What are the processes of medical clean boards used in construction that deserve our attention?

Our society is constantly changing and developing, and there are more and more building materials, and DPX medical clean board is a widely used product nowadays. When used in conjunction with insulation materials, it can be used directly as a building wall, thus greatly reducing the weight of the building.

Cleaning the bottom of the wall:Before pasting the medical clean board, clean and wet the bottom of the wall, wait for the wet water on the wall to dry quickly before pasting the wall. The bottom layer should not be soiled by oil and ensure a certain degree of smoothness. When the installation requirements of DPX medical clean board are met, the pasting construction usually starts 30-60 minutes after the water is dipped.

Preparation for adhesive distribution:Prepare (structural adhesive or silicone or marble adhesive) and industrial foam double-sided tape, etc. For adhesive dispensing. Behind the sheet, foam double-sided tape and structural adhesive should be evenly distributed.

Pulling water vertical control line:Before installing the whole medical clean board, according to the survival surface control surface set by the surveyor, pulling water vertical control line on the site, especially before installing the DPX medical clean board on the bottom of the equipment, according to the direction of elevation with a leveling ruler to find the level, fixing the matting, and then all the boards will be affixed.