Medical hospital flooring features:
Features: dust, mildew, waterproof, seamless, oil-resistant, strong resistance to chemicals, wear-resistant, pressure-resistant, impact resistance, toughness, durability, sound damping
Thickness: 1.0mm 2.0mm 3.0mm
Life: 8-15 years
Construction process:
Waterproofing: the ground needs to be waterproofed
Plain ground treatment: according to the actual condition of the ground, sanding, repairing, dust removal, etc.
Construction process:
Waterproofing: the ground need to do waterproofing
Plain ground treatment: according to the actual condition of the ground, sanding, repairing, dust removal, etc.
The ground is not enough for the medical hospitals.
Epoxy primer: the use of penetration and adhesion of epoxy primer roll coating to enhance the adhesion of the surface
Mortar in the coating: epoxy resin and quartz sand according to the proportion of the mix, with a trowel according to the actual situation of one or more coated.
Epoxy batch soil: according to the actual needs of the construction of a number of courses, in order to achieve flat and no holes, no batch of knife marks and sanding marks
Self-flowing plane paint: trowel will be self-flowing plane paint trowel coated with a trowel, so that the surface as a whole bright and clean, color uniformity, no hollow drums
Precautions: 24 hours before the people, 72 hours before the heavy pressure.
(25 ℃ shall prevail, low temperature, need to extend the time moderately)
You can go online to look at the Huainan Chuangdiping, professional construction, package