City, county (city) people's government is responsible for urban heating, water, gas, municipal utilities administrative department (hereinafter referred to as the municipal utilities department) of the administrative area of heat, water, gas supervision and management, the specific work can be entrusted to its municipal utilities management organizations. Article IV urban planning, finance, price, industry and commerce, public security and fire prevention, quality and technical supervision, health, water conservancy, environmental protection and other departments in their respective areas of responsibility for heat, water, gas related management. Chapter II Planning, Construction and Facilities Management Section I. General provisions of Article 5 municipalities, counties (cities) municipal utilities department shall be based on local socio-economic development and urban planning, organization and preparation of heating, water, gas special planning, integrated and coordinated by the administrative department of urban planning, in accordance with the statutory procedures for approval and then organize and implement. Article 6 The preparation of heating, water, gas special planning, shall be consistent with urban planning, adhere to the principle of urban and rural integration, rational layout, protection of the environment, conservation of resources and energy. Article VII heat, water, gas public **** pipe network and its ancillary facilities project construction, must be in line with the heat, water, gas special planning.
In the heat, water, gas special planning to determine the construction of urban public **** pipeline network laying range, shall not be approved to repeat the construction of public **** pipeline network; urban public **** pipeline network construction of the implementation of franchising, shall comply with the franchise agreement. Article VIII of the new urban development, transformation projects in old areas, new construction, reconstruction, expansion of urban roads, bridges and other municipal projects, in accordance with the heat, water, gas special planning laying of urban public **** pipe network, public **** pipe network should be the same time as the main project design, construction and acceptance of the completion of the same time. Article IX new construction, alteration, expansion projects connected to the urban public **** pipe network system, or increase the amount of heat, water, gas supply, the total investment in construction projects should include the urban public **** pipe network connected to the part of the branch line pipe network and its ancillary facilities construction costs.
The design, construction, procurement of materials and installation of equipment for the feeder pipe network and its ancillary facilities shall be in accordance with the specific requirements of the operator of the heat, water and gas supply (hereinafter referred to as the operator). The operator's requirements shall not violate laws, regulations and relevant technical standards of the state and autonomous regions.
Project completion and acceptance, the construction unit shall invite the operator to participate; does not meet the project quality acceptance standards, the construction unit shall not be delivered for use, the operator shall not be branched pipeline network and its ancillary facilities connected to the urban public **** pipe network. Article 10 The new residential shall be used to split the cycle, split the gate out of the house control system, except for the installation of intelligent control systems. Article XI city, county (city), the administrative department of urban planning shall, in conjunction with the municipal utilities department, based on the heating, water, gas special planning, heating, water, gas public **** pipe network and its appurtenant facilities, as well as the gas supply site of the safety and protection of the scope of the municipal, county (city) people's government for approval and then announced. Article 12 It is prohibited to carry out the following acts in the urban heating, water and gas public **** pipe network and its ancillary facilities, as well as gas supply stations within the scope of safety protection:
(1) the construction of buildings, structures and other facilities in violation of the special plan;
(2) piling up flammable and explosive substances, or dumping, discharging corrosive liquids and gases;
(3) ditching, digging ditches, digging pits to take soil, or digging pits for soil, or digging pits for soil. ditching, digging pits for soil, drilling or planting deep-rooted plants;
(iv) conducting surveys, construction and other construction activities in violation of the relevant state technical standards and specifications;
(v) other damage to the heat, water and gas public **** pipeline network and its ancillary facilities, affecting their safety and normal operation. Article XIII of the construction needs, approved by the alteration of urban heating, water, gas public **** pipe network and its ancillary facilities, or in the heating, water, gas public **** pipe network and its ancillary facilities around the burial of other pipelines, the construction unit should be agreed with the operator of the protection measures, design, construction program should be agreed with the operator. Damage caused by the damage shall be compensated. Article XIV of heat, water, gas pipeline network and its ancillary facilities repair, maintenance responsibility borne by the operator. The operator shall establish a production safety responsibility system, regular heating, water, gas pipeline network and its ancillary facilities for inspection, inspection, dredging, maintenance, repair, timely elimination of potential accidents, to ensure the safe operation of municipal utilities. Article 15 The renewal, renovation, repair and maintenance costs of the heat supply, water, gas pipeline network and its ancillary facilities shall be borne in the following manner:
(1) the user's indoor portion or the portion of the user's separate use by the owner of the house;
(2) the portion of the differentiated ownership of the building within the **** use of the building, by the differentiated ownership of the building to share;
() (C) the user outdoor or differentiated ownership of buildings outside the connection with the urban public **** pipeline network part, shared by all owners in the area; which increases the conversion, regulation facilities, equipment, by the owner of the facilities, equipment;
(D) the public **** pipeline network and its appurtenant facilities part, borne by the operator;
(E) the price of the charge of heat, water, gas have included the initial installation fee, maintenance fee, renewal fee of sub-division metering meter, the part of the cost borne by the operator.