Project budget quota project catalogue

Volume I (Volume I)

Chapter 1 Earthwork 2

Chapter II Scaffolding Project 54

The third chapter masonry engineering 8 1

Chapter IV Concrete and Reinforced Concrete Engineering 1 14

The fifth chapter component transportation 248

Chapter VI Doors and Windows and Wood Structure Engineering 334

Volume I (Volume II)

Chapter VII Floor and Ground Engineering 2

Chapter VIII Roofing and Waterproofing Works 52

Chapter IX Anticorrosion, Thermal Insulation and Thermal Insulation Works 108

Chapter 10 Decoration Project 172

Chapter 11 Vertical Transportation of Construction Projects 344

Chapter 12 Super high-rise buildings increased by 360.

Appendix: Mix Ratio of Concrete and Mortar 364

Second book

Chapter 1 Piling Engineering 2

Chapter II Drilling (Punching) Bored Pile Project 20

Chapter III Manual Digging Pile Project 82

Chapter IV Immersed Cast-in-place Pile Project 104

Chapter V Blasting Pile Engineering 1 14

Chapter VI Soft Soil Foundation Treatment Project 1 18

Chapter VII Dynamic Compaction and Heavy Hammer Compaction Project 136

Chapter 8 Dewatering Project 144

Appendix 148

Volume III (Volume I)

Chapter 1 Installation of Cutting Equipment 2

Chapter II Installation of Forging Equipment

Chapter III Installation of Forging Equipment 102

The fourth chapter lifting equipment installation 124

The fifth chapter crane rail installation 162

Chapter VI Installation of Conveying Equipment 195

Chapter 7 Fan Installation 2 18

Chapter 8 Water Pump Installation 252

Chapter 9 Compressor Installation 335

Chapter 10 Industrial furnace equipment installation 379

Chapter 11 Installation of Gas Generation Equipment 399

Chapter 12 Other Mechanical Installation and Grouting 426

Chapter 13 Auxiliary Equipment Installation 452

Volume III (Middle Volume)

Chapter 14 Installation of Medium Pressure Boiler Equipment 2

Chapter 15 Installation of fuel supply equipment 82

Chapter 16 Installation of Special Equipment for Water Treatment 1 12

Chapter 17 Furnace wall masonry 160

Chapter 18 Installation of Industrial and Civil Boilers 176

Volume III (Volume II)

Chapter 19 Installation of Sintering Equipment 2

Chapter 20 Coking and chemical recovery equipment 24

Chapter 2 1 Installation of refractory equipment 54

Chapter 22 Installation of Ironmaking Equipment 72

Chapter 23 Installation of Steelmaking Equipment 104

Chapter XXIV Installation of Rolling Equipment 120

Chapter 25 Installation of Oxygen Equipment 150

Chapter 26 Installation of Blasting Equipment 164

Chapter 27 Installation of Waste Heat Boiler and Dust Collector 168

Chapter 28 Installation of Lifting Equipment and Belt Conveyor 176

Chapter 29 Installation of Hydraulic Equipment and Hydraulic Piping 184

Chapter 30 Lubrication Equipment and Pipeline Installation 198

Chapter 31 Sporadic equipment installation 208

Appendix 2 16

Book four

The first chapter deformation king kong 2.

Chapter II Distribution Equipment 18

Chapter III Busbars and Insulators 50

The fourth chapter control equipment and low-voltage electrical appliances 84

The fifth chapter battery 132

Chapter VI Motor 146

Chapter VII Sliding Contact Line Device 166

Chapter 8 Cable 180

Chapter 9 Lightning Protection and Grounding Device 238

Chapter 10/KLOC-Overhead Distribution Lines Below 0/0 kV 258

Chapter 11 Electrical Adjustment Test 286

Chapter 12 Pipes and lines 334

Chapter 13 Lighting Electrical Appliances 444

Chapter XIV Installation of Other Electrical Equipment

Book five

first part

Chapter 1 process test instrument 2

Chapter II Process Control Instrumentation 34

Chapter III Centralized Testing Equipment and Instruments

The fourth chapter centralized monitoring device 136

Chapter V Installation and Debugging of Industrial Computer 158

Chapter VI Instrument Pipeline Laying, Heat Tracing and Degreasing 192

Chapter 7 Factory Communication and Power Supply 2 12

Chapter VIII Installation of Instrument Panel, Box, Cabinet and Accessories 256

Chapter 9 Manufacture and Installation of Instrument Accessories 269

The second part of a two-part program/book.

Chapter 10 Automatic fire alarm system 306

Chapter 11 Water Fire Extinguishing System 332

Chapter 12 Gas fire extinguishing system 362

Chapter 13 Foam fire extinguishing system 380

Chapter 14 Fire Control System Debugging 388

Book six

The first chapter yanjin furnace structure production 4

Chapter II Manufacture of Metallurgical Vessel Structure

Chapter III Fabrication of Metallurgical Gas Storage Structure 100

Chapter IV Fabrication of Metallurgical Storage and Transportation Structure 120

Chapter V Fabrication of Metal Structure in Metallurgical Workshop 130

Chapter VI Fabrication of Other Metallurgical Process Structures 168

Chapter VII Structural Installation of Metallurgical Furnace 178

Chapter VIII Structural Installation of Metallurgical Vessel 192

Chapter 9 Installation of Metallurgical Gas Storage Structure 206

Chapter 10 Metallurgical storage and transportation structure installation 246

Chapter 11 Structural Installation of Metallurgical Workshop 252

Chapter XII Installation of Other Metallurgical Process Structures 27 1

Chapter 13 Transport of metal structural components 274

Appendix 285

Book seven

Chapter I Earthwork in the Second Factory Area

Chapter II Railway Works of Factories and Workshops 46

The third chapter factory road engineering 96

Chapter IV Factory Bridge and Culvert Works 160

Chapter 5 Factory and Road Drainage Works 3 16

Appendix 378

Volume VIII

Chapter 1 Derusting Works 2

Chapter II Oil Brush Project 18

Chapter III Anticorrosive Coatings Project 78

Chapter IV Manual Paste Lining FRP Project 152

Chapter V Rubber and Plastic Lining Project 172

Chapter VI pencil lead and Lead Core Project 186

Chapter VII Spraying (Painting) Project 192

Chapter VIII Acid-resistant Brick and Plate Lining Project 202

The ninth chapter insulation engineering 426

Chapter 10 Pipeline Repair Project 572

Appendix 62 1

The ninth book

Chapter 1 professional furnace pit 2

Chapter II General Industrial Furnace 90

Chapter III Amorphous Refractory 120

The fourth chapter auxiliary engineering 162

Appendix 189

The tenth book

Chapter 1 Pipeline Installation 2

Chapter II Pipe Fitting Connection 84

Chapter III Valve Installation 158

The fourth chapter flange installation 202

The fifth chapter plate coil production and pipe fittings production 254

Chapter VI Pressure Testing, Purging and Cleaning of Pipelines 304

Chapter VII Non-destructive Testing and Joint Heat Treatment

Chapter VIII Other 358

Appendix 395

The eleventh book

Chapter 1 Pipeline Installation 2

Chapter II Installation of Valve Water Level Gauge 72

Chapter III Composition and Installation of Low-voltage Instrument and Water Meter 96

The fourth chapter sanitary ware manufacturing and installation 124

The fifth chapter heating appliance installation 140

Chapter VI Manufacture and Installation of Small Containers 152

Chapter VII Manufacture and Installation of Ventilation Pipes 164

Chapter VIII Manufacture and Installation of Regulating Valve 180

Chapter 9 Manufacture and Installation of Tuyere 198

Chapter 10 Manufacture and installation of protective cover 220

Production and Installation of Class 226 Cover in Chapter 1 1

Chapter XII Manufacture and Installation of Mufflers 236

Chapter 13 Manufacture and installation of air conditioning components and equipment brackets 242

Chapter 14 Installation of Ventilation and Air Conditioning Equipment 250

Chapter 15 Installation of FRP ventilation pipes and components 262

Chapter 16 Manufacture and installation of composite pipes 269

Chapter 17 Production and installation of dust removal pipes and fittings 274

Appendix 303

Volume 12

A, earthwork and furnace building machinery 1

II. Piling Machinery 14

Three. Hoisting machine 20

Four, 30 sets of horizontal transportation machinery

Verb (abbreviation of verb) Vertical transport machinery 36

Six, concrete and mortar machinery 4 1

Seven, 50 sets of processing machinery

Eight, pump machinery 62

Nine, welding machinery 68

X. power machinery 74

Xi。 Underground construction machinery 78

Twelve. Other machinery 87

Schedule 99

Schedule 1, Tower Crane Foundation and Track Laying and Demolition Expense Table 100

Schedule 2. Each installation and disassembly cost of special and large machinery 10 1

Schedule 3. Extra-large machinery off-site transportation cost table 102

Schedule 4. Price list of auxiliary machinery for metal structure fabrication and installation 104

Schedule V, Material Budget Price Determination Table 105

Thirteen. Summary table of basic data 107

1. Earthwork and road construction machinery 108

2. Piling machinery 1 14

3. Crane 1 17

4. Horizontal transportation machinery 12 1

5. Vertical transportation machinery 124

6. Concrete and mortar machinery 126

7. Processing machinery 130

8. Pump Machinery 135

9. Welding machinery 138

10. Power machinery 140

1 1. Underground construction machinery 142

12. Other machinery 146

The thirteenth book

0 1, ferrous and nonferrous metals 1

02, wood and products 1 1

03, local materials 15

04. Decorative block material 26

05, cement and cement products 30

06, plastics, rubber and products 35

07, thermal insulation material 44

08, ceiling and scaffolding 57

09, refractory 7 1

10, refractories 103

1 1, paint and chemical raw materials 108

12, hardware, hardware products and welding materials 129

13, pipeline 16 1

14, valves and fittings 172

15, water, heating, coal, heating equipment 232

16, wire and cable 246

17, electrical equipment 3 14

18, industrial automation instrument 326

19, fire fighting equipment 329

20, railway equipment 338

2 1, building sundries 353

22, instrument 364

The fourteenth book

first part

Principle, basis, function and scope of application of cost quota for construction and installation projects in metallurgical plants 1

the second part

Composition of construction and installation engineering cost and measures of machinery cost for metallurgical plant construction 3

the third part

Cost composition and cost quota of metallurgical plant construction, construction and installation engineering 1 1

1, list of construction and installation costs of metallurgical plant 1 1

2, other direct fee quota 12

3. On-site fund quota 13

4. Management fee quota 13

5. Profit rate 14

6. The comprehensive tax rate is 14

7. artificial price Composition Table 15

8, metallurgical factory construction engineering cost calculation program table 16

Appendix:

1. Notice of the Ministry of Construction and the People's Construction Bank of China on Printing and Distributing Several Provisions on Adjusting the Structure of Construction and Installation Projects [1993] No.894 17.

Two. Notice of the Ministry of Finance and the People's Construction Bank of China on Printing and Distributing the Financial System of Construction and Real Estate Development Enterprises [93] No.6 25

specifications

Specification: 32 horizontal paperbacks, *** 18 volumes.