Engineering Department year-end work summary

Engineering Department year-end summary of the work of the model (General 5)

Time flies, accompanied by a relatively compact and slightly tense work rhythm, the work of the year is so close to the end, looking back on this extraordinary year, there are laughs, there are tears, there is growth, there are shortcomings, not as good as to summarize the work of the past to do an analysis and draw lessons. Many people are very headache how to write a wonderful year-end summary, the following is my carefully organized year-end summary of the Ministry of Engineering sample (General 5), for reference only, we take a look at it.

First, engineering construction:

20xx year is tense and busy, leaping into the port of the new large, medium and small engineering construction projects more than a dozen, including the south gate project, embankment support project, 7 # berth wharf and wharf rear yard project, the hardening of the spare coal yard and the port area some production and living support facilities. Harbor area some production, life support facilities construction and other projects. Now the project construction has been completed and put into use, a strong protection of the port production, business, life of the smooth progress.

In the bidding process of the project adhere to the principle of low bid, strict control of the budget cost to maximize the savings of the company's investment. Some of these projects we have repeatedly invited to the relevant experts to repeat the arguments repeatedly compared, such as embankment support project in the pre-construction phase of the project we have done a lot of work, the development of the preliminary program: there are experts in inland water engineering program, with a wealth of experts in seaport engineering construction, there are also a number of water conservancy engineering experts, of course, the program is different, the views of inconsistent, and ultimately, we have selected a program more than a number of expert The program saves more than 1 million yuan, and now the project has been completed by most of the experts recognized and praised. Similarly, all other engineering bidding projects always adhere to the company's interests in the first place, only to achieve fairness, integrity and self-discipline in order to do their jobs, in order to provide the leadership of the correct basis for decision-making.

Second, team building:

Engineering is a young team, the average age of only 28 years old, everyone is full of vitality, full of energy, but because of the work of the less experienced, inevitably appear on the spot to deal with the problem of insufficient capacity, the dynamic management of the site is not in place and other issues. In this regard, I work on the strict requirements for their own at the same time, the learning time to time to urge the use of their own experience and skills to "pass, help, bring"; and dare to give them the burden, encourage them to let go of the work at the same time, advocate the company's management motto of the incentive concept to stimulate the passion of employees to do the work of the work focusing on the fine, and everything to seek Fine. Together with Mr. Zang's attention to human resources and advanced employment concepts, they will mature in their work as soon as possible, **** with the creation of a vibrant, strong young team.

Third, on-site management, communication and coordination:

Engineering management is a systematic project, on-site construction is a large regiment, only good engineering department's own construction is far from enough. The Ministry of Engineering to give full play to the top and bottom at the same time, must actively coordinate the work of the company's internal and external departments and units. Especially in the face of some local interference, not only to focus on maintaining the stability of the company's overall situation, but also to firmly safeguard the interests of the company's principle can not be shaken.

Site managers of the construction unit, in safety, quality, quantity accounting and other principles of strict control, never ambiguous, on-site active communication, dynamic management, the use of our professional skills, work experience and flexible solutions. In order to establish our prestige, to ensure that the project is carried out smoothly and efficiently, and ultimately achieve the maximization of the company's interests, the company's image standardization.

In the upcoming 20xx, I and all employees of the Ministry of Engineering will be more enthusiastic to meet the challenge! Under the correct guidance of the company's leadership and full confidence in the effective performance of their duties, take induction, comparison, judgment and analysis, accumulation and summarization of work experience, so that their business level to a higher level, and at the same time with the various sister departments to do a good job of coordination and cooperation. Let us all closely unite around the core of the company's leadership, riding the waves, breaking through the difficulties and obstacles, waiting for us will certainly be a better tomorrow!

Engineering Department year-end work summary 2

First, nervous work report please:

1, stacked areas of everyone's hallway lighting switch to voice-activated and touch time-delayed switch;

the first quarter of this year, nervous about stacked everyone's hallway lighting approach switch to switch to retrofit, the total entrance door into the doorway and hallway corners replaced with Acoustic delay switch, the owners of the doorway into the touch delay switch, in the owners will not have to forget to turn off the lights at home, prompting the phenomenon of lamp bulb head burned out, but also to reach the results of energy saving.

2, a single weak point to find and restore incarceration

Because of the single villa illegal alterations led to the weakness of the system paralyzed sweep, 43 households line sweep broken, 24 households main line broken, alarm power bad 1, decoder bad 4, the system refuses to be bad 6, the grasp of the box is bad 4, the company's leadership and the middle manager of the office and the developer of the harmonization of consensus, access to the developer! In favor of processing, in the construction team to enter the construction site, we overcome the small number of personnel, from time to time to supervise, two people each other turn to see, in addition to the owners of the usual repair, other times are followed by the construction team, certainly in the time to follow also found a lot of topics, jerry-building, can save on the handling of the matter, burying the line pipe is not deep enough and other topics, in our strong requirements, prompting the construction team according to standard construction, the construction of a single building weaknesses have basically been restored. Nowadays, the single weak point has simply regained the norm.

3, the usual patch work;

This year, my engineering department received a patch single 1262, the end of the 1245, patch repair rate of more than 90 percent. Before and after the end of the stacked area of 38 elevator pit cement block and waste material management work, the 70th door of the total sewage pipeline under the couch replacement patchwork, stacked 69th, 70th, 72nd, 82nd, 94th, 95th, 101st a total of 7 households do not have a water main valve, because the developer construction team dill landscaping buried, after agreeing to the Ministry of Engineering more than two weeks of hard work to find the 5 households to find a main valve The location of the location, digging out, from the beginning of the height of the well and do the well cover, another 95 and 101 because not found, and finally harmonize with the water company to turn off the main valve, stop the water for two hours, from the beginning of the placement of the valve, and to the superposition of the area of the number of well covers coated with green paint, prompting it and the greenery to form a whole. Another two groups of landscape bridge guard rope 'replacement, rainy season on the community sweeping housing leakage check, leakage of timely and developers construction team associated with timely patch, this work has been rich owners must. In the thunderstorms during the timely community ditch pipeline waste dredging work and flood control work, in the third quarter of this year, focusing on the community eaves dripping, tiger window seepage, the existence of a variety of legacy issues are summarized, sent to the developers to harmonize processing, now because the eaves dripping developers construction team clearly stated that can not be repaired, the topic is really in harmony, looking for automatic and feasible methods. Another rainy season this year to the temporary three groups placed a 380V pump, because of the previous exotic 380V power supply available, we overcome the small number of personnel, time under the circumstances of the tight, open pavement slots, trenching buried pipe, threading, consolidation, and finally rushed to the arrival of torrential rains to the temporary placement of a good, to ensure that this year's flood control work successfully and smoothly at the end of the year, 11. 5 the day after the fire day on the second day of the neighborhood sweep of fire protection. Approach to inspection, inspection found that the topic is still more, a little is usually a little sloppy did not notice, such as elevator pit oil cup oil overflow, foreign timely care, if there is any cigarette fall pit, which is also the seedling of the fire chaos, we promptly construct elevator maintenance personnel to give care and urge the future found full of time to do a good job in a timely manner to take care of the work, and other superimposed on the building fire extinguishers 20 pressure Has not been enough, and other offices in the middle of the need to increase a box of extinguishers, the topic has been reported to the manager of the Yu please teach. Also especially to several peripheral units to emphasize good fire protection, the electrical configuration under the jurisdiction of a good insulation test, wire screws fastening work, this month, the tension of several clusters of river submersible pumps insulation test work and sweeping on the water pipe, a variety of valves, pumps, do a good job of anti-freezing work.

4, the usual configuration of the protection and maintenance environment

Now the configuration of the community to maintain the environment as a whole is still relatively in place, the configuration of the sweeping configuration according to the configuration of the maintenance of the book for maintenance, are now in good working condition.

Second, the work of this year's legacy of the title

1, the community Luo Fen Road, Lake Malaren Road fence 20xx more than 1,000 square feet of painting and maintenance of the title, because of the fence is relatively high, we patch up the staff, including me, there are only two, a week of workdays in addition to the rest days, there are only three touches along the way the opportunity to have a serious deal with the owners! Usually repair, so in terms of staffing equipment is very difficult to end, so the work also made a report to the manager of the Yu please teach is not to invite outside personnel to end, waiting for a response.

2, the community one bridge two bridge carving railings, the configuration of the large gate, 63 gate configuration, children's playground, painting maintenance, painting report has been played, are waiting for paint.

3, cell monitoring camera bad 5, respectively, west gate west to north, 69 west to east, 38 north to west, 18 north to south, sluice gate, perimeter alarm bad two pairs, respectively, 37 defense zone and 7 defense zone. The report has hit corporate procurement.

Third, today there are topics

1) the degree of professional skills is still relatively lacking, a special are able to reach the degree of

2) the workflow, exemplary manipulation of the joint is not strong enough to do not do enough to the peripheral units to monitor and check the work of the meticulous

3) the conservation of single writing is not very exemplary, handwriting

4) the stack material placement is not exemplary, things are placed more chaotic, exotic sticker obvious label

5) individual work progress are delayed than the planning lag, the effect of the patch work and patch the quality of the work to be improved

6) and the work of all parts of the tail is not complete

Fourth, two 0xx years of the Meilan Golden Dee

In view of the above mentioned topics and weak key, 20xx year on our Meilan gold residence patch work preliminary conception tension around "planning, perfect, model, implementation". According to the community practice work necessary to carry out a fair distribution of personnel, the work of the implementation of the person, the responsibility to the person.

2) perfect: according to the company's "elegant service standards" goal, the work of the engineering department of the Meilan Golden Residence further refinement of the elegant service to the usual work of the sweeping stages and the key to constitute a complete set of works from the repair and maintenance of a single look at the owners of the service of the degree of willingness

3) exemplary: Joint standard requirements, the work of the above topics and other aspects of the work of the key to further exemplary, all standards as a model, all the owners as the goal, (including the handling of peripheral units, all industry standards as a model) to achieve the key to the work of each planning, systems, performance, inspection, reform, and constitute relevant records

4) implementation; planning work Must be implemented in place, the responsibility to the person, progress in our patch personnel sense of responsibility, supervision of the peripheral units must do on time and not on time in conjunction with the discovery of the topic, timely processing, to promote the implementation of various regulations and systems to the real

The above is my 20xx year work summary, there are not enough places to please lead and colleagues blame the axe correction!

The engineering department year-end work summary 3

The end of the year, and immediately greeted a new year. In this year-end season, I am professional to do a detailed summary of the work done in the past year.

At the beginning of this year, the building's fire protection system as a whole did a detailed inspection and maintenance. Fire fans, fire pumps, fire broadcasting, gas extinguishing and the overall automatic fire alarm system for a comprehensive and detailed inspection. Each system unit is tested one by one for control, alarm, information feedback and so on. During this test, some of the fans, smoke sensors, pumps and fire dampers were found to be faulty. Subsequently, the problems were immediately summarized and maintenance was arranged. In this repair, some of the faults are historical problems that have not been solved for many years.

The professional staff, actively access to information, immediately on the root cause of its failure to repair, some of the failure of the professional staff really can not repair, in the confirmation of the failure, immediately contact the manufacturer, the manufacturer is required to send someone to repair or replacement. In this inspection, testing and maintenance of the fire protection system, the largest workload is still the maintenance of the fire damper in the building. Fire valves are generally installed in the air ducts at the entrance and exit, there are a large number of valves in the boredom of the roof, whenever the repair of a valve, the maintenance staff always have to carry a high ladder, either in the construction of the high ladder or to personally drill into the boredom of the construction. Seemingly simple work is actually very difficult to repair, and even sometimes the entire fire valve to be broken down as a whole, after repair and then installed back in place. At this time, but also on this fault valve system alarm test, confirm that the fault has been eliminated after the analysis of this repair and summarize, and do a good job of maintenance records. After the statistics, in this maintenance China **** the property party of the building more than twenty fire valves for overhaul.

As the building's popularity increases, some famous large-scale enterprises have begun to move into the building, such as Japan's Cabrio, China Aerospace, Hitachi and so on. The professional staff in order to generate income for their own companies, and actively undertake the company's comprehensive wiring work, which is also for the building's overall wiring level and the future of the rapid inspection and maintenance of the pavement. In the wiring construction of these companies, my professional staff took the initiative to work overtime to ensure the completion of the work schedule on time to make great .

In the construction of these companies, my professional staff took the initiative to work overtime to ensure the completion of the work on time to make great efforts.

In the construction process, some of the wire trough in the ceiling, wiring personnel must be drilled into the top of the boredom, along the bridge will be wrist-thick cable from the floor room through the lead to the user's equipment room, halfway across the user may rent the area, the construction of the visible difficulty is very large, but also in the case of the professional staff to ensure the quality of the construction in the construction of the integrated cabling construction, because of customer Special, in the wiring requirements are very strict, as well as through four long-distance fiber optic lead to the user room. The actual construction, the first problem is to do a good job of protecting the fiber, the meter-long fiber into the sheath line, this work is very hard to do. After the efforts of all the professional staff finally clever and complete the pipeline through the good, finally on time to submit the project and ushered in the customer's recognition.

In the daily maintenance, the professional staff in order to facilitate rapid troubleshooting of various equipment, first of all, the fire system in the building to carry out a detailed inventory, and print all the modules address similar, one by one, check and affix a good label. This job is actually very time-consuming, first of all, from the fire host to confirm the actual installation of the module address, and then bring a good ladder to the scene. Often the fire module is installed on the top of the room, the professional staff have to climb up to the top of the boredom, looking for the module in the top, after finding and confirming with the mainframe similar to the same labeling before leaving. After nearly a month of hard work finally on the building more than eight hundred tiny points to check one by one posted a good logo.

At the same time with these jobs, the security system and the inexplicable failure. Always in the absence of regularity in the case of multiple circuits offline. This kind of failure appeared, resulting in the failure of the security monitoring system, the patrol system can not work properly. The professional staff immediately carried out repair on the overall security system. After many efforts and the assistance of the manufacturer, the failure was finally confirmed and the system equipment was replaced. In this difficult failure to confirm the work of the professional spent more than a month of time, finally the security system back to normal.

Because the building has been built since this year has been more than two years, the building's fire probe according to the fire system specification should be carried out a cleaning. Before cleaning, there is a small part of the smoke sensor false fire alarm can not be immediately reset to eliminate, so the fire system has a certain impact. So the professional immediately outsourcing vendors, smoke sensors in the building, temperature sensors for cleaning. The workload of cleaning smoke sensors is huge. Because there are nearly two thousand smoke sensors in the building, temperature sensors, each replacement up to climb a ladder or push a lift truck. The professional staff to overcome the difficulties of the workload of fewer people, after more than a month of disdainful efforts will finally be in the building of public **** area and a small part of the rental area within the smoke and temperature sensors removed and sent to the completion of the cleaning and one by one to affix a good sign to make a good record. After statistics *** cleaning smoke more than a hundred. And then, in the automatic fire alarm system, and closely to its observation, one by one for its smoke test. In the following two to three months, will be cleaned after the return of the smoke, temperature sensors in the small faults immediately carried out maintenance to ensure that the fire system without a fault.

Looking back at these past events as yesterday in front of us. My professional staff after more than a year of hard work, the whole company or the whole building to pay is visible to everyone. But at present, despite the previous labor is hard and difficult, but the new problems are always emerging, new failures are always arising. I professionals still have to supervise in their positions to go on, for our company for our customers to create a safer, more comfortable, more ideal office environment, in the property circle high up in our first Pacific Rongke banner.

Engineering Department year-end work summary 4

First, the political and ideological

Strengthen the theoretical study, improve the political and ideological awareness of the workers. The entire staff to seriously study and implement the spirit of the superior and the hospital a variety of documents and actively implement in place, in the busy daily work, without formality, combined with the actual situation of the department to carry out learning and discussion, to encourage the department staff to actively participate in promoting the implementation of the hospital's various reform measures and implementation. Through the systematic learning and education, improve the ideological and political awareness of the department staff, consciously resist the unhealthy trend of the industry, to improve the service as its own responsibility, to the quality first, the patient first concept wholeheartedly for the clinical front-line services, do a good job.

Second, business management

Improve the workflow, improve efficiency and convenience for patients. Treasury and maintenance group is the Department of Medical Engineering directly facing the clinical departments of the important window, to establish a good image of the hospital is the top priority, how to facilitate clinical, how to improve efficiency, is the focus of the work. Ensure that inpatients and emergency patients 24-hour supply of medical supplies and maintenance equipment response. By improving the workflow, the rational development of the work system, mobile staffing, etc., fully mobilize the enthusiasm of all personnel, work together, overcome difficulties, improve work efficiency, effectively improve the maintenance time, improve the quality of service and other phenomena, for the clinical departments to provide a solid guarantee.

Third, medical equipment procurement

1, strict implementation of the medical equipment online bidding sunshine procurement, to ensure timely supply of clinical use. To achieve procurement transparency, quality transparency, clinical use of transparent, timely understanding of the clinical departments of equipment and consumables demand dynamics and grasp the use of information feedback, to ensure that the clinical use of rationality, safety, patient satisfaction supply.

2, strengthen the quality management of medical devices, set up a medical device quality control committee and adverse reaction monitoring group, quality control team members from time to time each month on the section of the safe use of medical devices and adverse reactions to spot checks, and urge the department staff to seriously implement the various management systems to strengthen the quality management of medical devices, the quality management in the purchase and acceptance of storage and maintenance of the links, quarterly Carry out inventory of medical consumables quality, validity period, etc., convene the discovery of problems timely and properly dealt with to ensure the safety of clinical use. Strict implementation of the State Drug Administration "Interim Provisions on Quality Management of Drugs and Medical Consumables Used in Medical Institutions", the hospital has formulated the "Disposable Medical Supplies Management System and Medical Waste Management", "Medical Consumables Delivery System of Medical Engineering Department of Eagle Mountain Hospital of Wannan Medical College", "Safety Control and Risk Management System for Clinical Use of Medical Equipments", and "Management Standards for Medical Equipments of Eagle Mountain Hospital of Wannan Medical College" and a series of management measures and corresponding measures. A series of management measures, such as "Specification", have been implemented one after another to prevent major medical accidents and economic losses of the hospital due to unstandardized use. Extensively carry out clinical medical device adverse reaction monitoring, found that the problem is timely reported to avoid the recurrence of adverse reactions.

In short, the Department of Medical Engineering in the work of 20xx years, although many achievements and progress, but there are still shortcomings. In the new year's work, we should strive to improve, gradually improve, improve their own cultivation, technical level and political quality, improve the quality of service, wholeheartedly for the clinical service, and strive to obtain higher achievements and greater progress.

Engineering Department year-end work summary 5

First, the main work performance and achievements

1, strictly abide by the company's rules and regulations. At the beginning of work, I carefully studied the "project quality management rules", and will keep it in mind, always remind themselves to strictly abide by the company's rules and regulations, to maintain the company's image.

2, for a fresh graduate, although in the school also had more than a month in the construction site internship experience, but in the real construction process, what I know is still only the tip of the iceberg. Therefore, from the beginning of working in the company, the two seniors in the engineering department took me to various sites. The period of time when I followed them to check the quality, safety and civilized construction was the best time for me to absorb knowledge and sum up experience, and it was also the stage when I learned the most and the most comprehensive about the construction site. So I faithfully thank them for their teaching, teaching and care.

3, other aspects:

① Insist on going to work early every day to the company, clean the office, create a clean working environment for colleagues.

② Management office part of the document storage, in order to need to be able to find in time.

③Register some of the matters in the memo, for later comparison.

④ actively discuss with colleagues in the branch cost control, contract management, data management and other content. Through the discussion not only enhance the friendship between colleagues, but also improve their own ability.

⑤ Take the initiative to communicate with colleagues and help others with enthusiasm.

Second, the direction of efforts

1, taking into account the limited scope of work of lesbians in the construction unit, so it is more necessary to recharge their own batteries, focusing on the direction of the bidding to work hard to accumulate experience in bidding, and strive to meet the work requirements, the successful passage of the National Price Engineer Licensing Examination, to take full advantage of the advantages of passing the National Price Engineer Licensing Examination. Take full advantage of the national cost engineer qualification examination and previous work experience, proactive contact with a variety of related businesses, improve their practical ability, if possible, to be able to dedicate to the company in the bidding negotiation, for the company's brand building to make their due contribution.

2, actively participate in the certificate examination, study professional technology, improve business capacity and professional standards;

3, play the role of the party's exemplary leadership, and strive to be advanced.

I have made a little achievement, but there is still a gap from the requirements of the leadership. Identify the shortcomings in the work in order to overcome in the future work, but also need to read more books, seriously study the norms and regulations and relevant documents and materials, master the professional knowledge, improve their ability to work, strengthen the sense of responsibility for the work, and do a good job in a timely manner in the work of individuals. In the future work, I will continue to summarize and introspection, and constantly spur themselves and enrich the energy, improve their own quality and business level, in order to adapt to the times and the development of the enterprise, and the company *** with the progress, *** with the growth.

;