposit will be returned after the main body, without interest.

3. Party B will not pay the living expenses in advance after entering the site. Party A will pay the living expenses according to the amount of work completed each month and approved by the quality, safety and construction management personnel of the project department. The attendance rate of each person per month is not less than 25 days, but the personnel who pay the living expenses must have the certificate of safety officer, have received tertiary education, and have workers with valid badges made by the project department. Otherwise, they will not get paid. Pay 60% of the total price after the main body is capped. When the quality of the project department is reached, all the project funds shall be settled within 45 days after the scaffold is dismantled. The insufficient part shall be paid in advance by Party B. If the salary of each employee or card employee is not paid in time, the interests and reputation of the company will be damaged by complaining to the relevant departments, and a fine of RMB will be imposed each time.

4. If Party B withdraws from the construction midway due to abnormal reasons, the settlement between Party A and Party B shall be calculated according to 50% of the actual completed engineering quantity. According to the actual reasons, decide to refund or confiscate the deposit.

5. The safety helmet, work clothes, raincoat and safety belt required by Party B at the site shall be collected by Party A, and all personnel shall be provided, and the expenses shall be borne by Party B. ..

6. In case of major inspection by the department at the next higher level, this team is responsible for all the work that should be handled urgently within the scope of this type of work. If the responsibility scope with the brother team is not clear, the project department will decide who will clean it up.

Article 5 the construction period standard

Party B must organize enough construction technical force to complete the project ahead of time or on time in strict accordance with Party A's overall sub-project schedule, so as to closely coordinate the work types. If Party B delays the construction period or stops work for no reason, the impact and construction period will be borne by Party B, and Party A will impose a fine of 200 yuan/day on Party B, which will be deducted from the deposit. If the deposit is insufficient, it will be deducted from the monthly salary.

Article 6 Quality standards

1, scaffolding, protection and other scaffolding projects must be erected according to the current safety technical specifications for building construction fasteners or steel pipe scaffolding. The construction quality must meet the current "Building Construction Safety Inspection Standard" and the excellent standard of standardized acceptance of the municipal safety supervision station. If the installation does not meet the requirements, it must be reworked and rebuilt, and the expenses arising therefrom shall be borne by Party B. ..

In the case that safety in production, civilized construction, quality and other reasons affect the provincial standardization selection of this project.

The liquidated damages shall be calculated as 10% of the total contract price of Party B, and the on-site construction quality, safety, civilized construction and environmental protection shall be rewarded and punished according to the public security management clauses and systems of the project department.

Article 7 responsibilities of both parties

(I) Party A's responsibilities

1. Fully perform the contract to ensure the normal construction of Party B. ..

2. Take safety construction measures according to the construction plan to ensure the safety production of Party B's laborers and the accommodation of 10 people.

3. Be responsible for the secondary safety education for Party B on site. ..

4, responsible for technical disclosure, acceptance, site construction and deployment; Material procurement.

5. Coordinate the internal and external construction environment and provide various logistics services for Party B's operation.

(II) Party B's responsibilities

1. Strictly implement the rules and regulations of the project department, organize qualified labor to enter the site for construction according to the construction progress of Party A, accept the supervision, inspection and guidance of relevant personnel and all walks of life with an open mind (special types of work require certificates), and be responsible for maintaining and managing all construction machinery and labor protection facilities of this type of work to ensure normal production. Complete the production tasks of Party A's production department on time. When the project department needs Party B's cooperation, it must obey it completely. No additional conditions are allowed.

Party B is responsible for the erection of scaffolding and the inspection and acceptance of safety protection materials. Unqualified materials shall not be used in this project. The fastener loss rate is 1%. Party B shall be responsible for the excess, and Party A will reward the excess according to the market price. The steel pipe has no loss. The loss does not include the damage caused by fastener quality problems and nut slippage.

2, the work between teams and groups must be friendly, cooperate with each other, don't shuffle.

3. Party B's construction personnel are not allowed to visit relatives at the construction site, and no accommodation is arranged at the construction site. In case of special circumstances, it must be approved by the project department, and the safety education of family members should be done well, and children should be closely monitored by their families. It is forbidden to cook in the dormitory and pull the wires without permission. After investigation, the apparatus will be confiscated and fined 100 yuan each time. Any accident shall be borne by Party B. ..

4. If there is any conflict during the construction, report to the person in charge of the site in time to find a solution. It is forbidden to gather people to fight. 500 yuan will be fined every time there is a fight at the construction site, with or without reasons. If it is found that the responsible person participates in or instigates the contractor, the responsible person will be fined one thousand yuan each time. Gambling is strictly prohibited on the construction site or in the dormitory. The fine of 100 yuan for each discovery shall be deducted from the quality guarantee fund. If the public security organ violates the law, the project department will not bear any responsibility.

5. When laborers enter the site for construction, they must carry out three-level safety education and strictly implement safety rules and regulations. In case of a safety accident, if the reason is found out, Party B will deduct the quality deposit, bear the actual loss of the accident, investigate the responsibility and take heavy punishment measures according to the severity of the responsibility. In case of other accidents, Party B shall be responsible for the medical expenses within 1 1,000 yuan, while Party A shall bear 70% and Party B shall bear 30% of the expenses beyond 1 1,000 yuan.

6. Actively cooperate with the quality and safety department of the project department, do a good job of communication, sign safety responsibility letters at all levels in time, and implement the responsibility system for production safety at all levels.

7, safety accidents should immediately organize rescue, and protect the scene, immediately report, it is forbidden to hide the accident.

8. Party B's contractor is the first person responsible for the safety production of this type of work, taking the lead in obeying the law and discipline, strictly prohibiting illegal command, accurately locating safety, quality, progress and benefits, and ensuring that all construction personnel move in all directions.

9. Actively cooperate with the safety knowledge learning, publicity and amateur classes organized by the project department, and implement it to every employee, so as to truly achieve a safety atmosphere of safety first, prevention first and people-oriented.

10. Party B must ensure that the team leader and full-time technical quality and safety inspectors are in place. If it is not in place, the project department has the right to punish 100 yuan/day.

Article 8 Supply of materials and equipment

1 Scaffolding materials shall be purchased by Party A, and Party B shall submit a dosage plan in writing 15 days before use.

2. The machines and tools used for erection and protection shall be provided by Party B. ..

3. Party B shall not waste materials or cut steel pipes at will. Party B shall bear all losses caused by man-made waste of materials.

Article 9 Others

1. Party B must fully and effectively organize on-site construction personnel to meet the progress needs of this project and put an end to subcontracting. In case of subcontracting, Party A has the right to terminate the contract and confiscate the deposit.

2. Party B shall obey the management and command of Party A, implement various rules and regulations of the Project Department and abide by national policies and decrees. When Party B fails to meet the requirements of this agreement due to management confusion, quality and safety, and the construction period fails to meet the requirements of Party A, Party A has the right to unilaterally terminate the agreement and arrange another team for construction. When the agreement is terminated, the settlement shall be terminated according to the amount of advance payment by installments, and the balance and deposit shall be used to make up for the losses of Party A..

3. This agreement shall come into effect after being signed by both parties, and shall be terminated after the completion of this project. This agreement is made in triplicate, two for Party A and one for Party B. Matters not covered shall be implemented according to the relevant regulations of the Project Department, and the above agreements shall be jointly implemented by both parties.

Party A: (Seal) Party B: (Seal)

Representative (signature) Representative (signature)

Date: Year Month Date:

Simple Scaffolding Contract 3 Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B enter into this contract through consultation.

I. Overview of the Project:

Project name:

Project location:

Project scale:

Engineering structure:

Second, the way of contracting: contracting.

Three. Scope of contract:

1. Erection and removal of external scaffolding: including erection and removal of external scaffolding required for formwork support and reinforcement of overhead floor and main structure, enclosure scaffolding required for concrete pouring and formwork reinforcement of each floor (its periphery exceeds the working face 1.5m to meet the needs of outdoor backfilling earthwork), and secondary erection and removal of external scaffolding required for later masonry and decoration construction.

2. The erection and removal of scaffolding outside the overhead floor and the main structure floor, including all safety fences and purse seines, should be cleaned up in time. I-beams are all dismantled and reinforced, I-beam steel rings are reinforced, steel pipes and iron pieces reinforced by embedded wire ropes are embedded, and hard pavements (wooden boards and bamboo springboard) on cantilever I-beams are removed.

3. Construction and demolition of temporary and permanent facilities such as steel structure construction shed, on-site safety billboard, construction passage, viewing passage, mixer, generator room and tower crane platform.

4. One or more times of foundation pit (erection and removal of the external protection of cantilever I-beams from the first floor to the first floor, and erection and removal of all temporary protection such as stairwells, elevator shafts, wind shafts and balconies required by the construction site).

5. Set up, transfer and locate the unloading platform in time according to the construction needs, and bury and dismantle the steel hoop and steel wire rope.

6, elevator shaft, wind shaft every three layers laid a hard protection, elevator door hanging anti-falling iron gate (iron gate provided by the project department, and timely inspection and cleaning.

7, the construction site steel pipe, fastener materials clear in time, according to the designated place neatly stacked, obey the deployment, all the facade. The steel pipe must be painted in advance, and the bracing steel pipe should be painted with yellow and black flowers (the materials are provided by Party A, and whether to paint is decided by the engineering project department.

Fourth, the quality requirements:

Party B must construct in strict accordance with the specifications, carefully arrange materials, ensure safety, firmness and beauty to the maximum extent, and actively cooperate with the inspection and acceptance of functional departments at all levels. The safety maintenance network must be hung in time and arranged regularly. Scaffolding should be erected at four corners, with one jump and three horizontal. The staggered connection of each hop is not more than 40 cm, and the spacing between vertical poles is not more than 1.5m, and each hop is 1.8m, with middle arrangement. Scaffolding, I-beam steel ring embedment, I-beam placement, wire rope embedment, scaffold erection and dismantling should provide feasible construction scheme in advance, and construction can be carried out only after consultation with project management personnel. In the process of construction, Party B must unconditionally accept the supervision of Party A's safety supervision, and rectify the problems in time when found. If the quality problem of scaffolding affects the construction progress, Party B will be fined 1 1,000 yuan for every day of delay in the construction period, and bear all the safety accidents caused by it.

Five, the time limit for a project requirements:

Party B must obey the management of Party A, carry out the construction in strict accordance with the image schedule arranged by Party A and the Engineering Department, actively provide the material plan, and carefully arrange the construction in combination with the actual situation on site and the rhythm of the construction period. Party B will be fined 1 1,000 yuan a day if it fails to meet the time limit requirements and affects the construction of other teams and groups.

Six, safe and civilized construction:

1, the construction team leader of Party B must be resident at the construction site. If he has something to leave, he must negotiate with the on-site person in charge of the project department and appoint someone to be in charge.

2. Party B's on-site construction personnel must wear safety helmets, and if they don't wear safety helmets, they will be fined 100 yuan/person (deducted from Party B's settlement), and the construction personnel shall wear safety belts when working at height (safety belts shall be provided by Party B,

3. It is forbidden to drink or throw objects at high altitude. Once found, deduct Party B's 200 yuan project payment. In case of illegal operation, Party B will take full responsibility for all safety accidents within 30,000 yuan.

4. Party B must obey the management, pay special attention to the civilized construction on site, and ensure that the site materials are cleaned up after work, the ground is cleaned up in time, the waste materials are cleaned up in time and placed in the designated place, the raw materials are not wasted at will, and the materials on the construction site must be handed over to the warehouse. If you don't return the warehouse, the fastener is 5.00 yuan/set, and the steel pipe is punished 15 yuan/meter; The materials on the shelf are turned up layer by layer, but they are not turned up. For the materials placed on the outer shelf, the penalty is 5.00 yuan/set for fasteners and 65,438 yuan +05 yuan/meter for steel pipes (deducted from Party B's project payment). If Party B's safe and civilized construction site fails to meet the standards, it will be fined by the higher authorities, and all losses will be borne by Party B. ..

5. If Party B can't finish the site cleaning work on time, Party A has the right to arrange other personnel to clean up and deduct Party B's double expenses.

6. Party B must conduct technical disclosure and pre-job training for all construction personnel, and conduct safety and civilized construction education for construction personnel every month to ensure safety.

VII. Contract Price:

The main structure, scaffolding construction and demolition shall be settled according to the construction area 14.5 yuan /m2 (except for the settlement below the I-beam on the first floor of Building No.4, 12.5 yuan /m2); Basement and ancillary buildings shall be settled according to the construction area of 7 yuan/m2.

Eight. Payment method: the payment according to the image progress is as follows (60% of the progress payment is made by the construction party.

Nine, this contract is in duplicate, signed by both parties, and will automatically become invalid after the project is completed and the project payment is paid.

Party A (official seal, _ _ _ _ _) and Party B (official seal, _ _ _ _ _ _)

Legal representative (signature, _ _ _ _ _ _)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _