I. Project Overview
1. Project Name: County Bus Station
The design results include general layout plan, individual plan, elevation, section, main building day view, night view perspective effect, population lobby perspective effect, general description of the architectural planning and design, functional layout plan and description, traffic organization analysis plan and description, landscape analysis plan and description, planning site Various technical indicators, investment estimates.
2. Construction unit: _____________________
3. Geographic location of the project: ____________________
2. Natural conditions
1. Extreme maximum temperature
2. Extreme minimum temperature
3. Annual mean temperature p>
4, annual precipitation
5, the maximum annual wind
6, the maximum annual wind speed
7, fog
Three, the design requirements
1, based on the Municipal Development and Reform Commission of the development and reform of the investment No. "on the county bus station east of the feasibility study report on the approval of the".
2, in line with the Ministry of Transportation, "bus station level and construction requirements" and the Ministry of Construction, Ministry of Transportation, "bus station construction design specifications.
3. It basically conforms to the County Planning Office's Planning and Design Conditions for the Construction Site of County East Bus Station.
4, the design program economic and practical, beautiful principle. Reflect the people-oriented and convenient for travelers, the main economic and technical indicators should be expressed clearly, such as: land acquisition area, the actual use of the station area, parking lot area, the main station building area (waiting room, ticket hall and the area of the sub-floor) and the construction of auxiliary facilities area, etc..
Four, the bidding requirements explained
1, the bidding unit must have an independent legal personality and architectural design B (including B) or higher qualifications.
After signing this agreement between Party A and Party B, Party B will carry out the design according to Party A's decoration intention and modification opinions until Party A recognizes it. Party A recognizes Party B's design scheme after signing the construction contract of architectural decoration project, Party B will not return the design deposit.
2, the way to invite the design unit to participate in the program design, voluntarily accept the invitation of the design unit must pay a deposit of _____, and according to the specified time to the site survey.
3, the program design bidding won the unit for preliminary design and construction drawing design unit.
4, one of the following circumstances, the design program is invalid:
(1) do not respond to the design tender;
(2) did not go to the site at the specified time to set foot on the site;
(3) late delivery of the design program;
(4) design program does not meet the requirements of the "Provincial Design Tender Documentation Depth Provisions for Construction Projects in ____ ;
(5)The program design generally shall not exceed the indicators specified in the feasibility study report ____%, such as special circumstances can be explained, the parking lot area to increase the unrestricted.
5, the design unit to submit seven copies of the program design documents, one of which is the original, including the relevant qualification certificate, business license (copy) for checking. The original document should be stamped with the official seal of the design unit, and by the statutory or its authorized person and the appropriate qualifications of registered practitioners, specific preparation of the person in charge of signing and sealing, individually sealed and sealed with the word "original document", the rest of the document for the copy for the evaluation of the use of bidding, the copy of the document and other information shall not have any obvious or implicitly design the unit's text and mark.
6, the tender submission location: ____________________________
7, site visit time: ___ years ___ months ___ lunch time, the deadline for the delivery of design plans: ___ years ___ months ___ lunch time
Design units should be the above copy documents and sealed original documents in the specified time to the designated location. specified time to the designated place.
V. Conform to the development of the times and enthusiastically engage in public welfare. Although this point has little to do with my mistake of being late for class, I really feel this way and ask my teacher's permission to speak about it. I feel that this error fully exposed the shortcomings of my pride and luxury, the root cause of this shortcoming is the family affluence, and I do not have an ideological concept to adapt to the development of the times, that affluence can be engaged in privileges, which is in fact greatly wrong. Because in this country, this society has a lot of rich people enthusiastically engaged in public welfare. I therefore feel that I must set up a good visionary concept, the ideological end of the right to ensure that I do not make this kind of mistake in the future.
Six, the design unit commitment
Design unit in the provisions of the design program at the same time, the need to submit the relevant commitment to the construction unit.
1, the design progress, depth, design quality, quality service commitment:
Bidding method: the bidding using audible reserve price bidding, not up to the reserve price will not be sold. (From China bidding network) this bidding only the starting price, bidding starting price is: 450,000 yuan / year, the highest offer whether to reach the reserve price by the county bidding management center and the county notary public impartial personnel on-site supervision.
2, the time required for preliminary design, construction drawings design time required:
3, the design cost of the offer for the work permit approval of all construction projects, and includes the program design, the total cost of the preliminary design and construction drawings design must be calculated according to national standards, and according to its design fee offer to propose preferential rates, calculate the actual offer, and explain the relevant additional conditions.
VII. Bid Evaluation Methods
According to the "Rules for Bid Evaluation of Design Bidding for East County Bus Station".
VIII. Documents and information to be provided by both parties
After all the equipments arrive at the site, the supplier shall send someone to the site for unpacking and inspection according to the time arranged by the demand side. If the supplier can not arrive at the site on time and there is no notification by letter and telegram, the demand side shall have the right to unpack and inspect the equipments and make records on the lack of parts, quality damage and make a record, which shall be recognized by the supplier and be responsible for the treatment.
l, inviting the unit to provide the design of basic information
(1) the provincial Department of Transportation approved the engineering feasibility study report:
(2) county planning office to provide the planning and design conditions:
(3) the design of the program bidding.
2. The following documents are required to be provided by the participating program design unit:
(1) Provide a full set of design plan drawings approved by the Public Works Committee in accordance with the depth required by the design specifications, including the general layout, traffic network planning, environmental layout, and the main station house effect diagram.
(2) Program design specifications and economic and technical analysis information, design drawings and descriptions of projects approved by the Public Works Permit.
3, program design drawings and instructions album specifications for a3, ***7 sets (including a set of original documents) the main station house color spray drawing format for al, ***1 sets, another increase in the general layout plan, the main station house, a floor plan of a map of each one, the map format for al.
4, the design cost of the bid must be a two-envelope method, an envelope for the end of the signature is packaged in a copy of the document, another envelope signed and stamped and packaged in a copy of the document. An envelope signed and sealed package in the original document.
9, the main conditions and requirements for the signing of the planning and design contract
1, the program was selected by the evaluation, the construction unit and the applicant signed a design contract, the design costs in accordance with the current national standards to give preferential.
2, the applicant's design program is no longer charged separately, the unsuccessful unit's participation in the program to pay the cost of work _____ yuan, and return the deposit, the unsuccessful unit's intellectual property rights of the design program to the construction unit. Experts assessed as invalid design program units do not pay the cost of work, and do not return the deposit.
Ten, the construction unit contact person and telephone number
Contact: _______ Tel: ________