Work meeting minutes

Sample Work Meeting Minutes (General 7)

In daily study, work or life, more and more people will go to the use of meeting minutes, meeting minutes are based on the minutes of the meeting is processed, organized out of a narrative and introductory documents. You write the minutes of the meeting is always at a loss? The following is a sample of work meeting minutes (general 7 articles) that I have organized for you, only for reference, let's take a look at it.

Work meeting minutes 1

20xx April 15 morning, the township government mayor xx-x in the township government conference room on the third floor presided over the first quarter of the work of production safety meeting, the township safety committee members participated in the meeting, the meeting conveyed the spirit of the county's recently held work safety conference, respectively, listened to the public security police station, power supply and geologic disaster prevention and control, flood control, and so on. The production safety work of the person responsible for production safety report, the meeting informed the town in 20xx production safety work, and the 20xx production safety work was studied and deployed. The minutes of the meeting are as follows:

First, the meeting pointed out:

20xx year, in the town safety committee member units *** with the efforts of the town's safety production in general to maintain a stable situation. 20xx January-March, the town's safety production situation in general stable. However, the production safety foundation is still relatively weak, especially the relevant owners of the main responsibility for production safety awareness of hail individual owners of production safety awareness is not strong, road traffic safety hazards are more serious, etc., the meeting informed the night of April 10, Baofa integrated processing plant occurred in the death of a person's production safety accidents, requiring the relevant responsible units, the responsible person must pay attention to the importance of strengthening supervision, pay close attention to the implementation of corrective measures in place, effective To prevent serious accidents.

Second, the meeting emphasized:

The responsible units, responsible persons must raise awareness, enhance responsibility; to often comprehensive inspection, timely detection of problems; to pay close attention to supervise the rectification and elimination of hidden dangers; to strengthen the collaboration and grasp the **** tube, really solid grasp of the current work of the production safety, to create a safe, stable and harmonious DALO.

Third, the meeting requirements:

The relevant responsible units, the responsible person should be in strict accordance with the deployment of the higher level on the work of production safety and requirements, combined with the actual work and the actual situation of the scope of responsibility, serious, solid grasp of the current work of production safety.

1, strengthen the publicity and training.

To combine the safety month activities, the organization of the production enterprises to carry out a special staff must be licensed to work, the production process must be strictly implemented and comply with the safety of production laws and regulations and policies of publicity and education and skills training, to establish a "production must be safe, safety can be produced," "" Safety is the greatest benefit" consciousness; villages should cooperate with the public security police station to carry out a comprehensive road traffic safety education, rectification activities.

2, strengthen the responsibility, clear work objectives, pay close attention to the implementation of production safety responsibility system.

Firmly establish the development is the first priority safety is the first responsibility of the concept, in the ideological importance of production safety, in action consciously grasp the production safety. With reference to the control targets issued by the county government, at the beginning of the year the town developed a practical production safety responsibility objectives, and the village committees, relevant departments, enterprises signed a production safety target responsibility, the implementation of the production safety responsibility system at all levels, and really do a clear responsibility, responsibility, strict management, really make the responsibility fall into place.

3, to continue in-depth investigation and management of hidden dangers, to grasp the key industry areas of production safety supervision.

(1) from the government, enterprise level to establish the hidden trouble hierarchical management and major sources of danger hierarchical monitoring system, to do hidden trouble investigation and management system, regular, resolutely eliminate the generation of new hidden dangers, the enterprise should be a comprehensive investigation of hidden dangers, the possibility of accidents of all kinds of hidden dangers, the implementation of the responsibility for rectification, funding and monitoring measures, rectification and in place within the time limit to ensure safety, the government to strengthen the hidden trouble investigation The government strengthens the guidance of the work, supervises the establishment of a database of hidden danger investigation and management, and regularly supervises the situation of hidden danger investigation and management. Improve and perfect the system of quarterly meetings, the system of reporting on the performance of production safety, the system of safety education and training, and improve the system of emergency rescue plans for accidents in enterprises of relevant departments. The implementation of three requirements: First, the hidden danger investigation seriously and carefully, leaving no blind spots and dead ends; second, the hidden danger rectification work responsibility, measures, funds, time limits and plans for the five implementation; third, the establishment of a sound mechanism for the grading and management of the major hidden dangers, and consolidate the results of hidden danger management.

(2) increase the investigation and handling of safety accidents, serious accident investigation and handling, strict accountability, and effectively implement the safety accountability system. In accordance with the occurrence of accidents "four do not let go" (the cause of the investigation is not let go, the responsible person can not be dealt with is not let go, the masses of workers can not be educated is not let go, there is no precautionary measures is not let go of the principle).

(3) highlight the focus, deepen the work of special rectification of production safety, the town safety committee members should be based on the functions of the department to regularly carry out special rectification of production safety, to carry out a good road safety, hazardous chemical safety, non-coal mine safety, civil explosives and fireworks safety, boiler and pressure vessel and other equipment safety, building safety, fire safety, school safety and other special rectification activities. The second quarter of the year, the first quarter of the year, the second quarter of the year.

The second quarter production safety work focuses on two characteristics: one is "May Day" is coming, and the second is the spring and summer rain into the flood season is prone to landslides and other geological disasters. These are the focus of the work of production safety and difficult, the next stage of the work of production safety to the implementation of the work.

① Hazardous chemical safety rectification, elimination of safety rectification resolutely closed and banned the "three-in-one", "multi-in-one" places, resolutely closed the existence of major safety hazards in the public **** gathering places.

② building construction safety rectification, special equipment safety rectification, geologic disaster risk investigation.

③ Strengthen publicity and education, improve the quality of safety, strengthen the main person in charge of enterprise, safety production management personnel and special operators safety training, improve safety awareness and safety skills.

④ Strengthen emergency management, improve the monitoring system, all departments, units, enterprises should pay attention to the preparation and revision of the plan, to ensure the practicality and operability of the plan, to strengthen the construction of the emergency response team.

4, strengthen the responsibility to implement the reporting system.

From this quarter, the village, the relevant regulatory responsibility unit should be in the last month of the quarter before the 25th written to the town safety office to briefly report the unit of production safety supervision performance in the quarter and the scope of responsibility for production safety, and will be used as one of the important content of the end of the year assessment of the relevant responsible person.

Deployment of production safety

On the morning of August 17, Zheng Xinmin, a member of the party group of the Upper and Middle Reach of the Yellow River Management Bureau and the director of the Bureau's safety committee, chaired a special meeting to re-study and re-deploy the Bureau's current and future period of production safety work.

The meeting conveyed and studied the Yellow River Commission "on the organization of the whole river safety production inspection of the emergency notice" spirit, the Bureau of Safety Committee Office reported the first half of the first half of the Bureau for two consecutive safety production inspection, key spot checks and inspections, the scope of the hidden security risks, governance, and the current problems were highlighted. Safety Committee members reported on the current production safety work.

The meeting extensively studied and discussed the current problems in the work of the Bureau's production safety, put forward specific rectification and implementation of the views, and put forward clear requirements for the next stage of production safety work:

First, we should be the Yellow River Commission "on the organization of the whole river safety production of the spirit of the Emergency Circular on the inspection of production safety" to reach each and every one of the workers in a timely manner, educate and guide the workers to enhance the safety of the work of the work of production safety The first one is to pass on the spirit of the Yellowstone Committee's "Emergency Notice on Organizing a Riverwide Safety Inspection" to every employee.

Secondly, we should continue to attach great importance to the supervision and management of production safety, and further strengthen the main responsibility for production safety. While implementing the signing of the commitment to production safety by all staff, we should effectively implement the responsibility for production safety into specific units, specific departments and each employee, and implement it into all aspects of the work and life of the whole bureau.

Third, in accordance with the unified deployment of the higher level, combined with the actual, immediately carry out production safety self-examination and self-correction activities, a comprehensive and detailed search for all types of accidents and hidden dangers found in the inspection, to be immediately rectified, can not guarantee the safety of the housing, facilities, equipment to be immediately stopped, the need for safety demonstration of hidden dangers to be as soon as possible organization of experts to demonstrate, and according to the conclusions of the demonstration of the rectification.

Fourth, we must strengthen the vehicle safety management, the development of a strong operability of the vehicle safety management rules and regulations, to reach the end of the life or conditions of the vehicle must be scrapped in accordance with the provisions of the regulations, the vehicle is strictly prohibited from overdue service, prohibit drunk driving, fatigue driving, prohibit the vehicle with a disease on the road to strengthen the safety of the driver's education and reminders, to prevent traffic accidents.

Fifth, to strengthen the test site of the reservoir, silt dams and the construction project under construction safety management, the development of emergency plans, the implementation of regulatory responsibility. Field survey planning, construction supervision units should seriously implement safety precautions to ensure personnel safety, engineering safety.

Sixth, we must strengthen the safety management of the agency cafeteria, strict food purchase, strict cafeteria safety operating procedures, increase environmental health inspections, to prevent food poisoning accidents. Strengthen the office living area water supply, power supply, gas supply and flood safety management, improve the safety precautions and emergency plans. Strengthen fire safety, equipped with adequate fire fighting equipment, increase fire safety publicity to prevent fire accidents.

Work Conference Minutes 2

At xx:xx on xx, xx, 20xx, the relevant deputy general manager of the company, the production department, the person in charge of the safety supervision department, the head of the xx gold mine, xx gold mine, xx gold mine, xx gold mine mine director held a special meeting on the rectification of the work of the conference room on the third floor of the xx gold mine. The meeting was chaired by the deputy general manager in charge of safety xxx, first by the three major gold mines reported the rectification situation, followed by the deputy general manager of the key emphasis.

First, the rectification of the gold mines

(a) xx gold mine:

1, has been on all the cables for inspection, according to the company's requirements, many cables need to be replaced, plans to replace the shaft and the main transportation lane of the cable first.

2, according to the rectification standards, the gold mine has made plans for electrical protection devices, but the relevant devices have not yet come in, and the grounding flat iron needs to be supplied in a hurry.

3, ventilation does not meet the standard requirements.

4, shaft fiberglass isolation net has been included in the plan, xx month xx, xx day one after another to arrive, and then in accordance with the rectification plan to replace. Emergency lighting is not yet in place, the relevant departments need to seize the time to supply.

5, the number of military telephones is insufficient, the main transport lane every 100 meters a telephone is still not reached.

(ii) xx gold mine

1, from the ground to the underground central substation or the main drainage pump room power cable, at least two independent lines should be laid, and should be led from the ground main substation of different bus section. Does not meet the requirements,

2, the ventilation system does not meet the standard requirements.

3. The emergency plan has not been reviewed.

4. Lack of construction design for in-service systems.

5, the inspection records are not complete, and records are required.

(C) xx gold mine

1, the ventilation system backdraft does not meet the requirements.

2, from xx month xx, remove the main transport lane wood support, carry out spray slurry support.

3, xx middle, xx middle high-voltage electricity is not in place, the pump has not yet started.

4, the gold mine and "Yongjin" cable 2, xx ~ xx months into the goods, need to be replaced.

1, fiberglass isolation fence has made plans to purchase and replace according to plan.

2, the emergency plan has not been evaluated, for the record.

3, the functional departments focus on checking the rectified places or places that are being rectified.

4, ventilation design, monitoring.

Second, the key matters emphasized by the deputy general manager

xxx deputy general manager:

1, cable: 20xx years after the purchase of the main xx, xx all change, the gold mines to list the plan, the principle of the xx cable 16mm2 above the replacement.

2, anti-wind: the relevant departments to come up with a design, set out the rectification plan. However, can not take the fan reversal as anti-wind.

3, other design requirements are fully signed, and design review records.

4, the various emergency plans should be constantly revised and improved, and after the internal review, invite the Safety Supervision Bureau experts to review and record.

5, the supervision of major hazards: abandoned tailings ponds, old empty water, oil depots, explosives, chemical hazards should be established regulatory files.

6, the safety section: there should be a breakdown of personnel division of labor, equipped with wind measurement, dust measurement, oxygen measurement and other instruments.

7, labor protection products: each unit to make plans based on the issuance of standards, the Trade Department should be based on the approval of the plan issued on time, each unit should be issued records.

xxx Deputy General Manager:

Glass fiber reinforced plastic isolation fence a plan xx month xx day in place, the cable xx days in place.

xxx deputy general manager:

1, xx gold mine main shaft motor arrived years ago.

2, xx gold mine blind main shaft hoist has a spot, the motor needs xx to xx months to arrive, the electronic control part of the technician to come up with requirements, xx to xx months to arrive.

xxx deputy general manager:

1, the principle:

(1) first main and then secondary, from the horse head door inward rectification.

(2) site and information synchronization (design and site does not match, if the site can be changed to change the site, otherwise change the design)

(3) first recovery after the standardization, (around the production recovery, and then the system specification of the rectification)

2, the rectification of the various:

(1) The functional departments to understand and master the standard requirements, come up with a unified specification.

(2) the improvement of the basic work, the functional departments to unify the standard, come up with the basic requirements of the work, step by step implementation, fiberglass isolation fence contract in one step, systematic, and the idea should be clear.

3, Trade Department: to ensure that the speed of purchase, quality control to implement previous procedures.

4, basic matters: cancel wood support, improve the ventilation system anti-wind device, major sources of danger to have monitoring files. Various safety activities such as speeches and competitions should be organized.

5. Safety on the face of the whole company, shaft isolation fence, cable replacement by the construction team to complete, internal dangerous operations must be approved.

Other matters: special operators to be licensed. Rectification matters require high standards in one step.

xxx deputy general manager:

1, the rectification plan formulated by the three gold mines, the three gold mines against the acceptance criteria for the resumption of work, item by item listed in the detailed rectification plan, the requirement to make a rectification schedule, the implementation of the person responsible for the implementation of the rectification of the time to ensure that the rectification of the quality of the first time through the acceptance of the xx. xx day by noon to complete.

2, basic information standards: the construction data should be complete, each inspection should have a detailed record, the functional departments against the resumption of acceptance criteria, article by article review, unified three gold mine rectification standards, and issued to the production unit, do a good job of service supervision.

3, staff training: through training, lighten the atmosphere.

4, rectification of each group to have a competent responsible person.

Minutes of the work meeting 3

In order to implement the spirit of the Standing Committee of the county party committee on the proper solution to the mountain copper mine sewage, drainage-related issues, the morning of July 12, 2007, the county party committee, secretary of the Discipline Inspection Commission Sun Jinxing, the county party committee, deputy mayor of the county party committee, Lu Jianwang candidate to go to the mountain copper mine on its sewage, drainage facilities related to the situation of the field to check, and in the meeting room of the mountain copper mine to solve the problem of enterprise sewage, drainage-related issues held Coordination meeting.

The meeting listened to the relevant units of the mountain copper mine sewage, drainage report. The meeting pointed out that the mountain copper mine is the county's pillar enterprises, for the county's economic and social development has made outstanding contributions. In order to ensure the normal production of the enterprise, the meeting determined:

1, the township, lake aquaculture farms and relevant departments to fully support the development of the enterprise, to strengthen the management of the people in the area, to ensure that no incidents affecting the normal production of the enterprise, if any problems, should be educated to reflect through the normal channels;

2, for the unauthorized blocking of the mountain copper mine drainage facilities in the lake aquaculture on July 9 Contractors, in view of the mountain copper mine has understood, not to pursue its responsibility; lake aquaculture farms to pay close attention to the movements of farming contractors, found that the situation should be stopped in a timely manner, such as the recurrence of similar incidents, the county public security departments will be severely cracked down on; please the mountain copper mine has been damaged facilities for repair, to ensure timely and normal drainage;

3, lake aquaculture farms, the township should be based on the county environmental protection bureau "on mountain Copper mine around the water quality monitoring results of the report" (county environmental protection font size) and the city environmental monitoring station on the three sampling points of the water quality test report (environmental measurement word No.), to the breeding contractors and local residents to do a good job of explaining and coordinating work, informing its current mine outside the drainage in line with the environmental quality of surface water class III standards, does not affect the aquaculture and the daily life of the masses;

4, the mountain copper mine in the production process, to effectively do a good job of environmental protection, according to the relevant environmental protection requirements for sewage treatment, has been abandoned drainage facilities should be properly handled, try to eliminate the misunderstanding of local residents;

5, to establish a sound long-term coordination mechanism, mountain copper mine, lake aquaculture farms, townships should be clear in charge of the leader and contact person, regular meetings, effective docking, problems should be communicated with each other, timely Mutual information to ensure that the problem can be effectively resolved at the first time, if there is a problem that really needs to be coordinated and resolved by the county party committee and government, it can be reported to the county party committee and government leaders in charge first.

Work meeting minutes 4

Meeting place: Hudong Technical School, fourth floor conference room

Meeting time: 10:00 a.m. on x, x, x, 20xx

Attendance: Attached to the meeting sign-in sheet

Meeting topic: Hudong Technical School, the west side of the wall affecting the Central Line sidewalk part of the demolition matters

Hudong Technical School, the west side of the wall K0+176.348 ~ K0+176.348 to the west side of the wall. 176.348~K0+223.89 (south part of the starting point of the center ring) about 47.5m affects the center ring line Pudong section of the new project 1 standard K0+176.348~K0+223.89 section of the sidewalk, in order to ensure that the construction of the center ring line is carried out normally, all parties have carried out a number of communication; Hudong Technical School said that they fully support the construction of the center ring line, and ask the center ring command of the Hudong technical school local facilities to improve, the meeting clarified the following:

The west side of Hudong Technical School wall affecting the center ring line part of the demolition and construction issues. Improvement, the meeting made clear the following:

1, K0 +176.348 ~ K0 +223.89 section of the fence inside to the playground side of the green first relocation, to be implemented after the completion of the new fence and then replanted.

2, the removal of the inner side of the wall street lamp poles, bars and other facilities, to be reinstalled after the completion of the construction, street lamp line resurfacing; bars due to the local deformation, need to be replaced.

3, before the removal of the wall, and the school area with color steel sandwich panel enclosure, height of 2.5m; the new wall along the road to build the edge of the implementation; due to the middle of the ring road for the downhill section, and with the school in-situ ground (4.4m) height difference is large, the height of the wall according to the trapezoidal set up to ensure that the height of the wall is greater than the minimum height of 2.0m from the sidewalk, the wall is set up on the upper part of a 1.5m-high green security net And there are reinforcement measures; fence foundation using plain concrete bar foundation.

4, the demolition section to Dibaibang bridge section (K0 +223.89 ~ K0 +252.80) wall with the new east Dibaibang bridge platform due to the large difference in height of the sidewalk, in order to ensure the safety of the school district, need to be raised on the height of about 2m; the new wall after the implementation of the completion of the need to set up a 1.5m-high green anti-theft fence.

5, before the removal of the wall needs to be re-arranged near the wall side rainwater pipe (north-south direction).

6, Commander's Terrace status quo wall marble need to be replaced, Commander's Terrace floor original granite need to be replaced and re-pasted.

7, the commanding officer to the school janitor (44m) to set up a 380V cable line, and in the commanding officer position to set up an outdoor power box, with power sockets 2.

8, school long jump pit south end with green (holly) closed.

9, the Hudong Technical School east side of the fence repair, according to the total wall 40% of the stucco repair, and all the white exterior waterproof coating two.

10, the above projects are commissioned by the Pudong Engineering and Construction Management Co., Ltd. to Shanghai Tunnel Engineering Co., Ltd. in the Central Ring Road, Pudong section of the new construction of the project 1 standard project department implementation.

Work Conference Minutes 5

November 7, 20xx at 2:30 pm, the city health bureau party secretary, director of the xx in the city people's hospital Qianshi new district office building, fifth floor conference room hosted the city people's hospital relocation work conference. Participating in the meeting were the Municipal Health Bureau, the main person in charge of the Municipal People's Hospital and the relevant departments and offices in charge. The meeting listened to the city people's hospital relocation work progress report, and before and after the relocation of the main work of the study and discussion and the corresponding deployment arrangements, the main contents of the meeting are summarized as follows:

The meeting that the city's people's hospital leadership team collective in the new area of the hospital construction and hospital relocation work is very good implementation of the municipal party committee, the municipal government's instructions and requirements to overcome the difficulties and creativity. Work, with remarkable results. Municipal People's Hospital's relocation of the overall program, the implementation of the program and specific scheduling of personnel arrangements, such as the development of a detailed and reasonable, thoughtful, the current constraints on the overall relocation of the work progress of the bottleneck research and analysis in place, put forward the corresponding solution is practicable, the relocation of the preliminary preparatory work is very good, and has achieved a stage of victory.

The meeting decided:

First, seriously implement the relocation of the overall program has been developed. Specific implementation of the program can make small adjustments to improve the staff scheduling, division of labor and other aspects should not make major changes.

Second, the relocation work to further clarify the division of labor, clarify the responsibilities. Relocation of the various organizations and responsibilities to further clarify the division of the area and work task arrangements to further unify and coordinate; to subregional, multi-level relocation of the specific matters involved in the grinding, testing and rehearsals, involving the medical process and other professional and related test rehearsals should be carried out several times to ensure the safety of the orderly; in the near relocation of the last

period should be held a hospital-wide relocation Mobilization meeting, inform the situation of the exercises, sum up the lessons learned, and further on the specific tasks to sort out clear, division of labor to the person, the responsibility to the person, and signed the corresponding certificate of responsibility at different levels; related to the supply of natural gas, oxygen supply, information technology networks, and other key bottlenecks impediments and elevators, electricity and other work related to the safety of the work, we must implement the functions of the orderly scheduling, to focus on the breakthroughs; the relocation of the After the specific date is determined, a relocation work scheduling meeting to be held in the government, inviting the armed police, public security, traffic police and urban management and law enforcement and other functional departments to participate in order to get the widest range of various sectors of strong support.

Third, on the basis of ensuring quality, ensuring safety and ensuring normal operation, the relocation time is determined as November 22nd to 26th. An opening ceremony will be held before December 25th.

The meeting requested that the Municipal Health Bureau to play the role of health administration, full support and cooperation with the city hospitals before and after the relocation of the work, good service as a good adviser. In the hospital within the organization, the number of leadership, staffing and funding and other security issues, the hospital side should be systematically clean up the provisions of the policy, clear their own needs, the formation of a written report, the main leadership of the Municipal Health Bureau is responsible for taking the lead in contact with the main leaders of the government and the relevant departments to assist in resolving the issue. Hospital posting contradictions need to further study the policy, to find out the province and other institutions related to the situation, specifically by the Municipal Health Bureau of Personnel Section to assist in the articulation and communication. Involving the Huayuan County People's Hospital doctors reported through the personnel relations after the processing of the issue, by the Municipal Health Bureau is responsible for the medical work of the leader in charge is responsible for contacting the Huayuan County Health Bureau and the government departments to negotiate a solution, at the same time, the relevant functions of the Department of Health section to study the personnel and registration of doctors and other related policies and regulations to put forward the contingency measures.

The meeting requested that the Municipal Health Bureau, the Municipal People's Hospital and other relevant units should be relocated before and after the stability and safety of production work as a top priority to ensure that the organization to cherish the trust, to cherish the current timing of the work, and to cherish the cadres and masses from all walks of life. Care support, further improve understanding, unity of thought, go all out to do a good job in the relocation of the city people's hospital.

Participants:

Attendees:

xx x month x day (City Health Bureau Office)

City Health Bureau, City People's Hospital, the relevant departments responsible for the

Work Conference Minutes 6

On the afternoon of June 15, the town demolition and resettlement of the work of the leading group held a meeting in the town of the Party Committee of the third floor conference room, study and discuss the demolition and resettlement of non-residential conditions and methods. The main spirit of the meeting is summarized as follows:

First, the meeting that the town of residential demolition and resettlement has been issued by the district policy opinions and meet the actual operation of the town, but the demolition and relocation of non-residential has been the main compensation in the resettlement has not been a special opinion as a unified basis, in view of the future of the town of non-residential demolition and relocation of the actual situation of the increasing number of the development of relevant Resettlement operation is imperative.

Second, the meeting clarified the town non-residential resettlement approach to the applicable conditions and specific content.

Northeastern Township, non-residential demolition and resettlement measures applicable conditions:

1, the nature of the demolished enterprise land should be state-owned or collective land transfer, and has been the enterprise buyout;

2, the demolished enterprise is large, good prospects for development;

3, the demolished enterprise with the township and village signed an agreement for the collective transfer of land, but did not obtain the transfer of land certificates, except for this case. The land certificate is not included.

Resettlement method operation rules:

1, resettlement location. Meet the resettlement conditions of the demolished enterprises into the town industrial zone unified resettlement.

2, resettlement area and land price. Determination of the land area of the demolished enterprises to build new plants: the original land nature of state-owned land, to be 1:1 replacement; the original land nature of the collective transfer of land, should pay the difference in price of the collective transfer of land into state-owned land for the land, 70,000 / mu; the new use of the land area in principle, can be increased by 10% on the basis of the original area, but shall not exceed 30%, the new area of the basic protection of the price of 192,000 / mu Calculation. The demolished enterprises to build new plants, the floor area is not limited.

3. Determination of common area in the park. The road in the park is bounded by the center line, and half of it is counted as the common area of the enterprises along the line.

4, the determination of the park construction fees. Demolished enterprises in the park land use area more than the original area, the new part should pay the relevant construction fees.

5. The funds for the construction of infrastructure in the park shall be borne by the government.

The meeting was chaired by: Zhang Jie

Attendance: Zhang Jie, Yuan Zhenyu, Ding Lei, Xie Xuefeng, Gu Xiaodong, Zhang Xueping

Yang Jianzhong, Xu Guoqing, over the Yudong, Gu Fengyan

Reading and signing: Zhang Jie

Verification: Gu Fengyan

Drafting: Shen Xin

Records: Shen Xin

Northeast Tang Township, the demolition of the relocation of work

The main agenda of the meeting: construction units and construction units and supervision units were reported on the current progress of construction, analysis of the main problems, the development of the next step in the construction plan, a clear project progress, quality, safety and other requirements, the meeting is determined to be the following summary of the relevant matters:

First, the meeting analyzed the main reasons for the lagging of the progress of the project:

First, the construction unit did not according to the actual workload into the personnel, machinery, equipment and organization of construction, construction technology is weak and management is not in place;

Second, the construction site coordination is not in place;

Second, the meeting decided:

(1) the construction unit should be invested in meeting the construction progress requirements of manpower, materials and equipment. Construction progress requirements of manpower, material and financial resources and mechanical equipment, increase construction technology, strengthen construction management, to ensure project quality, progress and safety.

(2) the construction unit in accordance with the principle of scheduling, to achieve node control, and to develop a scientific and reasonable, practical engineering construction organization plan and engineering emergency flood plan, and will plan to report to the supervisory review on xx months xx days ago to the construction unit.

(3) requires the supervision unit to strengthen the site supervision, strengthen the project progress, quality and safety management, and actively coordinate the relationship between the participating units to ensure the quality and progress of construction;

(4) The meeting emphasized that the reservoir risk reduction and strengthening project should ensure that the end of 20xxxx to complete the key processes of construction for the reservoirs that are not in the field must be in the field on the day before the xx month, to ensure that reservoirs have the flood, the incoming floods, and to ensure that the reservoirs are ready for the floods, the incoming floods, the incoming floods, the flooding of the reservoirs, the flooding of the reservoirs. Ensure that the reservoir has a flood, the next year, water storage irrigation, breeding and other conditions, otherwise all the consequences of the construction party to bear;

(5) The construction unit should do a good job of hidden works to notify the relevant units to acceptance before entering the next process of construction, to ensure the completion of the project on time and quality.

(6) safe and civilized construction: the implementation of the project department, public signs, as well as construction personnel insurance; summer construction to do a good job to prevent heat stroke;

(7) for the main project in the xx months before the completion of the project, the construction unit will give the appropriate incentives;