The company's typhoon and rainstorm emergency plan model (general 5)
In the weekdays of learning, work and life, there is no guarantee that an emergency will occur, in order to avoid more serious consequences, often according to the specific circumstances of the pre-prepared emergency plan. Then how to prepare an emergency plan? Here is my company for you to organize the typhoon and rainstorm emergency plan model (general 5), just for reference, we take a look at it.
The company's emergency plan against typhoon and rainstorm 1
To implement the Civil Aviation Administration of East China's "on doing a good job of flood and typhoon work notice" spirit and the relevant requirements of the local governments at all levels, combined with the "x airport flood control and typhoon rescue emergency plan".
This plan is used in conjunction with the "x Airport Flood and Typhoon Emergency Plan".
First, the principle of work
In accordance with the typhoon before the arrival of the "prevention" based on the arrival of the typhoon to "avoid" based on the typhoon after the typhoon to "save" the principle, in accordance with the principle of "prevention" based on the arrival of the typhoon to "avoid" based on the typhoon after the typhoon to "save".
In accordance with the principle of "prevention" before the arrival of the typhoon to "avoid" the main, after the typhoon to "save" the main principle, organized to carry out a good job to prevent the typhoon frontal attack of emergency response.
Second, the organization
x airport to prevent the typhoon frontal attack of the emergency response work in the x airport flood control and typhoon rescue headquarters under the unified leadership.
Third, the duties of each department
When the typhoon received a warning notice of the attack, in the x airport flood and typhoon rescue headquarters under the unified leadership of the departments to act quickly, in accordance with their respective duties, to do a good job of all the "prevention", "Avoid", "save" the preparation and implementation of the work. The duties of each department are as follows:
1, the airport office: after receiving the typhoon attack warning notice, timely notification of the company's leadership and the airport departments. After consulting the company leadership agreed, start the plan, arrange personnel on duty, assume x airport flood and typhoon rescue headquarters office duties.
2, the scene command center: after receiving the typhoon attack warning and start the plan notice, in a timely manner, in conjunction with the airport construction management office, aircraft security department and security checkpoints, to do a good job of parked aircraft, ramp facilities and equipment of the tie-ups, reinforcement or removal of the work, and timely report the situation to the x Airport Flood and Typhoon Emergency Response Command Office.
3, navigation management center: after receiving the warning notice of the typhoon attack, to do a good job of pre-arrival flights to prepare for the landing and the presence of flights to transfer to the liaison matters; navigation station site of the wind in addition to the work of drainage and reinforcement; to do a good job of emergency communication security; in accordance with the requirements of the Bureau of the implementation of the airport air traffic control to prevent the positive attack of the typhoon plan content.
4, aircraft security: after receiving the typhoon attack warning notice, in accordance with the requirements of the "aircraft security division of the wind damage emergency plan", tied up parked aircraft, special vehicles should be stored in the warehouse, can not be stored in the warehouse of special vehicles should be far away from tied up aircraft, parked in the leeward side, to set up a good brakes and add the wheel block. Equipment and facilities on the apron should also take windproof measures to prevent collision cones into the warehouse, traction poles and work ladders should be stored or tied to prevent the wind from blowing and damaging other facilities. Strengthen the staff on duty and keep communications open.
5, the airport construction management: after receiving the typhoon attack warning notice, to strengthen the protection of the power supply system, make good preparations for power repair, to ensure that the power supply is normal. Equipment and facilities on the apron to take windproof measures. Immediately after the gale, inspect the flight area field paths and lighting facilities to prepare for the opening of the airport.
6, security checkpoints: after receiving the warning notice of typhoon attack, do a good job of corridor bridge reinforcement tethered to prevent accidents.
7, cargo center: after receiving the warning notice of typhoon attack, the cargo warehouse outside the cargo equipment and facilities to take windproof measures, the cargo equipment and facilities on the apron transferred to the cargo warehouse.
8, the airport public security bureau: after receiving the warning notice of the typhoon attack, timely fire vehicles and air defense guards all vehicles into the warehouse or parked in the leeward place, to set the brakes and add wheel block. All the police are in a state of readiness, ready to wait for x airport flood control and typhoon rescue headquarters to participate in rescue and relief work.
9, other departments: according to the "x airport flood control Taiwan rescue emergency plan," the duty requirements, standby duty, to maintain smooth communication.
Four, work requirements
1, the responsibility in place, a clear division of labor. Airport departments can be based on the "x airport flood control and rescue emergency plan" and "x airport to prevent the front of the typhoon emergency plan" to develop the implementation of departmental rules, a clear responsibility and specific person in charge of the plan to identify the various tasks of the typhoon break down and implement the specific responsibility, the formation of a horizontal to the end of the work of the network and the flexible and efficient liaison and response mechanism.
2, well-prepared, strong measures. All departments should organize experienced and competent personnel to respond to emergencies according to the anti-typhoon plan. When a strong typhoon strikes the airport head-on or affects the airport, emergency personnel should be assembled at the specified time to be ready for battle, emergency supplies, equipment, transportation tools, etc. arranged to the front line in order to emergency call. Promptly report to the municipal emergency office, contact the socialized reserves of emergency supplies, equipment and tools, etc., to prepare for emergencies.
3, strengthen the alert, timely disposal. Flood and typhoon rescue headquarters office to arrange for personnel to grasp and develop the dynamics of the flood situation, encountered over the alert, abnormal or dangerous situation timely report, and seize the organization of evacuation, repair, reinforcement, encountered in emergency situations, in the report of the superiors at the same time, should take the initiative to take emergency measures, seize the favorable opportunity to implement the emergency disposal, eliminating hidden dangers.
4, emergency duty, communication. After receiving the warning notice of the typhoon attack, the flood control and typhoon rescue headquarters office and departments to implement 24-hour duty system, to keep the information flowing, the head of each department and the department in charge of typhoon prevention work cell phone open around the clock, the whole tracking rain, water, wind, disaster and secondary disasters, timely consultation, and according to different situations to start the relevant emergency procedures.
V. Appendix
1, this plan by the airport company is responsible for the interpretation and implementation of the organization. And according to the actual situation of changes in a timely manner revised.
2, this plan is implemented since the date of publication.
The company's emergency plan against typhoons and rainstorms 2
I. General:
1, the preparation of the purpose
In order to effectively do a good job in defending against typhoons, timely disposal of typhoons due to the various disasters brought about by the maximum possible reduction of my construction site of the loss of all kinds of maintenance of normal construction, to ensure the smooth progress of the project.
2, the scope of application
This plan applies to the construction of this section of the scope of typhoon disaster prevention and emergency response.
3, the principle of work
Typhoon disaster according to the construction area to implement local management, the main disposal of the functional departments and construction teams, and the implementation of the functional departments corresponding to the construction team responsibility system. Each functional department actively support and guide, supervise the corresponding construction team's emergency disposal work. The prevention of typhoon disaster should be put in the prominent link, and all the preventive work should be done seriously. Seriously analyze the typhoon may cause gusty winds and rainfall, once the danger occurs, should respond quickly and promptly start this emergency plan, organize personnel and forces to do their best to rescue and relief work.
4, the focus of work
(1) the pit excavation construction site of waterproofing, anti-pit wall collapse and rolling stone, etc.;
(2) construction road landslides, avalanches, and other disasters that may cause accidents prevention;
(3) temporary construction site and construction team stationed at the site of the transfer of personnel and equipment before the disaster comes;
(4) the construction sites
(5) vertical transportation equipment, scaffolding, construction power safety measures;
(6) the construction site and the resident in the period of high winds, heavy rain life security;
(7) typhoon, heavy rain weather forecast, prediction and early warning, in a timely manner, to the construction team, the construction site to release typhoon warning information.
Second, flood typhoon disaster leading group:
The project set up a flood and typhoon disaster leading group, the implementation of unified command, sub-departmental counterparts of the construction team to be specifically responsible.
Leading group leader:
Deputy leader:
Members:
Third, prevention and early warning mechanism:
1, typhoon and other disaster monitoring
By the Ministry of the project team responsible for the safety of typhoons, rainstorms, storms and mountainous disaster monitoring and information collection, in advance of understanding of the weather, timely summary of the construction site foundation surface.
2, the construction site safety inspection
adhere to the construction site safety inspection, the implementation of wind and flood control measures as the focus of the inspection work, timely understanding of the relevant information, the possible hazards caused by the basement, the road in advance to arrange for personnel to deal with, to avoid accidents caused by disasters.
3, the construction site of the implementation of the responsibility of the early-warning staff
designate the construction site of the part-time safety officer at the same time for the disaster early-warning staff, is mainly responsible for the collection of information on the construction site dynamics, reporting and the leading group of the release of the instructions of the briefing. Assist the construction team leader to do a good job in the implementation of disaster prevention measures and disaster command work.
4, disaster early warning mechanism
safety group to establish the weather conditions, the construction site conditions of the monitoring system, the implementation of information to obtain measures, adhere to the daily inspection system, during the rainfall, encrypted observation inspections, once found signs of danger, the immediate issuance of an alarm, the transfer of personnel and equipment, and reported to the project leading group.
Four, emergency response:
The project department leading group of the overall command, all members of the participation, and coordination of the relevant departments to participate.
The disaster monitoring department analyzes the development trend of the typhoon according to the weather forecast, releases the rainfall and wind forecast, and puts forward the defense goal to report to the leading group in time. According to the report, the leading group to clarify the defense objectives and priorities, issued the order to transfer people, and announced into the emergency flood control and wind prevention period, start the disaster prevention plan, to the disaster area to send people to guide the work, organize and direct the rescue and relief work, and timely report to the relevant departments of the higher levels of the relevant situation, if necessary, reported to the higher level of coordination of the deployment of medical and living materials assistance.
Fifth, rescue and relief:
After the typhoon landed or seriously affected, the leading group of disaster prevention and relief meeting held in a timely manner, the deployment of rescue and relief work. Organize various personnel to the scene of the disaster, guide the rescue and relief, fully committed to the rescue and relief work.
(1) group leader in time to grasp the summary of the disaster, coordination of rescue and relief work, is responsible for the deployment of disaster prevention materials, and with the relevant personnel to do a good job of disaster prevention and evaluation, and do a good job to the construction command and supervision of the Department of the report.
(2) members of the team in accordance with their respective responsibilities, the organization of post-disaster recovery of materials, equipment and other supplies, priority arrangements for the construction personnel stationed in the supply of living supplies.
(3) the construction team on the damaged construction site, timely development of repair plans, and organize forces to repair as soon as possible.
(4) The leading group contacted the local health department, organizing forces to actively rescue the sick and injured people, while cooperating with government agencies to do a good job of quarantine and epidemic prevention in the disaster area, to prevent the epidemic.
(5) the construction team to organize forces to repair the damaged roads and communications and other facilities to do a good job after the disaster production self-help work.
(6) logistics personnel to do a good job in the management of materials issued to ensure that the supply of necessities of life.
(7) Contact the insurance department to do a good job of claims.
(8) After the typhoon, each construction team and department should report the disaster damage to the leading group in time. After the disaster, the leading group should summarize the lessons learned from the flood, disaster, and disaster resistance, and submit a written report to the project command and supervision department.
(9) When the typhoon and the occurrence of disasters are effectively controlled, the leading group can be based on the information summarized, announced the end of the emergency.
Six, emergency security:
1, rescue team security
I project within the scope of all construction personnel have the obligation to participate in the typhoon and disaster prevention. Each construction team to lead and safety officer as the backbone, disaster should be organized when all personnel to participate in disaster relief work.
2, material security
Materials and logistics departments should reserve the necessary anti-Taiwan rescue materials for emergency use in case of major disasters.
3, financial security
The office to do a good job in the implementation of rescue and relief funds, when the disaster occurs, according to the instructions of the leadership team, the distribution of funds and distribution work.
4, communication and information security
Communication links to cell phones and hand-held telegraphs are the main, public telephone network failures, timely start the application system of disaster prevention and telegraphs, the use of fixed-channel contact after the notification, to ensure that the information channel is unimpeded.
5, health care security
The leading group contacted the local health department is responsible for the affected area of the health epidemic prevention and medical care, prevention of disease epidemics, immunization and disinfection of public **** place.
6. Evaluation of typhoon prevention and relief work
After each typhoon, the leading group should summarize, analyze, and evaluate qualitatively and quantitatively all aspects and links of typhoon prevention and relief work. Summarize the experience, identify problems, and further improve the work of typhoon prevention and response.
This plan by the project department "flood and typhoon disaster leading group" is responsible for interpretation.
This plan will be implemented from now on.
The company's emergency plan against typhoons and rainstorms3
In order to do a good job of typhoon prevention, the "Grand Hotel Typhoon Emergency Response Plan" is re-revised and issued to all hotels to comply with the implementation.
First, the organization and responsibilities
The hotel set up a flood and typhoon emergency command, the typhoon comes when the command of the various organizations members must immediately do a good job in the hotel flood and typhoon response and duty. The organization is as follows:
Commander-in-chief: hotel executive general manager
Deputy commander-in-chief: the hotel in charge of security work of the chief assistant
Member units: guest rooms, catering, front office, engineering, security, finance
Second, typhoon procedures
(a) Typhoon before the self-inspection Preparation
1, the front office: the collection of the main entrance banner and the main entrance of the lanterns and other decorations and POP notice boards; lobby or elevator entrance placed typhoon information notice boards, and ready to typhoon reminder card to the Department of Rooms with the room; ready to prepare umbrellas and rain gear, every employee in the front office should be aware of the typhoon information, and timely answer the guests inquires, ready to the front desk emergency lighting, the lobby associate should be fixed in the lobby The lobby assistant should be stationed in the lobby, do a good job of customer inquiries and pay attention to the door and the lobby of the situation reported in a timely manner, to ensure that the normal business order of the front office.
2, Rooms Department, Food and Beverage Department, Finance Department: check the closure of each room, box, aisle and hallway doors and windows; do a good job on the guests of the typhoon notification Rooms Department should be the typhoon reminder card into the room; prepare emergency lighting;
3, switchboard: responsible for understanding the typhoon situation in a timely manner to report to the leadership of the hotel and the relevant departments responsible for the preparations of the emergency lighting, walkie-talkie, and to check the switchboard Backup power supply is normal operation, and under the guidance of the department manager to do a good job in the power outage emergency services, and do a good job of the guest's inquiry service.
4, each department should be prepared 1 day in advance to report the loss of fabrics, in order to emergency use.
5, by the Engineering Department of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, business departments and tenants of the doors and windows of a comprehensive inspection with wire, rope, stakes and other reinforcement of the unsound suspension should be temporarily removed. Check the underground electric room engine room and other important parts, do a good job of reinforcing the hotel door, and cut off the possibility of short-circuit triggered a fire in the circuit, the pool should be filled with water to ensure that the hotel's normal supply of water, electricity, gas, ready to prepare enough sandbags.
6, the general office is responsible for the typhoon information conveyed to all employees in all departments, the arrangement of all department heads to stay on duty.
7, the security department notified the dormitory security guards to prepare for duty, and with the engineering department to check the hotel periphery, roof and other key parts of the sewer, gutter is smooth, prepare lighting equipment and rain shoes and raincoats, safety helmets, flashlights, emergency lights, and so on.
(b) Review: by the General Office, the Engineering Department, the head of the Security Department in accordance with the above provisions of the preparations for the review of the various departments.
(C) when the wind is strong should start emergency procedures:
1, the security department, the engineering department responsible for the hotel should stay at the hotel at any time to deal with emergencies, to ensure that enough manpower and material resources to do a good job of repair and remedial work.
2, guest rooms, private rooms, cloth, liquor, food warehouse if there is water seepage, the department should immediately transfer the contents of the room to a safe place, the Ministry of Engineering to do a good job of plugging the leakage and drainage work.
3, the front door of the rain may backflow into the lobby, the security department, the engineering department will sandbags piled up at the door to prevent the inflow of PA class is responsible for additional manpower to remove the water.
4, the back door of the rain may backflow into the staff elevator, the security department, the engineering department will sandbags piled up in the back door to prevent the inflow of the back post security guards are responsible for the removal of water, such as rain has been to the elevator backflow, the engineering department should immediately control the elevator in the elevator above the floor of the 1F, prohibited to allow the elevator to run to the -1F - -2F.
5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being destroyed by the wind, and the glass door should be properly kept partially open when reinforced to minimize the wind's `resistance' to the glass door, and the glass of the front door should be guarded by the baggage handlers and the foreman of the security department*** with the same guards. The back door glass is guarded by the security guard at the back door post.
6, the wind is very strong, the gate post security guards baggage should pay attention to falling objects and guide the guest vehicles parked in the underground garage, if necessary, must wear a helmet, the front office should be placed on the front desk desk lamps, flower pots, etc. put away, so as not to be blown over.
7, if there is water in the elevator, the engineering department should immediately start the drainage system to remove the water, in order to avoid if the wind is strong, resulting in the passenger elevator can not run, the restaurant screen should be pushed to the elevator entrance to cover.
8, when encountering a power outage, the Engineering Department immediately contacted the property office to generate power to restore lighting. The Security Department maintains the hotel security order during a power outage. When the power outage restaurant cashier by the restaurant management personnel responsible for in place to guard, the main desk cashier by the Security Department front door post and 02 or 01 guard. Lobby assistant,
01, 02 should do a good job of passenger elevator service, inquiries about whether there are guests were shut off the ladder, to do a good job of being shut off the passenger elevator guests to appease the work of the floor workers and managers of the departments should be dispersed to the various floors, restaurants to the guests to do a good job of explaining and appeasing the work of the guests.
9, gutter blockage, by the Ministry of Engineering, the Ministry of Security *** with the people to be sent to unblocking, unblocking personnel should pay attention to their own safety, must wear a helmet, if necessary, should be tied to the safety rope, by two people a front and a back *** with the operation. Attention should be paid to the roof equipment layer of electrical equipment whether there is a leakage phenomenon.
10, the wind is very large, the office should be responsible for notifying the dormitory employees are prohibited from going out, in the store outside of the staff should be arranged to stay in the hotel, the office and the departments responsible for the office should be dissuaded from leaving work employees are not allowed to leave the hotel, the office should be a good arrangement for food and accommodation for the employees who are stranded.
11, the switchboard is responsible for understanding through the TV, timely report to the department heads of the typhoon situation, such as airports, highways, bridges closed information should be reported to the front office in a timely manner, the front office should be timely to the guests of the hotel notice.
12, the typhoon larger hotel executive general manager, engineering manager, security manager, should stay in the hotel to make emergency preparations, other department managers whether to stay in the hotel should be based on the hotel arrangements, such as leaving the hotel should be reported to the hotel executive for approval.
(d) After the typhoon has caused losses in the hotel, the departments should be summarized within two days to report the losses.
The company's typhoon and rainstorm emergency plan 4
In order to better carry out the implementation of the "safety first, unremitting, prevention-oriented, all-out rescue" approach to flood control, to ensure the safety of students and teachers, to strengthen the awareness of the first life to do early deployment, early prevention, and effectively implement the school's flood season safety work to ensure that the school teachers and students during the flood season. Life and property safety, especially the development of emergency plans for school safety during the flood season.
A safe flood preparations
(a) Ideological preparations. Prevention-oriented, establish a sense of prevention and control. Schools must put the lives of teachers and students in the first place, to overcome the paralysis and the mentality of chance, firmly establish the "everything in advance, not in advance is invalid" concept, enhance the sense of urgency and responsibility to do a good job of school flood control work, we must focus on this year's flood season, in accordance with the flood control plan, do a good job before the flood, in the flood, flood, various stages, various aspects of flood control work. Flood control work. Indeed, in-depth investigation, effective rectification, careful deployment, strict precautions to ensure that the school's flood control measures in place.
(ii) organizational readiness. Schools should establish a flood safety inspection responsibility system, clear responsibilities and tasks, do a good job before the arrival of flood safety inspection. Schools should organize the forces and designate a person responsible for the school building walls, drainage ditches and campus surroundings (roads, bridges), etc. to carry out a comprehensive and careful inspection, the inspection should be made a detailed record, especially the existence of hidden dangers, to be registered and summarized, the study of remediation programs, while designating a specific person responsible for the implementation of the program. To be based on the actual school, especially the existence of . Hidden dangers, targeted development of flood emergency treatment plan, to ensure the practicality of the plan. Specific content includes:
1, the establishment of the school flood rescue work leading group, the list of group members, positions, telephone number to be accurate, the division of labor to be clear;
2, to determine the flood warning, alarm methods, such as radio, whistles, and so on, and implement to the special person in charge;
3, in the event of an emergency, the student evacuation methods, directions, routes, locations and so on, should be specific, and Implement a person responsible for;
4, to increase publicity, so that everyone knows;
5, the list of duty personnel, the phone is accurate, to ensure unimpeded.
(C) material preparation. According to the possible danger of rescue requirements, prepared in advance rescue supplies and equipment for emergency use. Strengthen the inspection and supervision of the key parts of the flood season, in the flood season must have enough drainage and repair power, effective prevention of flood emergencies.
Second, the work of responsibility
The principal is the first person responsible for the full implementation of the school flood control work. The whole school staff must obey the command of the school flood control work leading group and work arrangements, no shirking delay work. *** Party members should be the first to take the lead, the courage to bear the burden, play a pioneering role, anxious teachers and students of the urgent, worried about teachers and students of the worry, unity and cooperation, the same boat ****, to overcome the disaster. Functional groups should be fully organized to assist the school and related departments to do a good job in the rescue and relief and aftermath of the work, to do their duty, at the same time should do their own protection work, strengthen self-protection measures. Any disobedience to the command and work arrangements, or irresponsible work, malfeasance, dereliction of duty, resulting in the spread of the disaster and other serious consequences, will be seriously investigated and dealt with, until the legal responsibility.
Third, the organizational leadership
In order to clarify the division of labor, strengthen the leadership, unified command, collaborative action, the establishment of the flood season school rescue work leading group.
Leader:
Deputy Leader:
Members:
Tasks: When the flood season occurs, the organization of the following five working groups in a timely manner, the deployment of rescue, rescue, relief and other related work.
The following five working groups, their composition and tasks are as follows:
(a) rescue group
Group Leader:
Member:
Tasks: After the emergence of danger, must be rushed to the scene within the first hour, the organization and command of the risk of elimination and control of dangerous situations.
(B) rescue group
Group leader Li Fuhuan
Members:
Task: responsible for contact with the county people's hospital, county hospital, county maternal and child health hospitals and other hospitals, coordination, cooperation, *** with the organization of medical rescue teams, rescue injured people.
(C) rescue and evacuation group
Leader:
Members:
Task: Responsible for organizing and directing the evacuation of threatened people and important materials at the scene.
(D) security group
Group Leader:
Members:
Tasks: to contact the local police station to send police and assist in the periphery of the disaster site guard, vigilance, maintenance of order on the scene, to prevent unruly elements from entering the scene to sabotage.
(E) logistics support group
Group Leader:
Members:
Tasks: to ensure the supply of materials and provide the necessary tools, mobilize transport vehicles, transport emergency personnel and materials.
Fourth, emergency response
(a) the school should strictly implement the duty duty responsibility system, the establishment of the school flood reporting system, in accordance with the principle of early discovery, early reporting, early disposal, once found that the flood should be immediately start the school's emergency response to floods, and timely report to the County Board of Education (b) after the occurrence of floods, the school office and the security The office should be timely and accurate to do a good job at the scene of the information collection and processing work (including stranded, injured people, the situation of the materials at the scene of the flood and the scene around the homes, facilities, rescue teams in place and rescue supplies needs, etc.), and in writing or by phone in the form of timely report to the County Board of Education.
V. Emergency security
(a) Schools should be equipped with a certain number of emergency supplies and equipment according to the relevant provisions of the school should be equipped with the necessary emergency drugs.
(ii) is not allowed in the rainy weather in the outdoor classes or organize a variety of outdoor activities, in case of school hours to listen to the school's arrangements and instructions, anyone any class shall not make private decisions. If necessary, notify the parents of students to school to pick up students, especially home via the Loop students must notify parents to school to pick up.
(C) to strengthen the teachers and staff of the flood safety education, know the flood escape and self-help measures and skills, the school should be in accordance with the requirements of the school's emergency plan for flood safety work to organize teachers and students to carry out the necessary drills.
(4) school classes should strengthen the following situations for serious and detailed investigation, found hidden dangers to take timely measures to be eliminated: classrooms and various functional rooms and other premises safety; student food hygiene, sanitation and disinfection equipment equipped; school stairs, corridors, guardrails, fences, windows and doors, toilets, physical education facilities safety; gathering places of evacuation routes, safety exit The situation; electrical appliances, equipment, line maintenance management; school ditches and campus around the ditches, culverts, smooth situation; students to and from the lot of safety.
Six, post-disposal
Flood school rescue leading group is responsible for the aftermath of the disaster, timely investigation of the disaster damage, and the formation of written materials reported, do a good job of post-disaster treatment, the return to normal order and reconstruction of the work of teaching.
The company's typhoon emergency plan 5First, the guiding ideology:
Typhoon, rainstorm work is related to the lives of teachers and students and the safety of national property security is important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood control and typhoon disposal capacity, in line with the principle of "prevention first, safety first", special The first thing you need to do is to make sure that you have the best possible preparation for the event.
Second, preventive steps:
1, the leading group list and contact phone number
Leader: Director
Members: Logistics Team Leader
Nursing Director
Union Chairman
Kindergarten started the Taiwan flood control plan, the implementation of 24-hour leadership, 24 duty system. 24 duty system.
Third, emergency measures:
1, to strengthen information communication, to do the top of the situation, the bottom of the report.
In the event of a major flood, all the leaders into place, the flood control work leading group began to operate; the leaders in charge of the flood control work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.
2, prevention-oriented:
Clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.
Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.
The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.
Unclogging of gutters and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.
A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.
Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.
Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.
When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.
Fourth, safeguard measures:
After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.
At any time with the higher departments and units to maintain close contact, strengthen the communication of information, to do the upper situation, the lower situation reported.
;