The hospital now has two hospital districts, the west hospital construction area of 10,000 square meters. 2013 March completed and put into use of the East Hospital, located in Tinghu New District, Tingting Middle Road 66, 103 acres of land for the construction of the building area of 92,000 square meters, with a total investment of 700 million yuan. The hospital is built on the idea of "second-level hospital standard construction, reserving space for the development of third-level hospitals", with a high starting point for planning and high standard construction. The entire hospital complex contains outpatient and emergency building, medical building, inpatient building, elderly rehabilitation building, various types of ancillary facilities and ecological landscape, with a greening rate of 48.6% and 800 beds. There are more than 20 clinical departments, 12 medical and technical departments and 7 subordinate outpatient clinics. The key departments are orthopedics, neurosurgery, general surgery, endocrinology, traditional Chinese medicine, nephrology, infection, obstetrics and gynecology, etc. There are first-class laminar flow purification operating room, integrated physical examination center, VIP obstetrics ward and intensive care unit (ICU).
The hospital has purchased 64-row 128-slice spiral CT, Philips 1.5T nuclear magnetic **** vibration, Philips large flat-panel angiography (DSA), linear gas pedal, Philips digital X-ray film system (DR), Philips color Doppler ultrasound diagnostic instrument, digital gastrointestinal machine, digital molybdenum target mammography, and with the hospital-wide network of the PACS system to meet the needs of the clinical work, its hardware facilities and inpatient hospitals. Its hardware facilities and hospitalization conditions are at the first-class level in the city.