A sewage treatment certificate must be applied to the local drainage management department.
The sewage (wastewater) treatment worker professional qualification certificate is a first-class qualification certificate, which is divided into elementary, intermediate and advanced. Wastewater treatment workers have been eliminated and renamed industrial wastewater treatment workers. Knowledge of environmental protection laws for sewage treatment plants and relevant systems for the operation and management of treatment facilities, sewage treatment processes, discharge outlets and various discharge indicators, sewage sources and water quality changes, drainage water quality standards, various sewage treatment technologies, basic knowledge of the main equipment of the system and Technical parameters, commonly used instruments for sewage treatment and basic electrical knowledge, knowledge about cleaner production and building a circular economy, etc.
The application process for sewage treatment equipment discharge license
1. Overview of the application process:
1. Written application (explaining the drainage location and water quality conditions);< /p>
2. Approval documents from the planning department; (planning permit and master plan)
3. Drainage layout plan of the factory or community, vertical or cross-sectional views of rainwater and sewage pipelines . A diagram of the connection between the drainage outlet and the municipal pipe network, indicating the names of adjacent roads and surrounding environment. An inspection well ready for sampling and installation of flow meters is set up between the outside of the factory wall and the municipal inspection well. Indicate the pipe (canal) diameter (size) and pipe bottom elevation;
4. Sewage treatment process flow chart and floor plan;
5. Product types and main raw materials (Limited to industrial projects);
6. Environmental assessment or environmental assessment approval;
7. Applicant’s ID card and legal person’s power of attorney;
8. Trial production license or water quality acceptance report issued by the Environmental Protection Bureau;
9. "Urban Drainage License Application Form".
2. Specific steps
1. The pollutant discharge unit logs into the "National Pollutant Discharge Permit Information Disclosure System" and can download the "Pollution Discharge License Application Information Disclosure Explanation Form" in the application guide column. ” and “Enterprise Law-abiding Commitment Letter” template documents, scan and upload them to the system after filling them out offline.
Login URL:/permitExt/defaults/default-index!getInformation.action.
2. Click the "Online Declaration" button in the navigation bar to enter the "National Pollutant Discharge Permit Application Subsystem" business processing platform page.
3. After registration, you can apply online for related businesses. Please note that branches/factories of the same legal person in different regions need to apply for separate pollutant discharge permits. When registering, the "unit name" is the name of the company's head office/headquarters, and the "registered unit name" is the enterprise applying for the license this time. The name of the branch company/branch factory. If there is no branch company/branch factory, you can only fill in the name of the head office/main factory.
4. To apply for a pollutant discharge license in this system for the first time, please click on the "License Application" module to fill it out.
5. The online license application business includes 5 items: application for new emission license, application for change of emission license, application for renewal of emission license, application for reissue of emission license and information disclosure. The application procedures for the first four businesses are the same, and information disclosure is used by pollutant discharge units to publish pre-application information disclosure content.
Legal basis:
"Urban Drainage Permit Management Measures"
Article 7 If a drainage household needs to discharge sewage into the urban drainage pipe network and its ancillary facilities, You should apply for an urban drainage license to the local drainage management department with relevant materials. The drainage management department shall make a decision within 20 days from the date of acceptance of the application. Drainage households that have discharged sewage into the urban drainage pipe network and its ancillary facilities before the implementation of these Measures shall apply for an urban drainage license in accordance with the provisions of the preceding paragraph. Those who meet the licensing conditions will be issued an urban drainage license; those who do not meet the licensing conditions will be ordered by the drainage management department to make corrections within a time limit. Once the conditions are met, an urban drainage license will be issued.