1, the first stage of construction (grass-roots processing stage)
First of all, the electrician according to the construction requirements into the field for the transformation of the electric circuit department line, slotting, buried pipe. Plumbing and electrician's construction is basically synchronized, but also involves the transformation of the water circuit, slotting, walking pipe (hot and cold water pipes). At the same time, carpentry into the field, put line, hanging level, hanging ceiling, package door sets, window sets, etc., if necessary, also need to make wooden cabinet frame, wooden door, all the wooden panels should be brushed varnish. (This is very important, directly affecting the process behind).
2, the second stage of construction (wall and floor construction)
This time the wall and floor tile workers into the field
(1) wall construction clean wall (very important, directly affect the final effect of the wall), so that the wall surface is clean and smooth. Start brushing the first putty
(2) the construction of the ground paving bathroom wall tiles, balcony floor tiles, paving kitchen wall tiles, bathtub foundation masonry, bathroom, kitchen floor waterproof layer, bathroom floor, kitchen floor. At this time should pay attention to the protection of the ground, the protection of the ground can generally spread sawn surface or paved cardboard.
(3) cleaning (this cleaning is very important for the back of the paint to prepare)
3, the third stage of construction
(1) painters: sand patch, on the first paint
(2) wall workers: brush the second putty, then sand flat, on the first latex paint
(3) clean (important)
(4) painters: on the The second and third paint
(5) wall workers: on the second latex paint, the third latex paint III. Finishing work switch and socket installation, installation of lamps and lanterns, installation of hardware and sanitary ware, installation of curtain rods, installation of glass products.
Finally do the most comprehensive cleaning work (generally ask a professional cleaning company)
1, check the project lamps and lanterns, sockets, plumbing, faucets, sanitary ware, check the floor tiles, wall tiles, check the ceiling plasterboard, metal buckles, check the wood molding, windows, cabinets, doors and other parts of the paint, check the wall coatings, wallpaper, glass installation and so on whether qualified.
2. Customer acceptance 3. Customer acceptance and delivery of the project.