What does the inspection and test fee in the project budget mean?

Simply put, it is the cost of sending materials to the testing center for testing, such as steel bars and concrete test blocks, which need to be made on site and sent to the testing center for testing.

The charging standards for quality inspection and testing of construction projects include material fees, water and electricity fuel fees, equipment verification depreciation maintenance fees, laboratory maintenance fees, labor wages, management fees, personnel training fees, office expenses, taxes and other items (excluding import and export fees for heavy equipment).

Material inspection fee: Due to the different types and scope of materials and products inspection in different places, the inspection fee varies greatly. This fee is calculated by the construction unit when bidding, according to the actual situation of the project site and with reference to the following standards. Housing construction projects (including ancillary installation projects) are calculated according to the construction area per square meter.

Among them, construction engineering accounts for 50%, decoration engineering accounts for 20%, electrical engineering accounts for 15%, and HVAC engineering accounts for 15%. Municipal and garden projects are calculated at 60% of the actual cost (excluding the self-built laboratory).

(1) 4 yuan per square meter with insufficient building area 10000m2.

(2) 3 yuan per square meter if the construction area is more than 10000 square meters; A single project can get up to 80 thousand yuan.

Extended data:

According to national regulations, the budget of capital construction projects is carried out in stages with the construction procedures. Due to the different budget basis and work depth in each stage, the budget of capital construction projects can be divided into two categories, namely: first, budget estimate; Secondly, the budget. There are two kinds of budget estimates: feasibility study investment budget and preliminary design budget, which are divided into construction drawing design budget and construction budget. Capital construction project budget is the general name of the above budgetary estimate, budgetary estimate and budget.

The role of engineering budget quota

(1) The budgetary estimate quota of construction and installation projects is the basis for the technical and economic comparison of design schemes by design units, as well as for the preparation of preliminary design budgetary estimates and the revision of budgetary estimates;

(2) The budget estimate quota of construction and installation projects can also be used as the basis for the construction unit to prepare the main material plan.

There are roughly the following differences between the budget estimate and the budget:

(1) plays different roles. The budget estimate is prepared in the preliminary design stage as a document for the examination and approval of national and regional investments. After approval, it is used to prepare the fixed assets plan, which is the basis for controlling the investment of construction projects. Budget plays the role of building product price in the design stage of construction drawing, and is the pre-tender estimate of project price.

(2) According to different compilation basis, the budgetary estimate is compiled according to the budgetary estimate quota or budgetary estimate index. Its content items are expanded and simplified, and it is universal. Budget is compiled according to budget quota and comprehensive budget quota, and its items are more detailed and important.

(3) The budget estimate should include all the contents of the project construction. For example, the total budget estimate should consider all the expenses required from the beginning of preparation to the completion and acceptance before delivery; Generally, the budget does not include the total budget, but only the unit project budget and comprehensive budget, and does not include the expenses of the preparatory stage (such as survey, land acquisition, training of production personnel, etc.). ).