Chapter 1 Earthwork 2
Chapter II Scaffolding Project 54
The third chapter masonry engineering 8 1
Chapter IV Concrete and Reinforced Concrete Engineering 1 14
The fifth chapter component transportation 248
Chapter VI Doors and Windows and Wood Structure Engineering 334
Volume I (Volume II)
Chapter VII Floor and Ground Engineering 2
Chapter VIII Roofing and Waterproofing Works 52
Chapter IX Anticorrosion, Thermal Insulation and Thermal Insulation Works 108
Chapter 10 Decoration Project 172
Chapter 11 Vertical Transportation of Construction Projects 344
Chapter 12 Super high-rise buildings increased by 360.
Appendix: Mix Ratio of Concrete and Mortar 364
Second book
Chapter 1 Piling Engineering 2
Chapter II Drilling (Punching) Bored Pile Project 20
Chapter III Manual Digging Pile Project 82
Chapter IV Immersed Cast-in-place Pile Project 104
Chapter V Blasting Pile Engineering 1 14
Chapter VI Soft Soil Foundation Treatment Project 1 18
Chapter VII Dynamic Compaction and Heavy Hammer Compaction Project 136
Chapter 8 Dewatering Project 144
Appendix 148
Volume III (Volume I)
Chapter 1 Installation of Cutting Equipment 2
Chapter II Installation of Forging Equipment
Chapter III Installation of Forging Equipment 102
The fourth chapter lifting equipment installation 124
The fifth chapter crane rail installation 162
Chapter VI Installation of Conveying Equipment 195
Chapter 7 Fan Installation 2 18
Chapter 8 Water Pump Installation 252
Chapter 9 Compressor Installation 335
Chapter 10 Industrial furnace equipment installation 379
Chapter 11 Installation of Gas Generation Equipment 399
Chapter 12 Other Mechanical Installation and Grouting 426
Chapter 13 Auxiliary Equipment Installation 452
Volume III (Middle Volume)
Chapter 14 Installation of Medium Pressure Boiler Equipment 2
Chapter 15 Installation of fuel supply equipment 82
Chapter 16 Installation of Special Equipment for Water Treatment 1 12
Chapter 17 Furnace wall masonry 160
Chapter 18 Installation of Industrial and Civil Boilers 176
Volume III (Volume II)
Chapter 19 Installation of Sintering Equipment 2
Chapter 20 Coking and chemical recovery equipment 24
Chapter 2 1 Installation of refractory equipment 54
Chapter 22 Installation of Ironmaking Equipment 72
Chapter 23 Installation of Steelmaking Equipment 104
Chapter XXIV Installation of Rolling Equipment 120
Chapter 25 Installation of Oxygen Equipment 150
Chapter 26 Installation of Blasting Equipment 164
Chapter 27 Installation of Waste Heat Boiler and Dust Collector 168
Chapter 28 Installation of Lifting Equipment and Belt Conveyor 176
Chapter 29 Installation of Hydraulic Equipment and Hydraulic Piping 184
Chapter 30 Lubrication Equipment and Pipeline Installation 198
Chapter 31 Sporadic equipment installation 208
Appendix 2 16
Book four
The first chapter deformation king kong 2.
Chapter II Distribution Equipment 18
Chapter III Busbars and Insulators 50
The fourth chapter control equipment and low-voltage electrical appliances 84
The fifth chapter battery 132
Chapter VI Motor 146
Chapter VII Sliding Contact Line Device 166
Chapter 8 Cable 180
Chapter 9 Lightning Protection and Grounding Device 238
Chapter 10/KLOC-Overhead Distribution Lines Below 0/0 kV 258
Chapter 11 Electrical Adjustment Test 286
Chapter 12 Pipes and lines 334
Chapter 13 Lighting Electrical Appliances 444
Chapter XIV Installation of Other Electrical Equipment
Book five
first part
Chapter 1 process test instrument 2
Chapter II Process Control Instrumentation 34
Chapter III Centralized Testing Equipment and Instruments
The fourth chapter centralized monitoring device 136
Chapter V Installation and Debugging of Industrial Computer 158
Chapter VI Instrument Pipeline Laying, Heat Tracing and Degreasing 192
Chapter 7 Factory Communication and Power Supply 2 12
Chapter VIII Installation of Instrument Panel, Box, Cabinet and Accessories 256
Chapter 9 Manufacture and Installation of Instrument Accessories 269
The second part of a two-part program/book.
Chapter 10 Automatic fire alarm system 306
Chapter 11 Water Fire Extinguishing System 332
Chapter 12 Gas fire extinguishing system 362
Chapter 13 Foam fire extinguishing system 380
Chapter 14 Fire Control System Debugging 388
Book six
The first chapter yanjin furnace structure production 4
Chapter II Manufacture of Metallurgical Vessel Structure
Chapter III Fabrication of Metallurgical Gas Storage Structure 100
Chapter IV Fabrication of Metallurgical Storage and Transportation Structure 120
Chapter V Fabrication of Metal Structure in Metallurgical Workshop 130
Chapter VI Fabrication of Other Metallurgical Process Structures 168
Chapter VII Structural Installation of Metallurgical Furnace 178
Chapter VIII Structural Installation of Metallurgical Vessel 192
Chapter 9 Installation of Metallurgical Gas Storage Structure 206
Chapter 10 Metallurgical storage and transportation structure installation 246
Chapter 11 Structural Installation of Metallurgical Workshop 252
Chapter XII Installation of Other Metallurgical Process Structures 27 1
Chapter 13 Transport of metal structural components 274
Appendix 285
Book seven
Chapter I Earthwork in the Second Factory Area
Chapter II Railway Works of Factories and Workshops 46
The third chapter factory road engineering 96
Chapter IV Factory Bridge and Culvert Works 160
Chapter 5 Factory and Road Drainage Works 3 16
Appendix 378
Volume VIII
Chapter 1 Derusting Works 2
Chapter II Oil Brush Project 18
Chapter III Anticorrosive Coatings Project 78
Chapter IV Manual Paste Lining FRP Project 152
Chapter V Rubber and Plastic Lining Project 172
Chapter VI pencil lead and Lead Core Project 186
Chapter VII Spraying (Painting) Project 192
Chapter VIII Acid-resistant Brick and Plate Lining Project 202
The ninth chapter insulation engineering 426
Chapter 10 Pipeline Repair Project 572
Appendix 62 1
The ninth book
Chapter 1 professional furnace pit 2
Chapter II General Industrial Furnace 90
Chapter III Amorphous Refractory 120
The fourth chapter auxiliary engineering 162
Appendix 189
The tenth book
Chapter 1 Pipeline Installation 2
Chapter II Pipe Fitting Connection 84
Chapter III Valve Installation 158
The fourth chapter flange installation 202
The fifth chapter plate coil production and pipe fittings production 254
Chapter VI Pressure Testing, Purging and Cleaning of Pipelines 304
Chapter VII Non-destructive Testing and Joint Heat Treatment
Chapter VIII Other 358
Appendix 395
The eleventh book
Chapter 1 Pipeline Installation 2
Chapter II Installation of Valve Water Level Gauge 72
Chapter III Composition and Installation of Low-voltage Instrument and Water Meter 96
The fourth chapter sanitary ware manufacturing and installation 124
The fifth chapter heating appliance installation 140
Chapter VI Manufacture and Installation of Small Containers 152
Chapter VII Manufacture and Installation of Ventilation Pipes 164
Chapter VIII Manufacture and Installation of Regulating Valve 180
Chapter 9 Manufacture and Installation of Tuyere 198
Chapter 10 Manufacture and installation of protective cover 220
Production and Installation of Class 226 Cover in Chapter 1 1
Chapter XII Manufacture and Installation of Mufflers 236
Chapter 13 Manufacture and installation of air conditioning components and equipment brackets 242
Chapter 14 Installation of Ventilation and Air Conditioning Equipment 250
Chapter 15 Installation of FRP ventilation pipes and components 262
Chapter 16 Manufacture and installation of composite pipes 269
Chapter 17 Production and installation of dust removal pipes and fittings 274
Appendix 303
Volume 12
A, earthwork and furnace building machinery 1
II. Piling Machinery 14
Three. Hoisting machine 20
Four, 30 sets of horizontal transportation machinery
Verb (abbreviation of verb) Vertical transport machinery 36
Six, concrete and mortar machinery 4 1
Seven, 50 sets of processing machinery
Eight, pump machinery 62
Nine, welding machinery 68
X. power machinery 74
Xi。 Underground construction machinery 78
Twelve. Other machinery 87
Schedule 99
Schedule 1, Tower Crane Foundation and Track Laying and Demolition Expense Table 100
Schedule 2. Each installation and disassembly cost of special and large machinery 10 1
Schedule 3. Extra-large machinery off-site transportation cost table 102
Schedule 4. Price list of auxiliary machinery for metal structure fabrication and installation 104
Schedule V, Material Budget Price Determination Table 105
Thirteen. Summary table of basic data 107
1. Earthwork and road construction machinery 108
2. Piling machinery 1 14
3. Crane 1 17
4. Horizontal transportation machinery 12 1
5. Vertical transportation machinery 124
6. Concrete and mortar machinery 126
7. Processing machinery 130
8. Pump Machinery 135
9. Welding machinery 138
10. Power machinery 140
1 1. Underground construction machinery 142
12. Other machinery 146
The thirteenth book
0 1, ferrous and nonferrous metals 1
02, wood and products 1 1
03, local materials 15
04. Decorative block material 26
05, cement and cement products 30
06, plastics, rubber and products 35
07, thermal insulation material 44
08, ceiling and scaffolding 57
09, refractory 7 1
10, refractories 103
1 1, paint and chemical raw materials 108
12, hardware, hardware products and welding materials 129
13, pipeline 16 1
14, valves and fittings 172
15, water, heating, coal, heating equipment 232
16, wire and cable 246
17, electrical equipment 3 14
18, industrial automation instrument 326
19, fire fighting equipment 329
20, railway equipment 338
2 1, building sundries 353
22, instrument 364
The fourteenth book
first part
Principle, basis, function and scope of application of cost quota for construction and installation projects in metallurgical plants 1
the second part
Composition of construction and installation engineering cost and measures of machinery cost for metallurgical plant construction 3
the third part
Cost composition and cost quota of metallurgical plant construction, construction and installation engineering 1 1
1, list of construction and installation costs of metallurgical plant 1 1
2, other direct fee quota 12
3. On-site fund quota 13
4. Management fee quota 13
5. Profit rate 14
6. The comprehensive tax rate is 14
7. artificial price Composition Table 15
8, metallurgical factory construction engineering cost calculation program table 16
Appendix:
1. Notice of the Ministry of Construction and the People's Construction Bank of China on Printing and Distributing Several Provisions on Adjusting the Structure of Construction and Installation Projects [1993] No.894 17.
Two. Notice of the Ministry of Finance and the People's Construction Bank of China on Printing and Distributing the Financial System of Construction and Real Estate Development Enterprises [93] No.6 25
specifications