How many people are there at home in Barcelona?

Camp Nou

abstract

Camp Nou Stadium has also been translated into Campano Stadium in China. When it was first opened, it could only accommodate 93,053 spectators (originally planned to accommodate150,000 people, but later cancelled), and the stadium area was 107x72 meters (now the Nou Camp is 105x68, which meets the requirements of UEFA). The main materials are concrete and steel. Completed on 1957.

History and opening up

When kubala came to Barcelona, it seemed that the stadium of the old church could no longer accommodate fanatical fans, so the establishment of a new stadium was naturally put on the agenda. 1957 From the proposal to the official use of Camp Nou on September 24th, Camp Nou went through hardships, but its dream finally came true. Now we will tell you how this great stadium was built.

background

As early as 1948, there was a proposal to build a new stadium for Barcelona. When Hungarian superstar kubala joined Barcelona in June 1950, the cathedral stadium built by 1922 was too small. At that time, the maximum audience capacity was only 60,000 people, so the voice of building a new stadium was getting louder and louder. 1950 September 19. Under the auspices of Mr. Gabbert, members of the board of directors of Barcelona bought a piece of land near Matt Neuntoter, which is also close to the cathedral stadium.

On February 9th, 195 1, the new stadium committee decided to change the address of the new stadium. Their negotiations with Barcelona executives failed to reach an agreement, and the plan subsequently aborted. 1953165438+1October 14 Francisco? 6? 1 Milo? 6? 1 sans was elected president of Barcelona, and he is also a staunch supporter of building a new stadium. 1954 On March 28th, in front of 60,000 Barcelona fans, Mirosans laid the foundation stone for the new Camp Nou stadium accompanied by the municipal president Gronert, and was blessed by Cardinal Modreggie of Barcelona.

opening ceremony

The opening ceremony of the new stadium is scheduled for September 24th. 1957. The organizing committee decided to hold a special celebration ceremony, which was planned by Bowser Reyes and Mr. Casos. On September 2 1 day, in the Barcelona conference room, De Causiaux, a member of the Royal Spanish Society, announced the formal process of celebrating the completion ceremony of the new stadium.

On the opening day, it happened to be Messer Day, and all Barcelona citizens put on the clothes of the club color. The opening ceremony began with Mass and was presided over by Barcelona Cardinal modric. Many senior political and sports officials sat on the rostrum with Barcelona President Milo Sans.

At this time, the Nou Camp stand has not yet been completed, but it can accommodate more than 90,000 spectators. All the sports clubs in Catalonia took part in the parade. Then the theme song of the ceremony was played. At 4: 30 pm, Barcelona Football Club played the opening match with Poland from Warsaw. Barcelona's starting lineup: Ramallets, Oliveira, Bruegge, segala, wilkie, Gensana, Basola, Villaverde, Martinez, kubala and tejada. In the end, Barcelona beat their opponents 4-2, and Martinez scored the first goal in the history of the new Nou Camp for Barcelona. At halftime, 1500 Barcelona Dance Art Troupe performed Sadana, a traditional Catalan dance, and released 1000 pigeons on the spot, thus opening a new era in Barcelona's history.

work progress

Floodlight facilities, the first game in Camp Nou using floodlight was 1959- 1960, the second round of the European Champions Cup between Barcelona and CSKA Sofia.

Set up an electronic scoreboard at the parallel height of the stands on the second floor. The season ends 1975- 1976.

Personal box, built in the stand on the second floor, completed in the season of 198 1- 1982.

The VIP lounge, built in the first-floor stands, was completed in the season of 198 1- 1982.

Press conference hall, behind the stands on the first floor, completion time 198 1- 1982 season.

The matrix shows scoreboards in both the north and south goal directions. Completion time 198 1- 1982 season.

Expand the stadium. In order to meet the requirements of Spain 1982 World Cup, the stadium capacity was increased by 22 150 people, reaching 1 15000 people.

The Club Museum was completed, behind the stands on the second floor. Completion date1September 24th, 984.

Museum Art Foundation was established, completed in 1985- 1986 season.

The former Barcelona Players Association has set up a new office, behind the stands 1 floor, and the completion time is 1990- 199 1 season.

Reconstruction of the first-floor stands was carried out in the summer of 1994, which reduced the lawn elevation of the stadium by 2.5 meters and increased the stadium capacity. Seats were also set behind the goal, and the previous stadium safety ditch was also removed.

Wembley and Basel VIP Lounge, 1 behind the bleachers, 1994- 1995 season completion time. During the match day, these two 250-square-meter lounges will be used by Barcelona members.

The new reporter-only seat, three-story stand, was completed in the season of 1994- 1995.

The waterproof roof of the stadium is updated, above the stands on the third floor, and the completion time is 1994- 1995 season.

Barcelona Information Center, in the Club Museum, behind the stands on the second floor,1994 65438+1October 20th.

The stone paving around the stadium was completed in the season of 1995- 1996.

Multi-function hall, 1 behind the bleachers, 1995- 1996 season completed.

The expansion of the president's room, two-story stands, 1995- 1996 season completed.

Each gate is equipped with elevators, one with 8 elevators, and the completion time is 1995- 1996.

Underground parking lot. Under the stands. Completion time 1996- 1997 season. This project has added 400 parking spaces in the underground two-story parking lot, plus the previous 400, so a * * * has 800 parking spaces.

Barcelona Club Medical Center, behind the second-floor stand of the south goal, completed the 1996- 1997 season.

Electronic facilities general control center, three-story stand, completed in 1996- 1997.

Rebuilding the stand porch and expanding the museum, completion time 1997- 1998 season. Thanks to these innovations, the museum has doubled its area and has a member-only channel. The porch is also engraved with the names of all the players in the team's history.

The new electronic scoreboard of the stadium was completed in the season of 1997- 1998. In this season, the old scoreboard was demolished and replaced with a new electronic scoreboard with new equipment.

Technical maintenance department, behind the second-floor stand, completion time 1997- 1998 season.

All seats are replaced by seats, and the season is finished 1998- 1999. After this project, Camp Nou can now accommodate 98,787 spectators.

Brand new microphone system. Three-story stand. Completion time 1998- 1999 season

New floodlighting system. The third floor stands. Completion time 1998- 1999 season

Existing facilities

Now the stadium is 48 meters high, with a total area of 55,000 square meters, 250 meters long and 220 meters wide. The fans will leave in five minutes. 1998- 1999 season, UEFA recognized the incomparable brilliance of Camp Nou and gave it a five-star evaluation. At present, the main ancillary facilities in Camp Nou are as follows:

Locker Room

Worship room

All kinds of boxes

reserved lounge for honoured guests

Press?Conference?Hall?

Television relay studio

Press gallery

Technical service office

Sports medicine center

General control center

Former Barcelona Players' Association Office

Barcelona Football Club "President nunes" Museum (Barcelona Museum named after nunes)