Business Negotiation Meeting Minutes Template
In daily life and work, more and more people will go to the use of meeting minutes, meeting minutes are different from the minutes of the meeting, the minutes of the meeting is only an objective documentary material. Meeting minutes in the end how to formulate the appropriate? Here is my collection of business negotiation meeting minutes template, welcome to read, I hope you can enjoy.
Business Negotiation Minutes 1
Meeting subject: Xiaochang Junshui Avenue business hall expansion housing lease
Meeting time: 20xx x month x day
Meeting place: Xiaochang Unicom 5th floor small conference room
Moderator: Lu Jie (B) Recorder: Fu Peng (B)
Negotiating the two sides of the personnel
Lessor (Party A):
Rwanda, Li Ming
Lessee (Party B):
Negotiation meeting content:
A statement of the views of Party A: Party A will be the town of Xiaochang County, Jingshui, Jingshui Avenue, No. 225, four door stalls (210 square meters) rented to Party B; four door stalls annual rent of 280,000 yuan, and then 10% annual incremental rent. Lease period of 5 years, and requires the United States to assume part of the original tenant decoration losses and relocation costs.
Second, party B statement: because of the surrounding single door stall (40-50 square feet) rent is generally 50,000 yuan (excluding taxes) up and down, our company believes that we should refer to this market, asking the rent down to a single door stall annual rent of 60,000 yuan and the party to provide tax stamps, the annual rental increase of 6% is appropriate; due to the original tenant to withdraw from the loss of decoration and relocation costs caused by the company did not accept to bear the practice of the Unicom.
Third, A and B **** the same opinion:
After many rounds of frank consultation between A and B, reached the following agreement:
1. housing rent by year, 20xx.6.1 to 20xx.12.31 rent of two hundred thousand yuan (small capitals 200,000 yuan), 20xx.1.1 to 20xx.12.31 rent of two hundred thousand yuan (small capitals 200,000 yuan), 20xx.1.1 to 20xx.12.31 rent of two hundred and fifty thousand nine hundred and ninety thousand yuan (small capitals 200,000 yuan). (lower case 259,200 yuan), the rent in the next three years according to the previous year's . The 8% increment of the base is as follows:
2. Any other disputes arising from the withdrawal of the original tenant shall be dealt with by Party A on its own, and Party B shall not be responsible for them;
3. Party A is required to hand over the room on time, which shall not affect the decoration of Party B. If Party A fails to hand over the room on time, it shall not affect the decoration of the room. If Party A can't hand over the room in time, Party B should be compensated according to twice the daily rent.
Fourth, the negotiation minutes as an annex to the contract, and the contract has the same legal effect. After analyzing the technical indexes and parameters of anchor drill pipe and water-probing drill bit in the previous period and combining with the actual situation of our company, it was determined that Dexing Material Supply Station in Xiushui West Street of Yu County won the bidding of our company's anchor drill pipe and water-probing drill bit, and this meeting was for the negotiation on the quantity and price of the company's purchasing.
2, our company decided to purchase anchor drill rods, water drilling bits (quantity see procurement plan), Yu County Xiu Shui West Street Dexing supplies station quoted 10035.55 yuan, after negotiations, the company agreed to float 3 percentage points, the final agreed price of 973.44 yuan.
3, after-sales service: Yu County Xiushui West Street Dexing Material Supply Station according to the national coal mine quality and safety standards.
4. Other matters agreed in the contract.
Signature of participants in the negotiations:
Moderator:
Board of Directors: Supervisory Board:
Comprehensive Office: Management Department: Electrical and Mechanical Department: Finance Department:
Supply Department: Technical Department:
Yu County Xiu Shui Xijie Dexing Material Supply Station (agent):
20xx, x month, x day
Minutes of Business Negotiation 3Invitation to Bid No.: Content:
Date: Month, Year Location:
Participants: Party A:
The two sides clarified and negotiated on the scope of work, service standards, acceptance procedures and contract price of the project, and reached an agreement on the following, which is summarized as follows:
1. Scope of work: for the Garden District for greening and garage renovation.
2, the two sides on the scope of repair works, construction technical requirements and quality standards agreed.
3, the duration of the project: from the date of signing the contract to 40 days after the date of signing the contract
4, the quality of the project warranty period of 12 months.
5, the contract price: the contract to the actual amount of work for settlement, the settlement amount shall not exceed the total cost of 10,000 yuan.
6, payment: the contractor confirms the completion of the settlement report within 7 days from the date of the contractor to pay the contractor 95% of the total price of the completed project settlement . The remaining 5% as the project warranty, one year after no project quality problems returned.
Party A: xxx company
Party B: xxx limited company Technician:
Commercial staff:
;