Flood prevention and flood control safety notification selected 5 articles

Flood control refers to the prevention and mitigation of floods, in order to prevent and mitigate floods, flood forecasting, flood control scheduling, flood control projects, such as the use of the relevant work. Its policy is safety first, prevention first, prevention is more important than robbery, preparedness. The following is a selection of 5 flood prevention and flood control safety notices that I have shared with you, for reference only, I hope it will help you. Flood prevention and flood control safety notice 1

The sub-branches, project managers, the company's various departments and offices:

The recent persistent widespread rainfall weather triggered a number of floods, mudslides and other natural disasters, a serious threat to the construction site of the project On July 4, a landslide caused by heavy rainfall resulted in the death of one person in the construction of the third bidding section of the Xiluodu Hydropower Station Leibo Reservoir Road Reconstruction Project. In order to put an end to such safety accidents, to protect the safety of people and property, now on the strengthening of the construction site flood prevention and flood control safety work notice is as follows:

First, strengthen the leadership, strengthen the awareness of prevention.

The sub-branches, project managers responsible for construction (project manager), the chief engineer and the security department must attach great importance to flood prevention, flood control and safety. To firmly establish the idea of preparedness, timely study and solve the project, the region's flood prevention and flood control work problems, targeted to improve the flood prevention and flood control system, the establishment of an inspection mechanism for the tunnel mouth, high roadbed slopes, high and deep road graben, half-filled and half-dug embankments, deep foundation pits, bridges near the water area equipment, materials, warehouses, construction sites and other key departments, key parts of the key inspections, the drainage is not smooth, Hidden dangers such as changes in the mountain, protrusions, loose rocks, etc. should be arranged immediately to detect and remove hidden dangers in time. To carry out flood control and flood emergency rescue drills and publicity and education work, strengthen the staff's awareness of production safety, to ensure that the flood control and flood prevention measures are put into practice, and do a good job of flood control, flood control and safety.

Second, sound institutions, the implementation of flood control responsibilities.

The company set up ? Road and Tunnel Group Engineering Co., Ltd. flood control, flood safety leading group? By the executive deputy general manager Jiang Wanguang is the leader of the administrative department manager ZengMinYing, business development department manager LiXiaoBin, financial assets department manager ZhuLing, engineering department ChenXiHan for group members, set up an office in the project management (engineering) department. Chen Xihan is responsible for the daily work.

All subsidiaries and branches, project managers must establish a leading group for flood prevention and control work, with the main project leader as the team leader, chief engineer, production leader as deputy leader, heads of departments and team leaders as members. The main responsibilities are: to understand the weather forecast, take effective measures to deal with floods and geological disasters; to develop a flood control and flood management system and emergency rescue plan, to organize and implement rescue and relief in the event of a disaster, and to promptly report to the head office and local government.

Third, eliminate hidden dangers and establish an emergency mechanism:

All construction departments should strictly follow the requirements of the Construction Law, the Safety Inspection Standards for Construction and other laws and regulations, as well as standards and norms, and reasonably arrange the construction progress and processes according to the weather and climate changes to ensure the safety of construction. Supervision and inspection of major, major and general sources of danger within the jurisdiction, especially explosive depots, oil depots, high-altitude operations, high slopes, deep foundation pits and other major sources of danger to strengthen monitoring and observation, strict implementation of the special program and operating procedures, if necessary, to send a person on duty, the establishment of a comprehensive record of observation of sources of danger, to prevent injuries from explosions, fires, falling from heights, burial, object strikes and other injuries. Conduct hidden danger investigation on temporary power lines, mixing stations, prefabrication yards, steel processing yards, lifting operations and other large sources of danger to prevent lightning, electrocution and other injuries, and find hidden dangers should be supervised and thoroughly rectified, leaving no dead ends. Operators and mechanical equipment, transportation equipment and other general sources of risk to strengthen management, improve personnel and equipment management system, is strictly prohibited to go down to the river to bathe, laundry, play and engage in other operations to prevent drowning, property damage and other injuries.

Fourth, the establishment of emergency rescue mechanism to deal with emergencies:

The leading group of flood control work of each subsidiary branch, project manager should establish flood control emergency rescue mechanism, develop and improve the flood control emergency rescue plan. To regularly carry out the plan ` seminars, revisions, drills and professional training for rescue personnel; the implementation of rescue teams and materials, such as sacks, shovels, life jackets, lifebuoys, safety ropes, safety belts, etc.; should be guaranteed at all times to ensure the smooth flow of information to improve the ability to combat, once the danger of the shortest possible time to quickly go to the scene, the scientific organization of the rescue to prevent the effective rescue in a timely manner, infallible.

V. Coordination and communication to ensure safe production:

Before the flood season, the subsidiaries, project managers should strengthen the coordination and communication with the government, the owner, the supervision department, obedience to the management, unified command; keep in touch with the local firefighting, public security, medical, meteorological and other departments and the implementation of a person responsible for contact and communication to ensure that The rescue and relief work is accurate, timely and smooth, strengthen the site safety management, and eliminate the occurrence of nuisance disasters. /p>

According to the China Meteorological Administration forecast analysis, this year's flood season (May-September) China's climate conditions in general bias, the middle and lower reaches of the Yangtze River precipitation over the same period of the normal year, strong winds, thunderstorms, storms, and other extreme weather and climate events, there may be a heavier flood conditions. In order to effectively do a good job of 20__ annual fisheries flood control and disaster prevention work in our province, to ensure safe production of fisheries, minimize disaster losses, is now the relevant matters are notified as follows.

First, attach great importance to the strict implementation of the fisheries flood control and disaster relief work responsibility

First, a deep understanding of the importance of flood control and disaster relief work, resolutely overcome paralysis and fluke, according to the Party Central Committee, the State Council's decision-making and deployment and the Ministry of the relevant requirements, and actively seek the support of the local party committees and governments, and do a good job in the fisheries flood control, disaster relief and safety production Work. Second, effectively strengthen the organizational leadership, enhance the sense of responsibility, the main leader to personally promote the work carried out, deployed in advance arrangements, strict responsibility for the implementation of the pressure transferred from layer to layer, the responsibility for flood control and disaster relief to the post to the person. Third, pay close attention to the implementation of the fisheries water safety responsibility system, and further implementation of the main responsibility of the fishing boat owner, the captain direct responsibility, crew responsibility, to achieve full coverage of the responsibility of the fisheries safety production.

Second, a comprehensive survey, and actively implement flood prevention and disaster relief measures

First, according to? The first is to prevent the main, the combination of prevention, resistance and rescue? The principle of summarizing the lessons learned from the past, improve the flood control and disaster response plan and the system. The second is to organize and carry out pre-flood production facilities hidden trouble inspection, focusing on the inspection of the ridge, dam, drainage channels and other facilities, found that the problem in time to repair and reinforcement, and improve the construction standard, to prevent flooding of the pond collapse dam; to promote the fisheries preparation for the construction of seedling farms. Third, in conjunction with the closed season management, combating illegal and illegal enforcement activities, organize and carry out production safety inspections, focusing on checking the preparation of disaster prevention and resilience materials, fishing vessels equipped with emergency rescue equipment, maintenance of fishery safety equipment and facilities, fisheries vessels ready to sail. Fourthly, it has strengthened the improvement, maintenance and construction of fishing harbors (fishery wharves) to ensure the safety of mooring of fishing vessels (fishery administration vessels). Organize and carry out a variety of forms of publicity, education and training and fisheries water safety emergency drills to improve the fishermen's awareness of disaster prevention and self-help ability.

Third, strengthen the emergency watch, ready to respond to fishery emergencies

First, the strict implementation of the 24-hour fishery emergency watch system, supervise enterprises, boat owners and breeding personnel to do a good job of emergency watch. The second is to strengthen coordination with meteorological, maritime, water conservancy and other departments to do a good job of monitoring and early warning of catastrophic weather, *** with the emergency rescue, aftermath and other work. Third, the fisheries vessels around the readiness of the preparatory work, in the event of a dangerous situation, immediately start the emergency response and organization of rescue. Fourth, do a good job of disaster statistics, and in accordance with the relevant requirements, timely and accurate report to the provincial office.

Contact: ______ (fax)

Email: ______

______ Office

May 5, 20__

Flood Prevention and Flood Control Security Notice 3

Departments and units:

In order to do a good job of flood control and rescue work in 20__, according to the "Tianjin Foreign Studies University Flood Control and Rescue Work Plan" and the "Municipal Education Commission on the forwarding of the notice of the <Municipal Defense Office on the Further Improvement of the Work of Flood Control and Hidden Danger Investigation&. gt; notice" (Jin Education Commission after letter [20__] 21) requirements, please departments and units to seriously implement the deployment of the plan, make good preparations for flood control and rescue work, and May 22 before the report of the unit 220 ___ Flood Control Leadership Group and Flood Control Liaison Network list (electronic version sent to the Logistics Management Office e-mail: hqch@tjfsu.edu.cn,纸质版盖章送至) Logistics Management Office of the integrated office, functional offices only report the "flood control liaison network personnel list", do not report the list of leading group of flood control and rescue work).

Contact phone: ______

Tianjin Foreign Studies University Flood Control and Emergency Response Work Office

20__ May 15

List of Flood Control Material Types

(1) Gravel material: including stone, sand and Stone

Stone has block stone, material stone, in the flood control and rescue and plugging the mouth of the embankment in a large amount, such as throwing stones to prevent washout, solid foot, filling ponds, pressure pillows, sinking rows, and masonry slope protection and so on, more than the use of stone.

Sand, sand, river sand, sea sand, mainly used for flood control to do anti-filtration layer and pressure seepage drainage.

Stone in the rescue with sand to do anti-filtration and seepage materials.

(2) wood and bamboo: often used in flood control and rescue in the signing of piles to protect the slopes, piling blocking, tie rows of anti-wave and so on.

(3) woven materials: including straw bags, sacks, reed mats, bags, woven fabrics and so on. Straw bags, sacks, woven bags, etc. in the flood control and rescue blocking, buffer, cushioning and other uses. Reed mats, woven cloth, etc. in the flood control and rescue commonly used to prevent rushing, slope protection, scaffolding, padding, etc..

(4) material: refers to the mountain wood, elm, willow and other tree branches, some of the post firewood, reeds, and straw firewood, etc. also collectively referred to as material, in the flood control and rescue used to make willow bundles, Pu pillow, sink rows and so on.

(5) tying materials: wire, brown hemp rope, nylon rope, etc., in the flood control and rescue used to tie blocks and bundles of cable materials.

(6) oil: gasoline, diesel fuel and lubricants, wire rope grease. Gasoline, diesel for emergency vehicles, machinery (gasoline engines, diesel engines, etc.) fuel, lubricants, wire rope grease for emergency vehicles, machinery maintenance.

(7) lighting equipment: portable flood control lamps, floodlights, flood control gas oil generator sets, flood control diesel generator sets, etc., for flood rescue lighting (I recommend?). Stone's? Brand lighting).

(8) blasting materials: explosives, detonation equipment, ignition equipment, etc., mainly used for flood season breakthrough flood water, or clear flood barriers to blasting operations.

(9) flood control and life-saving equipment: mainly life jackets, lifebuoys, rubber boats, submarine boats, lifeboats, etc., mainly used for the emergency transfer of people in flooded areas.

The work of the flood season

1, mastering the water and weather conditions: timely release of the temperature, wind, precipitation, snow and ice, water level, tide level, flow and other meteorological and hydrological conditions related to flooding, forecasting the possible flood peaks, water increase, flooding, and other water conditions, and if necessary, issue an alert.

2, scheduling floods: based on water conditions and engineering conditions, and flood control scheduling program, the use of the various flood control projects that have been built, flood control scheduling. In the need to use flood diversion, flood storage, flood retention measures, timely and decisive decisions, orders, on time, according to the amount of flood diversion, flood storage.

3, project guarding: the organization of flood control personnel, uninterrupted inspection and defense of dikes, dams, culverts and other projects, timely detection of danger, analysis of the causes, the correct judgment, the development of rescue and protection of the program, the organization of rescue and protection. Below the alert level, generally defended by professionals, beyond the alert level, the organization of flood control personnel defense.

Flood Prevention and Flood Control Safety Notice 4

All units of the university:

The torrential rains that fell on Wuhan last night and this morning have not been relieved so far. The school appeared in a number of waterlogged situation, the school's main gate and the undergraduate school around the serious waterlogging, vehicles can not pass; Arts and Sciences Department of the East Hill to the Huanshan Road 100 meters at a small area of landslides, traffic control has been implemented not to pass; the second attached to the small to the Chagang community waterlogged serious, vehicles can not pass. At the same time, a number of power distribution room there is the threat of water, to ensure safety, power outages may occur at any time. In order to do a good job in extreme weather conditions, to ensure the safety of life and property of teachers and students, the relevant matters are notified as follows:

1. All units should attach great importance to, adhere to the responsibility of the land, and effectively assume the responsibility of the unit's duties within the scope of the work of the rescue and relief work. The main responsible comrades should immediately go into the front line, a comprehensive understanding of the situation, forward command, and actively organize the unit cadres and workers to carry out rescue and relief work.

2. The units should be free of information, major dangers, the disaster situation reported to the school rescue and relief headquarters in a timely manner (headquarters is located in the Department of Logistics and Security, contact number: 68771388), in order to facilitate the school co-ordination and mobilization of all forces to deal with the situation in a timely manner. Every day before 16:00 pm, each unit will be the rescue and relief situation through e-mail reported to the rescue and relief headquarters.

3. Each unit should adjust the teaching and research work arrangements in accordance with the rain, disaster conditions, and strengthen the safety of teachers and students warning work; student work departments should organize counselors to do a good job of safety education and reminder of the work of the counselor in-depth students, to grasp the outside of the internships, social practice and other activities of the students of the safety of education and management, and effectively prevent accidents to ensure that teachers and students of personal safety and safety of teaching and research activities. The company's website is a great source of information about the company's activities.

4. All units should do a good job of investigating potential safety hazards in their areas of responsibility, especially in the area of responsibility for the collapse of buildings and walls prone to do a good job of investigating, and set up warning signs in a timely manner to remind teachers and students. Laboratory and equipment management departments and units should take timely and effective measures to strengthen the laboratory and equipment `safety management; logistics, defense departments should be the possibility of landslides, tree dumping and other secondary disaster locations in a timely manner early warning, and do a good job disposing of the appropriate.

5. The units should further improve the emergency disposal plan, if you find the need to coordinate and solve the security risks, please report to the school in a timely manner, contact number: 68771388, campus 110, answering phone: 68777110.

Wuhan University

July 6, 20XX

Flood Prevention and Flood Control Safety Notice 5

Dear Residents and Friends:

According to the latest news released by Ningxia Meteorological Station, the latest meteorological data analyzed that from this evening to late evening there is expected to be exceptionally The latest meteorological data analysis, today evening to evening Ningxia territory is expected to have extraordinarily heavy rainfall. It is expected that the night of the 23rd to the evening of the 24th, Yinchuan Shizuishan two cities, Wuzhong City, the northern part of the city and the mountains along the Helan Mountains have heavy rain to heavy rain, the cumulative rainfall of 50 to 80 millimeters, individual townships and villages up to 80 millimeters or more, and other areas of the medium rain (10-25 millimeters), in which the southwestern part of the city of Guyuan has heavy rain (25-38 millimeters), which may lead to flash floods, urban flooding and geologic hazards, on the transportation, tourism, urban and rural Infrastructure and mass production and life and other impacts, please strengthen precautions.

Please be vigilant and pay attention to the following safety matters to prevent accidents before they happen:

First, please do not charge outdoors and in the garage today and tomorrow, to avoid triggering accidents with electricity.

Second, vehicles try not to park in the underground garage to avoid damage.

Third, do not wade in the water, do not restart the vehicle after the water stalled.

Fourth, people pay attention to safety, take care of the elderly and children at home.

V. Ensure that property is not lost, and take precautionary measures.

vi. Residents living in bungalows and those with underground garages should take waterproofing measures in front of the door, and it would be better to bring their own sandbags to prevent rainwater from pouring into the house.

Reminder: In the event of a dangerous situation, please do not panic residents and friends, do the relevant first aid and self-help measures. At the same time, cooperate with the community and property companies to do emergency work.