In the ever-progressing society, more and more things need to use the contract, signing the contract can make our legitimate rights and interests are protected by law. Then the relevant contract in the end how to write it? The following is my compilation of maintenance contract model simple version (selected 5), welcome to learn and reference, I hope to help you.
Maintenance contract simple version 1Party A: ___________________
Legal representative: ______________
Title: ___________________
Residence: ___________________
Party B: ___________________
Legal Representative: ______________
Position: ___________________
Residence: ___________________
A and B in the spirit of fairness, voluntariness, Equality and mutual benefit, the principle of honesty and credit, on the maintenance of equipment to reach the following agreement:
First, the maintenance of equipment details
Before signing the contract, the two sides need to *** with the confirmation of the state of the equipment to be repaired / maintained and its registration. Party B needs to check the intactness of the main parts of the warranty equipment and the completeness of the accessories, and register the machine model, the overall condition and other relevant information to establish a customer file.
Second, the cost of maintenance:
The detailed price list of the maintenance costs incurred is attached (Annex)
Third, the duration of the contract:
_____________ year _____ month _____ to __________ _____ month _______ date
IV, Party A's rights and obligations
1. Party A promptly notifies Party B of the failure of the electromechanical equipment included in this Agreement and truthfully informs Party B of the failure to assist Party B's maintenance personnel to make the correct judgment.
2. When Party A decides to repair the faulty machine, the cost of replacing the parts shall be borne by Party A. The cost of replacing the parts shall be borne by Party B. The quotation provided by Party B is for Party A's reference and confirmation, and the price of the parts in the quotation shall not be higher than the price of the parts provided by the authorized repair center of the manufacturer of the equipment in this city.
3. Party B, such as Party B to provide other technical support (such as equipment installation, use and simple maintenance, basic knowledge training, equipment in the city of long-distance relocation to be assisted and installation and commissioning, etc.), Party B should be supported.
4. After Party A notifies Party B of the equipment maintenance, Party B shall arrive at the location designated by Party A within ________ working days to carry out the maintenance service.
V. Party B's Rights and Obligations
1. During the execution of the contract, Party B shall be responsible for providing repair and maintenance of the machines used under normal conditions.
2. During the contract, Party B guarantees that in the event of machine failure, the service will be available within two days after receiving Party A's maintenance notice (the number of times is not limited), except for national holidays.
3. Party B is obliged to make a statement to Party A on each maintenance situation, and provide a list of replacement parts, the price of parts shall not be higher than the price of the parts provided by the manufacturer of the equipment in the city's authorized maintenance center.
4. During the contract period, Party B for the Party's machine replacement of new parts, the new parts again after the problem, is the quality of the parts themselves, Party B shall be responsible for the repair and replacement.
5. In the maintenance (replacement parts) work is completed, Party B maintenance personnel should provide Party A with a written report, and signed by both parties to confirm that the fault has been repaired.
Sixth, payment and payment methods
Payment: the date of contract signing, monthly reconciliation, quarterly payment. Party B is required to provide Party A with a formal invoice, Party A to pay Party B within ten working days of the repair costs.
Seven, the termination of the contract and breach of contract
1. The expiration of this contract, self-termination, such as Party A need to Party B to continue to serve should be renewed within one month after the expiration of the contract.
2. Default. Party A notifies Party B to repair and maintenance, such as Party B without reason more than three times not scheduled maintenance, Party A has the right to suspend the contract, Party B shall pay to Party A has incurred costs of 20% of the liquidated damages.
VIII. Dispute Resolution
Any dispute arising from the fulfillment of this contract, the two parties to negotiate a solution, the consultation fails to submit to the Hohhot Arbitration Commission arbitration decision.
Nine, this contract from the signing of the parties to the seal of ________ effective
This contract in duplicate, A, B and each party to a, with equal effect.
Party A: ______________ (seal) Party B: ______________ (seal)
Signature of the person in charge: ______________ Signature of the person in charge: ______________
Date: ___________________ Date: ______________
Maintenance Contract Simple Version 2Party A:
Party B:
A and B in the spirit of honesty and trustworthiness, the principle of mutual benefit, the two sides fully negotiated, Party B is responsible for Party A in the xxx after-sales service, and reached the following agreement:
First, the scope of services, the term: strong>
1, the scope of service: agreed by both parties, Party B is responsible for Party A for Huaihua Master Kong factory forklifts for three packages of after-sales service.
2, service period: this agreement is valid for one year, that is, from May 18, 20_ to May 17, 20_. Agreement expires, this contract is automatically terminated.
Second, the quality of service and requirements:
1, Party B to bear the three packages of labor costs, does not include the cost of accessories required during the three packages. If you need to replace the accessories during the three packages, provided by Party A or Party A entrusted Party B to buy.
2. If the vehicle is technically recognized as man-made damage, Party B will not be responsible.
3. Vehicles are identified by Party B, and Party B guarantees the quality of vehicle maintenance.
Third, the cost and settlement:
Party B three packages of service fees for the period of RMB ¥ xxx / unit, a total of ¥ xxx (two thousand yuan round whole), Party A shall be in the contract from the date of entry into force of the three packages of service fees paid in full to the B side. If Party A does not pay Party B's maintenance fee within the stipulated time, Party B will not bear any responsibility for the normal work affected by the forklift.
Four, dispute resolution:
If there is a dispute between the two sides, consult to resolve. If consultation fails, apply for arbitration to Huaihua Arbitration Commission.
V. This agreement shall enter into force on the date of signing, in duplicate, each party shall execute a copy.
Party A:
Address:
Phone:
Legal representative:
Entrusted agent:
Party B:
Address:
Phone:
Legal representative:
Entrusted agent:
Date of signing. :
Maintenance Contract Simple Version 3Party A:
Party B:
A and B in the spirit of mutual benefit and reciprocity of the principle of the maintenance of computers in Party A's unit of the service, after full consultation, decided to enter into this agreement
A, the contents of the cooperation
A voluntarily will be the unit of the computer Handed over to the party B maintenance, specific configuration see configuration list. Party B provides door-to-door service. The contract period is ____ years. Party A *** have computer _____ to Party B maintenance, *** need to maintain the cost of ¥ ______ (RMB) / year; in the contract period, Party A if the new computer, maintenance costs are negotiated. The amount of money since the signing of the contract, Party A every (quarterly) to pay the negotiated service payments to Party B. By (every) quarter to pay _____ yuan "package year".
The contract total Party A need to pay Party B the first service fee of ¥ _______ (RMB), capitalized ¥ __________________ (RMB).
Second, door-to-door service projects
Description of services:
1. Computer overhaul of all kinds of failures can not start, can not enter the system, slowdowns, often crashed, e-mail setups, etc., the operation of the system to re-install
2. All kinds of peripheral maintenance Modem, printers, scanners p>
3. p>
3. System software installation WIN98, WIN2K, WINxP, etc.
4. Tools installation and maintenance of Office2000, Acdsee, Kingsoft wordmaster and other commonly used software on the market
5. Increase and replace the computer boards and components of the CPU, motherboards, memory, graphics cards, sound cards, power supply
6. Computer upgrades Upgrade program to the customer, with the minimum cost to do the performance
7. Various types of hardware drivers to install various types of graphics cards, sound cards, Modem
8. Check and kill computer viruses various types of computer viruses (partition viruses, file viruses, mail viruses) to check and kill
9. Data backup CD-ROM or hard disk backup (required backup media provided by the customer)
< p> 10. Various types of network maintenance and installation of network equipment installation, setup, testing, network server maintenance (large-scale network changes, the cost of another)
Third, the scope of hardware maintenance: all types of computer hardware maintenance and fault detection.
1. The service fee does not include computer parts (such as monitors, CD-ROM drives, floppy drives, and boards, etc.) repair costs, Party B can be entrusted to send the repair, the parts are repaired, Party B will be sent back to the Party and installed, the cost of repairs in accordance with the actual repair costs charged, not another service charge.
2. Party A needs to increase or replace the computer parts, Party A can entrust Party B to purchase on behalf of Party B, without charging a service fee, the warranty period provided by the manufacturer.
3. Party A needs to buy all the computer accessories and computer supplies, Party B in the same conditions have the right of first refusal.
4. Party A damaged computer parts are still in the manufacturer's warranty period, Party B free to send to the manufacturer's warranty or replacement, but Party A must provide the manufacturer's detailed address, contact information and computer parts of the warranty book, Party B does not guarantee the success and the time required. Manufacturers do not add service fees in urban areas, outside of urban areas need to add the corresponding service fee when.
5. Party A damaged computer parts are not in the manufacturer's warranty period, Party B can be repaired for Party A, the repair cost is charged according to the actual repair costs, not another service charge. If the repair time is more than five working days (excluding the waiting time for quotation), Party B can provide replacement parts (except peripherals and monitor) for Party A to use free of charge until the parts are repaired. However, if the damaged computer parts are not repaired by Party A or not repaired by Party B, this is not the case.
6. All brand-name computers (such as Lenovo, Seven, Founder, etc.) and peripherals (printers, scanners, etc.), if not out of warranty, Party B only provides software and testing services (not open the chassis), if the results of the test is hardware damage can only be by the appropriate agent on behalf of the maintenance, if the agent requires repair, Party B will provide the whole machine repair service, the agent does not charge a fee for the service within the urban area, outside the urban area need to add the appropriate service charge. The company's products and services are available in a wide range of colors and sizes, and are available in a variety of colors.
Four, software maintenance scope: computer all kinds of system software, tools and application software installation and maintenance.
Party B in the maintenance of Party A's computer, for its installation of any software, copyright by Party A is responsible for, Party B does not provide any software copyright.
Party A need to install genuine software can be entrusted to Party B on behalf of the purchase. If Party A needs to check and kill computer virus services, you must install a genuine antivirus software. In order to ensure the normal function of Party A users and the protection of data under the premise of Party B engineers have the right to decide to solve the problem of the program.
V. Service Response Time
Party A, please make an appointment when you report a problem, from the time of reporting a problem within 1.5 hours of arranging for engineers to visit the door, if Party A is more than 6 km away from the city, the response time of 5 hours, the specific time by Party A and Party B agreed. Party B will make a phone call to confirm before going to the door. Party B's working hours are from 8:30 to 19:30. If Party A requests for expedited service or evening service, Party A will have to pay the cab fee.
In the following cases, Party A can give the host computer to the door-to-door engineer to move back to Party B for maintenance, and make an appointment to send it back within 48 hours:
1. Party A doesn't want the door-to-door engineer to operate on site.
2. Failure conditions can not be resolved on site.
3. Failure to solve the situation requires a long time and we can not accompany.
Sixth, Party B strictly abide by all national laws and regulations on privacy, absolute confidentiality of any information about the Party.
Non-fault. In the maintenance process due to hardware aging and other reasons for the formation of the damage Party B is not responsible for; if because of Party B's reasons caused by the damage to the hardware, Party A and Party B negotiated the amount of compensation to the depreciation of the hardware price of the negotiation basis. However, Party B is not responsible for indirect losses caused by maintenance, including Party A's important data, information loss. Party A should back up the data and information by itself. Party B can do the backup for Party A on behalf of Party A, but will not be responsible for the integrity of the backup of Party A's information and data. The Company shall have limited liability for the services provided and shall not be liable for any indirect loss arising from the services provided.
VII. Party B is only responsible for the computers agreed upon in the agreement if the computers in Party A's unit are not all maintained by Party B.
After the signing of the agreement, Party B has the right to record the characteristics of the computer (such as number, etc.) and marking on the computer to identify the computer, after confirming the model and number of Party A's computer, Party A's computer manager to sign to confirm.
Eight, Party B's work requires Party A's cooperation
Party B's engineers in Party A's computer maintenance, Party A should be as far as possible with the work, such as the provision of computer drivers (in the case of), Party B's engineers need to check the site of the online information, in the case of not involving the Party's network security and other special considerations, Party A should cooperate with the work. Party A shall cooperate under the premise that it does not involve Party A's network security and other special considerations. In the case of major changes (e.g., reinstallation of the operating system), Party B's engineers will ask Party A if there is any important data that needs to be backed up, and Party A should take the initiative to do so.
IX. Termination of the contract
From _____ ____ ____ to _____ ____ _____, the contract expires on its own. If Party A renews the contract,
then another contract will be signed. Party B's engineers and Party A have a violent conflict, after both sides of the consultation is difficult to mediate, Party A can ask to cancel the peace contract, but Party A must pay the number of times that have been served by the required fees.
X. This agreement is not exhaustive, by the two sides to solve the problem, the specific content of this agreement, but also please download the contract to view.
This agreement is in duplicate, each party to sign a copy. This agreement is effective from the date of signature and seal.
Party A:
Responsible person:
Unit seal:
Party B:
Responsible person:
Unit seal:
Date:
Maintenance Contract Simple 4Party A:
Party B:
Party A entrusts the boiler piping repair project of the People's Government of Hexi Township to Party B for construction. Entrusted to the construction of Party B, in order to clarify the responsibilities of both parties, quality and on schedule to complete the project task, by the A and B parties consulting, special signing of this agreement, *** with the implementation.
First, the content of the project
Hexi Township People's Government boiler pipe repair project. Specific content includes: the offices and buildings of the Township Government . Piping repair and replacement and the repair of the furnace wall involved.
Second, the contracting method
Party B uses the contracting method of contracting labor and materials and budget lump sum. Budget lump sum price of 50000 yuan (capital: 50,000 yuan). Pipeline pumps are purchased by Party A itself and are not included. Changes in the course of the project, visas and other matters to the real final account.
Third, the duration of the requirements
The project started on October 15, 20xx, to November 10, 20xx completion.
Fourth, the supply of materials
The materials required for the project are all supplied by Party B. However, the boiler pipes used must be produced by regular manufacturers, and the use of unqualified materials is strictly prohibited.
V. Payment
After the completion of the project, the construction unit and the relevant departments of the organization acceptance, water acceptance of the project will be a one-time payment to the B side.
Sixth, the responsibilities of both parties
1, Party A before the start of construction should provide Party B with a complete construction drawings, and select the construction site representative responsible for the construction site of the visa, sealing and day-to-day affairs, to assist Party B to deal with the construction of the relevant issues.
2, Party B in the construction should be strictly in accordance with the requirements of the technical specifications of the construction of careful construction to ensure construction quality and construction safety. If quality and safety accidents occur during the construction process, the responsibility shall be borne by Party B.
3, Party B shall comply with the provisions of the village environmental health, civilized construction.
VII, completion and acceptance
When the project has the conditions for acceptance, Party A will organize the construction unit and the relevant departments for acceptance, acceptance can only be used after passing.
VIII. The old pipe removed from the project belongs to Party B.
The old pipe was removed from the project.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ date _________ year ____ month ____ day
Maintenance Contract Simple Version 5Party A: ____________ (hereinafter referred to as Party A)
Party B: ____________ (hereinafter referred to as Party B)
On the issue of repairing the cracks in the house of the family room of ____________, the following agreement was reached:
During the warranty period, due to the Party A's improper construction caused the house to appear multiple quality problems. Although repaired, but the repair effect is not obvious, and there is a tendency to expand the area. Party B's life has caused extremely bad impact. Now Party A is responsible for the maintenance of Party B's house ____________ room.
1. Maintenance time: ____________ year ____________ month ____________ day to ______ year ______ month ______ day. Party A guarantees to deliver the work on time.
2. Repair location: ____________ households.
3. Supervision of the quality of repair: all the walls in the bedroom of the house are repaired, and during the repair period, Party A must regularly send someone to supervise the quality at the site.
4. housing decoration recovery: because the cracks in the house is in the delivery of the house and party B gradually began to appear after moving in, so party A must be responsible for the cracks in the repair after party B interior decoration must be in accordance with the original restoration work. If the second repair causes color difference or other decoration damage, Party B reserves the right to pursue Party A due to the cracks to Party B caused damage.
5. Custody of existing indoor goods and compensation for damage: Before the repair, Party A and Party B for Party B's home furnishings and furniture (such as window covers, lamps, furniture, air conditioning, etc.) to conduct a careful inventory and sign to confirm. For the maintenance period due to Party A's construction reasons caused by the destruction or loss of any of Party B's items, Party A must be in accordance with the original price for full compensation.
6, after the maintenance of the quality of housing acceptance and audit: need to be signed by Party B to confirm.
7, the modification of the warranty period of the house: the warranty period of the house was originally calculated in accordance with the date of confirmation of the handover of the house, and now requires Party A to recalculate the date after the completion of the repairs, the written commitment from Party A, and stamped confirmation.
8. In the maintenance period of the water and electricity costs incurred by Party A is responsible for supervising the construction to be borne, while the maintenance will produce dust, formaldehyde and other pollution caused by uninhabitable, so the costs incurred need to be responsible for Party A.
9.
9, so this time after the repair did not achieve the expected repair effect, and cracks and other quality problems, then Party A must bear the responsibility of repair compensation again, can not be more than the warranty period of the house and refused to repair. During the maintenance period, Party B will be compensated for the related expenses (such as lost labor, mental damage, etc.) according to the calculation standard of RMB 600.0 per day and provide accommodation.
10. As the repair responsibility is entirely caused by Party A, and caused great inconvenience to Party B's life and work, it is required that Party A give full cleaning to Party B's housing after the repair is completed, and the cleaning should reach Party B's expected results.
11. This agreement in duplicate, A, B and each party to sign a copy. This agreement will come into effect after the signatures of both parties.
Party A (signature): ______
Party B (signature): ______
Signing date: ______ year ____________ month ____________ day