2017 Construction Material Purchase and Sales Contract Model 1:
Party A: xxxx Limited (hereinafter referred to as Party A)
Party B: xxxx Limited (hereinafter referred to as Party B)
In accordance with the "Contract Law of the People's Republic of China*** and the State of China" and the "Construction Law of the People's Republic of China*** and the State of China", and other relevant laws and regulations, and in accordance with the equality, Voluntariness, fairness and honesty and credit, the two sides on the construction of the project consensus, to enter into the following terms, in order to *** with compliance.
Article 1 Material Name
1.1 Name of material (product or equipment): See the material list for details
1.2 Specification: See the material list for details
1.3 Quality standard (or technical index): Conforms to the corresponding product quality standard of the country
1.4 The purchased materials are accompanied by The service program also includes items 3 and 4.
1.4.1. You may consult Party B on the installation of the purchased materials and equipment, as well as their functions and methods of use.
1.4.2. may send technicians to the site to guide Party A in the construction.
1.4.3 Party B is responsible for installing and instructing Party A or the users of the materials and equipments on the correct use and general maintenance.
1.4.4 Party B is responsible for the after-sales service and maintenance of the purchased materials. (Warranty time according to the warranty of the purchased materials or equipment or according to the relevant provisions of the contract signed by Party A and the owner)
5. Other:
Article 2 Material Packaging
2.1 Packaging Standard: General
2.2 Packaging Costs: to be borne by Party B
2.3 Disposal method of packaging: choose the following 1 and 3 disposal methods.
1. Party A is responsible for its own recycling
2. Packaging with the product is owned by Party B
3. Other methods: other garbage generated on site related to the product packaging and its related cleanup is the responsibility of Party B
Article 3 Quantity of materials
3.1 Purchase quantity: See Material List
3.2 Unit of Measurement: See Material List
3.3 Confirmation of Contract Quantity: Subject to the quantity confirmed in Party A's Material Inventory Consumption List
Article 4 Receiving Regulations
4.1 Delivering Unit: xxxx Co. Unit: xxxx Co., Ltd
4.3 Place of receipt: xxxx
4.4 Method of receipt: subject to confirmation by Party A
4.5 Mode of transportation: steamshipment
4.6 Responsibility for the transportation cost: borne by Party B
4.7 Time of receipt: subject to Party A's notification
< strong> Article 5 Receiving Time
Article 5 Receiving Time
There is a provision for receiving goods, and the delivery unit shall be xxxx Co. strong> Article 5 Receiving time
5.1 The contract starts and ends from: xx month xx 20xx to xx month xx 20xx . The specific nodes during the period, see the relevant documents provided by Party A.
5.2 If the contract is overdue due to Party B, two ten thousandths of the total price of Party B's materials shall be deducted at the time of purchase settlement for each day overdue.
5.3 In the following cases, Party B notifies Party A in writing, and after Party A's approval, the material supply can be postponed accordingly.
5.3.1 According to the provisions of the construction preparation, the construction site can not be provided, the water, power roads can not be connected, obstacles can not be removed to affect the construction site.
5.3.2 Party A puts forward major design changes; new items or material supply increased significantly.
5.3.3 Force majeure (typhoons, earthquakes and other natural disasters) during construction.
5.3.4 Party B within three days after the occurrence of the above circumstances, the content of the delay to Party A to submit a written report, to be recognized by the Party A visa, late not recognized.
5.4 If Party B violates the provisions of the contract and its annexes on the time of supply of materials and the progress of additional services, Party A has the right to adjust the materials and the scope of services within the scope of the contract.
Article 6 Contract Price
6.1 The total price of this contract is xxxxx yuan (capital xxxx yuan whole). As the basis for payment of advance payment for materials and payment for each batch of materials batch by batch.
6.2 The above contract price includes tax.
Before the completion of the project, the total amount of advance payment and progress payment collected by Party B shall be 80% of the completed works.
6.3 The contract price is fixed price contract. The total price of material purchase is lump-sum, if the increase or decrease of material purchase is caused by the change of Party A's requirement, it will be included in the final settlement, and Party A will not increase or decrease the purchase quantity and price for other reasons.
Article 7 Payment
7.1 Advance payment of materials: according to the contract of ?
Article 7 Payment of Goods
Advance payment of materials: according to the contract ?
7.2 Progress payment for material procurement: 80% progress payment according to the actual amount of materials provided and additional services completed by Party B in the month after Party A's audit. After Party A handles the audit, the accumulated funds are paid to the final settlement price of ? % . Leave ? % as a material warranty, returned without interest after one year.
7.3 Party B's construction and living water, electricity and mechanical benches, measurements, by the two sides in accordance with the provisions of the quota or according to the actual settlement.
7.4 Party B in the unit project completion and acceptance of one month after the completion of the project settlement will be sent to Party A. If the settlement is delayed due to Party B's own reasons, the responsibility will be borne by Party B itself.
7.5 Party B`s `pre-budgeting personnel should have the unit`s power of attorney, clearly authorized the settlement of the project, time, amount, transfer of bank account, account number. Without the power of attorney, shall not deal with Party A for pre-settlement.
7.6 After the completion and acceptance of the project, Party B submitted the project pre-budget (in triplicate) can only be used as a basis for payment of progress payments, Party A received Party B's budget within one month of the audit.
7.7 Settlement must be signed by both parties responsible for the signature (Party B signatory should have a legal person's authorization) and stamped with the official seal of the unit.
7.8 project settlement shall not be altered, if altered must be signed by both parties in charge, and cover both sides of the amended chapter, otherwise invalid settlement.
7.9 Basis of payment: