The construction unit individual annual work summary sample

Part I construction unit individual annual work summary model

As the Ministry of Engineering sent out the project department on-site staff, my work objectives and tasks are: wholeheartedly for the Party and the project department to provide quality services, supervise the safety and civilization of the production, quality of the project, the project progress, and to prevent the risk of timely contact company Strive to minimize the risk of business.

At the beginning of the year I was assigned to work in the project department, the project for the ___ road west from ___ to ___ east to ___ the total length of about ___ kilometers of strip park. Because the project is located in __ road, west adjacent to __ park, the road visitors, pedestrians are more, so the focus of the project is safe and civilized production. I went to the project department, according to the company's guidelines, requirements and engineering department issued by the target task, combined with the specific circumstances of the project department from the following aspects of the work:

First, safe and civilized production

1, the project image: to the project department with the company's uniform customized uniforms, and urged the project department Management personnel in a timely manner customized and hung according to the company's requirements of publicity slogans.

2, according to the requirements of the company's safety department, urged the project department to produce warning slogans, publicity slogans.

3, to strengthen the site tree planting safety: due to the construction site pedestrians, tourists, often form a crowd of pedestrians in every case of planting large trees, so each time to assist the construction staff to maintain site safety, urge pedestrians to stay away from the scene, the crane lifting arm is strictly prohibited under the station, to be planted in the pits of the enclosure in order to prevent injuries to pedestrians.

4, to strengthen the site of electricity safety management: the Ministry of the project to convey the requirements of the Ministry of Safety, urging the construction workers must be licensed to work, the wire must be used to skin cable, prohibited the use of flower line.

5, convey the company's requirements for holidays and drought, flood control during the site to strengthen safety inspections, strict management of the document, and urged the site management personnel to implement the requirements.

Second, the quality of the project

Because the site construction workers are mostly for the first time planting seedlings, so in the construction of the often together to communicate, learn from each other, and try their best to complete the planting of quality and quantity.

1, seedling quality acceptance: seedling arrival according to the owner of the seedling specification requirements, seedling diameter, crown, branching point, soil ball size, etc. to the construction workers to provide rationalization recommendations.

2, seedling planting: seedling planting on the seedling cutting, tree bundling - tying, lifting, planting soil filling, rooting water watering and so on to provide rationalization advice.

3, the prevention and control of pests and diseases of seedlings: in the event of pests and diseases of seedlings, after consulting and asking the professionals to provide advice to the construction personnel.

Third, the progress of the project

1, weekly and timely to the company's engineering department to report the weekly work, the next week's plan, weekly progress of the project and the overall progress of the project.

2, every day at the site of the field to understand the day's construction content, as well as the amount of work completed on the day.

Four, communication services

1, to return to the company to assist the project department in the required information on the signature, seal.

2, participated in some of the routine meetings of the Supervisors, to understand the Party, the Supervisors of the project requirements, the project proposed by the Ministry of the construction of the problem to be solved, and to solve the problem of the two sides to reach the **** knowledge.

3, convey the implementation of the company's engineering department of the project department's management documents and requirements.

4, to help the project department to the company's Finance Department to receive for business, tax certification information: to assist the Ministry of Administration and the project department in charge of identification of labor contracts.

5, own camera took photos of the scene, for the company to do information publicity provides picture information.

Fifth, corporate risk prevention

1, artificial wages: usually in the field often ask the migrant workers, to understand the wages of migrant workers are still issued in a timely manner, basically no arrears. Understand from the construction team, recently gave them part of the wages, there are a small amount of arrears, I still need to track.

2, material payments: due to the material style project key payments, so I focus on the main material suppliers to understand, learned that they have not signed a supply contract with the project chapter.

The following is the Ministry of the project on the payment of several major material suppliers:

(1) seedling suppliers, for seedlings ___ more than 10,000 yuan, arrears of ___ more than 10,000 yuan.

(2) paving suppliers, for bricks __ more than ten thousand yuan, owed more than __ million yuan.

(3) commercial concrete suppliers, settle no arrears.

(4) Cement suppliers, a small amount of arrears.

(5) the rest of the material suppliers to understand the record of contact information in order to follow up in a timely manner.

3, because of the involvement of the project warranty, so I did statistics on the death of seedlings.

Six, there are shortcomings, improvement and enhancement

I was sent out to work in the project department, in this close to a year's work and study, the better to complete the company, the engineering center of the tasks assigned. But in the work I found my own professional and technical is not hard, the business level needs to be improved, for this reason, I will work more diligently, study hard, and strive to improve the quality of culture and a variety of work skills, for the company to make its due contribution.

Part II construction unit individual annual work summary model

20__ year's work has ended, in this resignation and welcome the new year, to summarize the work of the past year, there is progress, gains, achievements, but also deficiencies. Now the year's work is summarized as follows:

First, the overall state of work

(a) the first half of the work - tense and busy green

Due to the company has just been established soon, the staffing is not enough, at the end of 20__ there are a number of projects At the same time, the first half of the case, I am also responsible for Anhui Tuoshan Heavy Industry Machinery Co., Ltd. comprehensive building project, Anhui Ma casting equipment manufacturing Co. The site management was carried out in the daytime, and the data was organized at night. In spite of this, there are still several sites at the same time there are things to deal with, because they can not be at the same time to the scene and was complained about the situation.

(2) the second half of the work - relatively easy

In the second half of the year, the Minowa, Ma casting, Tuoshan Heavy Industry and Su village kindergarten successive completion of the acceptance of the work, in addition to the two interns can help me share some of the work, so the second half of the work is relatively easy. The second half of the work is relatively easy.

Second, the performance of job responsibilities

1, fully responsible for the site construction organization, coordination and command

After the establishment of each project department, I was the first time to assist the project manager to carry out on-site inspections, drawing the construction site layout, reasonable planning of the construction of the road, the material field, the location of construction machinery and temporary facilities. The location of construction roads, material yards, construction equipment and temporary facilities, with the company's safety section to guide the setup of the site of temporary electricity, several projects basically one-time to meet the construction specifications and safety acceptance standards.

During the implementation of the project, I received the instructions from the company and the leading departments at all levels to convey and implement them in a timely manner, and provide timely feedback on the implementation of the situation. In the work of many times to coordinate with the construction unit, the supervision unit and the project department and the relationship between the team to avoid differences and conflicts.

Over the past year, the work of the project departments have been carried out smoothly, and the construction production has been carried out in a healthy and orderly manner.

2, technical guidance

(1) before the project began to study the drawings, and summarize the supervision and the various problems found by the team, in a timely manner in the drawing review to solve one by one.

(2) each process before the commencement of work in a timely manner to the person in charge of the team to carry out technical briefing, the construction of key parts of the adherence to the side station, and found that the problem is given in a timely manner to solve.

(3) In the construction process, found that there are problems with the design of the drawings or the existence of construction difficulties, and actively seek solutions, and communicate with the site supervisors and designers, to ensure the smooth progress of construction.

3, quality control

(1) Strictly control the quality of incoming materials, including checking the quality assurance information, checking the appearance of the material, and timely delivery of samples for testing to eliminate unqualified materials used in the project.

(2) construction specifications and quality requirements are timely to the person in charge of the team briefing, and check its implementation, increase the frequency and intensity of inspections, to avoid rework and quality hazards.

(3) the strict implementation of the "three inspection" system, in any link found in the quality of hidden problems, are required to immediately rectify the relevant personnel, rectification of qualified before the construction of the next process.

4, progress control

(1) before the start of the development of the general progress plan, in the construction process to develop a monthly progress plan and a specific process (such as concrete pouring time) for the object of the progress plan, and to check the implementation of the progress plan, if necessary, to make reasonable adjustments.

(2) Coordination of various teams to cooperate with each other, reasonable arrangements for cross construction, in order to ensure quality, safety, under the premise of the limit to speed up the construction progress.

(3) Always pay attention to the weather conditions, in order to adjust the operation plan, reduce the degree of influence by the weather.

5, cost control

(1) in the calculation of material requirements to strive to be correct, and more exchanges with experienced construction personnel, to reasonably determine the amount of material loss, as far as possible, to avoid the inaccuracy of calculations to increase the cost of acquisition and storage costs.

(2) Reasonable use of materials that can be reused to avoid unnecessary waste.

(3) Strengthen guidance and management to reduce losses due to rework.

(4) Reasonably accelerate the construction schedule to effectively reduce costs.

6, safety management

(1) Often to the team leader and workers safety education, improve the safety awareness of workers.

(2) Safety slogans and warning signs are hung on the construction site to create a good atmosphere for safety production.

(3) Strengthen the frequency and intensity of safety inspections to eliminate potential safety hazards in a timely manner.

(4) Punish those who do not rectify the hidden safety hazards and do not obey the management of production safety, and clear them away from the construction site if necessary.

7, data collection and organization

(1) timely collection of a variety of technical information and safety information, to ensure that the data and progress synchronization.

(2) Signing and sealing procedures in a timely manner after the acceptance of each sub-part of the project to avoid data backlog.

(3) Data collection and organization should be properly stored to avoid loss.

(4) completion of the acceptance of the timely completion of the record and transfer of information.

8, learning and training

In the past year, we have continued to improve ourselves through learning and training. 20__ March through the training and assessment of qualified, and obtained the full-time safety assessment B. 20__ September to participate in the national first-class construction division examination and passed three of them.

Third, the work of the deficiencies and direction of efforts

(a) unfamiliar with the implementation of the new norms

The quality of acceptance of the project since May 20__ began to implement the new norms, such as the retention program of the mortar test block, the promotion of the use of high-strength rebar, the strengthening of earthquake-resistant design and other norms have been implemented, the company has purchased a complete set of norms, the company has been able to implement the new norms. The company has purchased a complete set of specifications, in the future work to strengthen the study, to avoid work errors caused by the lack of understanding of the new norms.

(ii) The feedback of problems is relatively lagging behind

The work in 20__ was smooth on the whole, but there are some problems. Such as Tuo Shan Heavy Industry had a dispute caused by the workers to ask for wages, because of the failure to advance insight, feedback to the company's leadership, failed to avoid the dispute. In addition. Soter Auto Parts Co., Ltd. complex project, because of listening to Mr. Wang's side of the story (Mr. Wang insisted that the company leadership agreed to the construction site does not do five signs a map), because of timely communication with the leadership and delayed the production of five signs a map of the time.

(C) 20__ year efforts to

1, strengthen learning, the improvement of the accumulation of experience and improve the methodology, to carry out the whole process and the full range of project management work, and strive to make themselves a high level, composite middle and senior management personnel.

2, strengthen the office software learning, improve work efficiency.

3, strengthen the study of theory and the application of the combination of practice, and strive to achieve good results in the 20__ year of the second level of construction engineer additions and the first level of construction engineer physical examination.

4, strengthen the communication with colleagues and leaders to better carry out the work.

Fourth, summarize

Looking back at the old year, both nervous year, but also a year of fulfillment. Looking forward to the new year, in the new year, I will summarize the experience, learn from the lessons, pay more efforts to more energetic state of mind and solid work style into the work, for the company to make greater contributions.

Part III construction unit individual annual summary of the work of the model

In this year's time, I accept the company's leadership arrangements, January-November served as a supervisor of the Dragon project and the community on the two projects of the supervision of the civil works, and December began to serve as a civil works of the Mori Garden project. The civil engineering supervision of the Mori Garden project. In the process of supervision of the above projects, I obey the company's arrangements, obey the director of the leadership of the representative, in addition to the conventional supervision specifications for quality process control, in the actual operation of the process, to do a lot of work, I now summarize the work done this year is as follows:

First, to strengthen their own theoretical learning, and timely charging to their own from time to time to give their own repositioning.

I have a strong motivation to work at the same time do not forget to learn, with the theory of arming their minds, I work through the current year, I seize the time to study, in October to participate in the organization of the Office of the Supervision Engineer Qualification Examination, passed the examination with flying colors, got the Chongqing Supervision Engineer Certificate, adding their own continue to do a good job of supervision after the work of confidence and determination. The company's business is to provide the best possible service to the public.

Second, familiarize yourself with the basic situation of the project, do a good job before the start of construction and construction supervision preparation.

Supervisory engineer in accordance with the supervision of the project, first of all, I carefully familiarize myself with the drawings, to find out the focus of quality control, to determine the control objectives. Longhu University City project with a total construction area of 140,000 square meters, is scheduled to be completed this month; on the state international community project with a total construction area of more than 70,000 square meters, started on January 5 this year, the planned construction period of two years, is now building the main project; Ruikun. Thyssen Garden project with a total construction area of 60,000 square meters, 1 good this month before the start of construction, the planned construction period of 20 months, is now carrying out basic engineering.

Third, coordinate the relationship between the parties involved in the construction to ensure that the quality of construction is controlled, the project in an orderly manner.

1, hold on to the construction side of the technical director and quality management and other key personnel. Supervision involved in their management, strict quality control of the project, each process to do control beforehand, reduce and minimize quality accidents, try to do less rework or no rework.

2, the important parts of each process to do in mind, which should be strictly controlled, supervision must be in place to check acceptance.

3, to do, mouth diligence, foot diligence, less layman's talk, respect for the construction side of the technical staff, to establish the image of supervision.

4, timely handling of conflicts and problems arising in the construction of the project, coordinating and resolving disputes for more than 20 times in the current year, to maintain the stability of the site, to ensure the smooth progress of the project, and to ensure that the management of the normalization of the relationship between the management staff and the workers.

Fourth, to ensure that the construction progress and investment control, to help the construction side in accordance with the provisions of the reasonable advancement of the process.

1, to participate in the construction party to prepare the construction progress plan, their own construction period for each process to be realistic, the construction team's labor force, equipment inputs, etc. to do to meet the construction requirements as far as possible, and supervise the completion of the progress of the construction party.

2, the completion of each individual project volume to do a good understanding of the situation, every completion of a project will be together with the director of the project in a timely manner to report to the owner for confirmation. So that the end of the month to review the amount of work.

3, according to the actual situation of the site, to the owner to put forward rationalization proposals to reduce investment.

In short, I am in this year's supervision of construction projects, the quality of completed and construction projects under construction, progress, investment, are to meet the owner and the Supervision Department requirements. In the future work I have to work harder to learn the supervision specification and professional and technical level, try to do my job, for the development of the city's construction industry continue to contribute their own strength!