With the continuous improvement of laws and regulations, people pay more and more attention to the contract, more and more scenes and occasions need to use the contract, the contract coordinates the relationship between people and people, people and things. So do you know how to write a formal contract? The following is my manual labor simple version of the contract model (general 6), welcome to read and collect.
Manual labor simple version of the contract 1Party A:
Party B:
______ company (hereinafter referred to as Party A) and ______ company (hereinafter referred to as Party B) the two sides through friendly consultation, in accordance with the "Chinese People's **** and the State of the contract law" and other relevant provisions of the cooperation of the labor to reach an agreement on labor cooperation, agreed to sign this contract.
Article 1, General Provisions
1, Party B provides _____ license plate driver services for Party A's _______ and collects service fees.
2, unless otherwise agreed by both parties, any correspondence between Party A and Party B related to this contract, as well as the settlement, are used and can only be used in this contract, A and B specified address and bank account number.
3, this contract, either party's name, legal address, remitter, payee, bank account, account number changes, the change of a party should be at least fifteen days in advance notice to the other party. The written notice by the official seal and signed by the authorized representative of this contract is valid, such as Party B name change, but also need to provide a copy of the new business license and business name change approval notice.
Article 2, the rights and obligations of both parties
1, Party B's service driver in the service process should be good attitude. If Party B's driver has service problems in the service process, he should bear the responsibility of breach of contract in accordance with the Supplementary Agreement on Labor Cooperation. Party A has the right to ask Party B to correct, Party B can no longer meet the requirements, Party A has the right to terminate this contract, and has the right to ask Party B to compensate for the losses caused to Party A as a result.
2. Party B shall sign a formal employment agreement with the dispatched driver and be responsible for the dispatched driver's salary, welfare, social insurance (including pension, medical care, work injury), personal accident insurance, taxation, living arrangements (such as food, housing, transportation arrangements, and the handling of various types of documents) and other matters, for the hiring of the driver of Party A's services, transfer or dismissal of all economic and legal responsibility. All economic and legal responsibilities arising from the employment, transfer or dismissal of Party B's service drivers shall be borne by Party B. Party B driver in Party A service period, can not work properly, Party A will return to Party B to deal with.
3, Party B's service drivers who are sick, can not provide services for reasons, must ask Party A for leave in advance, during the leave Party B should provide the appropriate driver instead of, and can not be affected by this to provide services for Party A, otherwise Party A has the right to recover the loss from Party B. If Party B fails to provide services to Party A during the vacation period, Party A is exempted from paying the service fee for the corresponding days.
4, Party B service driver shall not use the car for any purpose other than Party A's work, and the vehicle parking place shall be decided by Party A.
5, Party B's service driver driving Party A's vehicle traffic accidents, all related matters are handled by Party A and Party B in accordance with the national government departments of the responsibility of the appraisal certificate produced by the insurance and the relevant provisions of national law to coordinate, responsible for compensation of the relevant costs. Party B is responsible for handling the violation of rules and regulations of Party B's service drivers. If Party B's driver is disabled or killed in a responsible traffic accident, Party A will be responsible for all other after-compensation after settling the claim with the insurance company insuring the vehicle. Party A has the right to request Party B to replace the driver of Party B's service who is mainly responsible for major or major traffic accidents, or who has repeatedly been involved in general traffic accidents.
6. Party A shall insure the vehicle with third party liability insurance (_____ million yuan), driver and passenger seat insurance (_____ million yuan/per seat), etc., and the insurance period includes all the service period of the contract.
7. Party A guarantees that the vehicle is in good technical condition and has relevant and valid driving license, surcharge certificate, insurance card, vehicle and vessel use tax certificate and state road maintenance fee bill and other documents. If Party A lacks the aforementioned documents, Party B has the right to terminate the contract.
8. Party A is responsible for the repair and maintenance of the vehicle, and bear the relevant costs. If the car breaks down, Party B's driver should be designated by Party A's designated repair shop, follow the car to supervise the maintenance. Maintenance applications must be reported in advance to Party A's Vehicle Management Section for review and approval by Party A's Vehicle Management Section to Party A's designated repair manufacturers for repair, out of the car outside of the temporary small repairs to be declared Party A's Vehicle Management Section for approval. If the driver leaves his/her post during the repair period, Party A is exempted from paying the service fee for the corresponding days. In case of car failure caused by Party B driver, Party B shall compensate Party A for the loss, and Party A has the right to deduct the compensation amount directly from the service fee.
9, Party B service driver for Party A to provide services during the period, involving Party A related to the content of the work and other information has a duty of confidentiality, during the period of cooperation, the service driver to sign a confidentiality agreement with the Party.
Article 3, the service fee and settlement
1, Party B service driver monthly service fee for the whole of the RMB ______, lowercase: _____ whole (Party A arranges for Party B's driver to rest time of not less than 4 days per month, the specific rest time can be agreed upon by the two sides), in the performance of this contract, such as the national wage policy has undergone a major change so that the two sides are still according to the provisions of the contract to pay the service fee to one party. During the period of performance of this contract, if it is unfair to one party to pay the service fee according to the provisions of this contract due to significant changes in the national wage policy, the two parties shall adjust the amount of the service fee by negotiation in accordance with the principle of fairness and pay the service fee for the remaining period of the contract according to the adjusted service fee. The service fee of the contract includes:
(1) The labor fee for the driver's normal working hours and overtime labor fee.
(2) Party B's management fee.
(3) Communication fee for the service driver.
2. The following expenses are not included in the above service fee, and Party A will pay them separately according to the qualified bills provided by Party B:
(1) Road and bridge tolls.
(2) Fuel cost.
(3) Parking fee.
(4) Car wash fee.
(5) Maintenance of the car, normal mechanical damage repair and annual audit costs.
(6) Vehicle annual taxes, fees and charges.
(7) the driver out of town on business travel on the day of the long-distance business trip accommodation subsidies (accommodation by the driver, the subsidy standard is 130 yuan / day, the company provides accommodation, the subsidy standard is 30 yuan / day).
3, "May Day", "November" and the Chinese New Year in the month, if Party A needs Party B's service driver to provide services, the service cost is paid according to the actual number of days of service, the service fee is 135 yuan / day.
4. For monthly service fee, Party B shall issue a qualified invoice to Party A before the 5th of the next month, and Party A shall pay the previous month's payment within 10 working days from the date of receipt of the invoice.
5. Monthly service fee shall be paid to the following account designated by Party B, and Party B shall withhold and pay on behalf of the service driver all taxes incurred due to the provision of services under this contract:
Party B's bank account:
Party B's full name:
Account Number:
Article 4. Liability for breach of contract
1. If Party A fails to pay the service fee on time. Party B has the right to request Party A to settle the payment in time, if Party A postpones the payment for more than 15 days, Party B has the right to stop the service, but should notify Party A three days in advance; Party A will pay three ten thousandths of the amount owed as liquidated damages for one day's late payment every day. If Party A does not fulfill the payment obligation within seven days after Party B's notification, Party B has the right to terminate this contract and reserve the right to pursue legal rights and interests.
2, Party B service driver, must comply with traffic rules, due to violation of traffic rules, resulting in. Party B is responsible for the fines and responsibilities.
3, in the service period, such as vehicles in the parking lot designated by Party A was stolen, and Party B has nothing to do (except for the driver to commit crimes or joint crimes with the driver), such as Party B's driver privately use the car caused by the loss or theft of the vehicle, Party B should be compensated for the loss of Party A's vehicle and all the losses of the parking operation.
4. In Party A's factory or office area, Party B's driver should respect Party A's relevant regulations, and shall not affect Party A's normal working order, or Party A shall have the right to demand compensation for damages.
Article 5, change and termination of the agreement
1, after the expiration of the contract, Party A needs Party B to continue to provide driver services, must be seven days in advance to negotiate with Party B to re-sign the contract of cooperation in the labor service, otherwise, Party B from the date of expiration of no longer provide driver services.
2, Party B terminate the contract in advance, you need to put forward to Party A seven days in advance.
3. During the period of labor cooperation, if Party A needs to terminate the contract in advance due to the reason, it should propose to Party B seven days in advance.
4. Party B has the right to terminate the contract if Party A closes down, goes bankrupt or loses economic capacity.
5, Party B service driver serious traffic accidents, serious disruption of Party A's work order or violation of state laws and regulations, Party A has the right to terminate the contract, and require Party B to compensate for the corresponding losses.
6. Party B has the right to terminate the contract in case of deterioration of business conditions, loss of credibility or other matters affecting its provision of driver services to Party A, including but not limited to failure to pay salaries to service drivers in a timely manner.
Article 6, Others
1. All outstanding matters relating to this contract and all disputes arising out of this contract shall be resolved through friendly consultation between the two parties, and if they cannot be resolved through consultation, they shall be submitted to ______ Arbitration Commission for arbitration.
2, any modification, supplement or change of this contract shall be in writing signed and sealed by authorized representatives of both parties as part of this contract.
3. This contract shall come into force after being signed and sealed by the authorized representatives of both parties. This contract is in one _____ copy, the A and B parties are each executed ____ copies, each with the same legal effect.
Party A:
Authorized Representative:
Contact Person:
Tel:
Address:
__________ ______ month ______ day
Party B:
Contact Person:
Tel:
Address.
__________ Year ______ Month ______ Day
Manual Labor Simple Version Contract 2Party A: ________________________
Party B: ________________________
According to the needs of the project, Party A will be "According to the needs of the project, Party A will contract the artificial dug hole pile project to Party B for construction, in accordance with the relevant provisions of the "Economic Contract Law" and "Construction Management Regulations", combined with the actual site, by both parties **** with the consultation In order to clarify the responsibilities, rights and benefits of the relationship, the following terms are formulated, both parties *** with the implementation of compliance.
First, the project name:
Second, the project location:
Third, the content of the contract: the building of all manually dug piles project, ground beam.
Fourth, the contracting method: package work without materials, package toolkit dry fee.
V. Contract price:
1, manually dug piles according to the amount of earth comprehensive unit price per cubic meter ______ dry.
2, pile body steel in cage production and installation per ton ______ yuan package.
3, hole side of the earth yard outside the transfer fee per cubic meter of transfer ______ yuan / m3.
Note: The above prices (in addition to the materials provided by Party A: reinforcing steel, cement, sand, gravel, construction water, electricity costs, mixer borrowed) are included in the following:
① construction of the required retaining wall steel formwork, triangular hanger, winches, pumps and pumping water, Lighting fixtures, cables and other various machinery and equipment tools, steel wellhead an money guardrail.
② daily manually dug piles of earth, according to the Party designated in the building around the border (regardless of the size of the building) within the scope of the centralized vertebrae, to facilitate timely transportation.
③ wall protection and pile concrete pouring, reinforcing steel cage lifting, field rainy day soil layer required for steel sheet padding, joint welding, tying steel, installation in place, (reinforcing steel cage by the Party according to the natural length of the steel production to provide) and other labor, materials, machinery and other costs required.
④ Equipment required for precipitation and treatment of sand flow layer.
⑤ Cost of management of safety production protection.
Sixth, the duration of the requirements: in accordance with the construction drawings of the amount of work (regardless of the diameter of the hole pile size, through the flow of sand layer, how thick, how much groundwater, how much the length of the pile, unforeseen climatic impacts, the difficulty of operation of the well and the site, are included in the negotiation of the duration of the work) *** with the negotiation is as follows:
1, the amount of work of the hole pile by the A party, the supervisor, the final acceptance by the construction unit of the amount of the party to be subject to.
2, the total manually dug holes days to complete, of which the block days to complete the time from the hole pile samples put good start counting.
3, such as more than the above period, each wrong day Party B fine of yuan, one day in advance Party A award to Party B yuan.
7, quality requirements: in accordance with the flag construction drawings, construction specifications, operating procedures, quality inspection and evaluation standards for the organization of construction, manually dug hole piles into the hole quality assurance 100% qualified, but must also be mandatory to do the following:
1, concrete retaining wall within the permissible deviation of the diameter of the pile +50 mm.
2. The deviation of the centerline of the first section of ground well circle from the designed (specified) axis shall not be more than 20mm.
3, the upper and lower sections of concrete retaining wall lap length shall not be less than 50 mm.
4, the permissible deviation of verticality is less than 0.5%.
5. Allowable deviation of pile position:
A, 1~3, single-row pile foundation perpendicular to the centerline direction and the side piles of the group pile foundation 50mm;
B, 150mm of the middle piles in the centerline direction of the strip pile foundation and the group pile foundation.
6. Each section of retaining wall shall be constructed continuously on the same day.
7, the removal of retaining wall template is appropriate after 24 hours.
8, found that the retaining wall has honeycomb, water leakage phenomenon, should be timely reinforcement to prevent accidents.
8, settlement basis: pile diameter according to the design drawings show the size, pile length to the site hidden acceptance of the actual length calculation. (Quotas stipulated in the artificial dug hole filled concrete earth water content coefficient can not be calculated).
IX, payment: monthly Party B to meet the requirements of Party A under the conditions of the schedule, the quality of the standard requirements, approved by the functional inspection, the payment is as follows:
① into the hole part of the completion of the volume according to the unit price of 50%;
② expansion of the head part of the completion of the completion of the acceptance of the bottom of the completion of the bottom, and the other according to the unit price of the payment of 70%;
③ reinforcing steel cage hoisting Multi-section joint welding, hoop banding in place, the pile core of its pouring completion of the amount of part of its unit price to pay 85%, the remaining 15% of the pile foundation after acceptance of the final account to pay off (each payment must be audited by the functional departments, the second month before payment must be handed over to the previous month's labor wage table).
According to the sixth paragraph of this contract, according to the requirements of the schedule, according to the section schedule, not completed on time part of the penalty are deducted in the month progress payment.
X. Party A's responsibility:
1, to provide building construction drawings and related design changes.
2, in accordance with the construction progress plan for phased safety technology delivery.
3. Provide axial staking and leveling points and elevations around the building.
4. The distance from the secondary power switch box to the operation site is not more than 50 meters. (The last switch box and the required cable will be provided by Party B).
5. Provide cafeteria meals, workers accommodation and living production lighting, water and electricity and other facilities.
6. If underground obstacles are encountered during construction, Party A will deal with them. If additional items are caused by the non-conformity of the actual conditions of the site and the survey report, Party A and Party B will negotiate separately.
XI, Party B responsibility: (such as incurred costs are included in the contract price of the contract in the fifth paragraph)
1, compliance with the implementation of the state promulgated by the Work Safety Act and the provincial and municipal safety production of the relevant provisions of the establishment of a sound production safety responsibility system; organization of the development of the unit's production safety rules and regulations and operating procedures to ensure that the unit of production safety investment in the effective implementation of the supervisor to follow the inspector safety Production work, if the construction process in the production safety accidents and all economic losses, should bear all the economic and legal responsibility.
2, the contract representative must be on the team construction workers are responsible for production safety in the economic and legal all responsibility for the construction staff for production safety written briefings, especially for new workers to enter the yard of the "three levels of safety education" work, for the important parts and the operation of the easy to produce unsafe factors to be targeted briefings, And do a safety demonstration operation, full-time safety officers strictly fulfill the pre-shift, shift, shift inspection after enthusiastic supervision, stop violations, to prevent accidents.
3, is responsible for organizing the preparation of the construction organization design (program), sent to Party A, the supervision unit validation signature, strictly in accordance with the program and construction drawings, construction specifications, safety and technical procedures for the organization of construction, to ensure that the quality of the project is one hundred percent qualified. If there is a quality problem, Party B should rework to acceptance without compensation, and compensate Party A for all the economic losses caused by this.
4, hole pile construction period must be fixed person positioning Xian responsible for the end of the day (or suspend the operation) wellhead steel guardrail cover protection safety work, is strictly prohibited to cover with iron plate.
5, the organization of the relevant technical personnel in accordance with the drawings provided by the Party to carry out the sampling nail gantry piles, positioning piles, excavation of the hole pile earth, drilling, rock drilling, repairing the rock surface, hanging out of the hole in the soil (rock) thrown out of the well outside the edge of 1.5 meters.
6, responsible for the lighting facilities in the hole pile (within the safe voltage 36V), pumping water in the well, detecting harmful gases, air supply, wall template production, installation and dismantling, production and installation of wall reinforcement, and pouring wall concrete.
7. Cage lifting and installation, shifting, transportation and calibration within the construction site will be undertaken by Party B.
8, wall concrete and pile core concrete pouring, from the artificial ground material mixing, material transportation to each wellhead vibration and other costs. If the pile core concrete is changed to mixing station and pumped to the wellhead, the processing fee will be deducted ______ yuan/m3, and the part of pile core empty hole will be deducted ______ yuan/m3, which will be deducted back by Party A in the settlement.
9, according to the design requirements need to pass through the quicksand layer, no matter how thick, how deep and unforeseen construction operation difficulties arising from the required materials, machinery and labor, and so on all costs are included in the fifth paragraph of this contract.
10, Party A designated to provide cement, wall reinforcement, stone, sand dosage according to the laboratory ratio approved dosage, wall reinforcement according to the processing table approved dosage, more than the dosage of part of the Party A according to the actual deduction back.
11, all management personnel and operation and production personnel should obey the supervision department, Party A's command and supervision, hole piles every day into the depth of the record must be done, and according to the national quality assessment regulations to Party A, check and acceptance, and do a good job of hidden works recognized visa, before the next construction.
12. The safety provisions not mentioned in this contract shall be implemented according to the safety regulations issued by the state.
XII, breach of contract:
1, Party B, such as the quality of construction in the construction can not meet the national construction norms, quality standards, safety production, Party A schedule requirements, Party A has the right to limit the day rectification, more than the time of Party A has the right to terminate the contract, and assume responsibility for all the economic losses caused by the loss and compensation.
2, Party B, if the work stops halfway out of the field, all construction products accepted by the Ministry of acceptance of the project according to the amount of work completed 70% of the settlement, the remaining 30% of the Party as a separate team caused by delays in the construction period and temporary labor increase and other losses.
xiii, this contract in quadruplicate, A and B each of the two copies, signed by both sides of the date of entry into force, for the final accounting will clear the balance after the expiration.
Party A: Party B:
Year Month Day Year Month Day
Manual labor simple version of the contract 3Contractor: ________________ (hereinafter referred to as: Party A)
Contractor: ________________ (hereinafter referred to as: Party B)
In accordance with the "People's Republic of China *** and the State Contract Law", "Chinese People's *** and the State Contract Law", "Chinese People's Republic of China", "Chinese People's Republic of China", "Chinese People's Republic of China", "Chinese People's Republic of China", "Chinese People's Republic of China", "Chinese People's Republic of China", and "Chinese People's Republic of China".
First, Party B contracting scope of work, contracting methods, work content:
1, Party B contracting scope of work:
________________________ ________________________ artificial bored piles within the scope of project design. Quality and quantity guaranteed, complete the task on schedule, and meet the requirements of design and relevant national specifications.
2, Party B contracted manually dug hole pile way and work content:
1) Party B package labor, package auxiliary materials and tools (such as manually dug hole pile churning frame, air compressor and its hoses, pickaxe and secondary box other than the switching box, electrical wires, air supply, etc., pile retaining wall template and support system, stone drilling hole of the tools, etc.);
2) for each manually dug hole pile The soil, stone and slag will be transported to the designated location 2 meters away from the pile hole and stacked;
3) Pile retaining wall reinforcement binding, supporting and dismantling templates;
4) Prepare and finish the work before and after pouring the retaining wall concrete, and ensure that the concrete is vibrated densely;
5) Unconditionally cooperate with the Party A, the owner, the design, the geological survey, the supervisor and the quality supervision unit for self-checking and slot inspection of the finished piles. > Party B:
By the A and B **** with the consultation, in line with the principle of fairness, voluntariness, mutual benefit, Party A voluntarily their own home base (located in the Ma'an relocation street area of about 100m2) to the construction of the B party (Note: only package, not package materials), the special establishment of the contract, the two sides must **** with the observance of the contract.
Project content: (including floor beams)
First, the total height of the house is 7 and a half floors, the structure of the first layer of the frame structure, the first floor height of 6.5 meters, before and after the external wall is well pasted, the internal wall is well powdered canopy water mold fur skin, the second layer of the above is 3 meters, tie wire, nails, wire from the B side to buy, rebar production and installation, masonry, carpentry (including the support of the template materials required), inside and outside the frame and construction channel Safety shed erection (including erection materials), water and electricity installation, mechanical equipment required for this project are responsible by Party B.
Second, during the construction of the project, Party B construction personnel should obey the Party A management personnel command and arrangements for disobedience to the managers, Party A has the right to discharge from the site.
Third, the construction period:
Start date: January, 2012
Completion time: January, 2012
Total construction period: days
Fourth, the quality of the project:
Project quality standards: to achieve the national quality acceptance standards of the current construction projects. Because the quality of the project does not meet the agreed standards, Party B rework until qualified, due to rework costs incurred by Party B itself.
Fifth, the agreement price: calculated according to the floor area, 200 yuan per square meter unit price package (package work is not included, package machinery and equipment, package support mold materials and materials needed to build shelves).
Sixth, the project receipt: calculated according to the actual floor area. Project payment: according to the progress of the project by the Party audit according to the fact, according to the progress of the project 70% payment, the balance of the project and other works are completed after acceptance of a qualified month after a payment. (Except for quality warranty).
VII, in the construction process, the progress of the project is seriously lagging behind, can not meet the requirements of the agreement schedule, (stopping work to wait for materials) Party A for other reasons caused by Party B stopping work, except that Party A will be given a certain amount of economic penalties or have the right to terminate the agreement.
VIII, construction safety: all safety accidents by Party B is solely responsible for, and Party A has nothing to do with, and the quality of construction problems, Party B is responsible for all losses.
IX, construction site cleanliness and health requirements, so the special nature of the project, the project started, Party B should be civilized construction, to keep the construction site clean, smooth roads, to ensure that the construction site and the surrounding environment in line with the relevant provisions of the environmental protection department, due to violations of the provisions of their own reasons, resulting in losses and penalties, Party B is responsible for.
Ten, after the completion of the project, according to the relevant requirements and the quality of the deposit, the amount deducted for the contract price of 2% of the total amount of the quality warranty period of 6 months, the warranty period expired, no quality problems, the amount of the deposit returned
Eleven, the outstanding issues, the A and B **** with the negotiation to solve the problem.
XII, this agreement in duplicate, effective from the date of signature, the expiration of the project quality warranty period, Party A paid off Party B after the project, automatically take effect.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ month ____ day _________ year ____ month ____ Day
Manual labor simple version of the contract 5Contractor (Party A):
Contractor (Party B):
Party B undertakes the construction of Party A's Zhaiba Township gas station house, in accordance with the "Chinese People's **** and the State of the Contract Law", "Chinese People's *** and the State of the Construction Law" and the provisions of the relevant laws and administrative regulations, the two sides in the spirit of equality, voluntariness, the principle of honesty and trustworthiness, after the consensus, the following contract on the project single package labor.
I. Project contracting
The work is not included. Party B undertakes to Zhaiba Town gas station He Li house construction, Party A is responsible for providing the construction of raw materials required.
Second, the scope of the project contract
steel production, the main project, the inner wall powder water, the outer wall tiling, the roof cement mortar leveling, welding, pipeline pre-buried, roof drainage, indoor sewage pipe, external scaffolding, etc.. What is not said, subject to the design and construction drawings and the agreement of both parties.
Third, the quality of the project
Qualified.
Fourth, the duration
From February 20, 2oxx to July 20, 2oxx, the construction period **** 5 months. Work stoppage due to rain and force majeure natural sudden damage will be postponed according to the actual number of days of work stoppage.
V. Quantity of work
Settlement will be made on the basis of the actual quantity of work done.
VI. Contracting price
The contracting price for a single package of work is 155 yuan per square meter.
VII, safety responsibility
Party B must strictly in accordance with the construction of engineering and construction-related safety regulations to organize the construction. Strengthen the safety education of site operators, safety supervision and inspection of the whole process of construction, to eliminate all unsafe hidden dangers. If the casualties and economic losses caused by mismanagement and illegal operation are caused by Party B, Party B will be responsible for them.
VIII, liability for breach of contract
A, B, either party default, at 5% of the total price of the project contract liquidated damages.
IX, payment
The amount of work each layer of completion, according to the amount of work completed by 60% of the total price of the payment of the project, the completion of the project, within ten days to pay all the construction costs.
X. This contract is in duplicate, A, B, each party holds a copy of the two sides, signed by representatives of the two sides and stamped after the entry into force.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ date _________ year ____ month ____ day
Manual Labor Simple Version Contract 6Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the provisions of the "Chinese People's Republic of China*** and the State of China's Economic Contract Law", the "Chinese People's Republic of China*** and the State of China's Construction Law", and the relevant laws and regulations, Party A and Party B, in accordance with the principles of equality, voluntariness, compensation, and good faith. After consultation, party A voluntarily will be located in the construction project single package to party B, on the single package of the project signed the following contract:
a, the project single package way to choose there are two kinds of:
1, the package of the main building, such as the following big foot, inverted ground circle beam, bricklaying, inside and outside of the house under the ground, water and electricity pipes go well, etc. (excluding wires), according to the building area
2, the main body of the package, inverted floor beams, bricklaying, inside and outside the house under the coarse sand, water and electricity pipes, wall paint scraping, wall and floor tiles, according to the floor area, the price of yuan / square meter, capitals: yuan / square meter settlement.
Second, the treaty requirements:
1, Party A is responsible for providing all the raw materials to build the house, water and electricity in place, such as materials are not in place, and the impact of the work period, Party B has the right to extend the work period, if more than three days, Party A to pay the Party B lost wages of 200 yuan / person / day.
2, the use of materials
Party B on the use of materials should be based on the principle of reasonableness, not waste; if the waste exceeds one thousand dollars, Party A has the right to ask Party B for compensation.
3, project quality requirements
Party B must be in accordance with Party A's design requirements and construction drawings for construction, Party A to monitor the use of materials.
4, duration
The project was completed in January to January, the construction period of about days; if Party B's equipment is not in place or slow construction by Party B is responsible for Party A's caretaker costs, if due to natural causes affecting the construction of the Party B, design changes or the amount of large changes in the project, it will be automatically extended.
5, price and payment
The project adopts the cash payment method, according to the completion of the main body of the house layer payment: according to the completion of each layer to pay the total amount of % payment, all the main structure is completed to pay the total amount of money % of the payment, the remaining % for the warranty, a one-time payment within one year.
6, construction safety and responsibility
Party B must be strictly in accordance with the relevant provisions of the construction of the project construction, to strengthen the safety of the site staff education and safety supervision and inspection, due to mismanagement or illegal operation of the losses caused by Party B is responsible for.
7, warranty quality
Party B according to a reasonable and legal single package project within the building warranty for one year.
8, in order to both sides of the peace, must be negotiated between the two sides to buy insurance, according to the price of the house to buy insurance.
9, this agreement has the force of law since the date of signing, Party A and Party B shall not default, if there is a breach of contract, will pay each other ten thousand yuan of liquidated damages.
10, this agreement in triplicate, A and B each party to sign a copy of this contract, the contract is not yet complete, A and B after consultation, sign a supplementary agreement.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Date