The hospital has 1,200 employees, including 980 health technicians, accounting for 81.7% of the total number of employees, 66 people above the deputy high title, 203 people above the intermediate title, and fixed assets of 251 million yuan. 2011 the hospital completed 245,000 outpatient consultations, 26,500 hospitalizations, 6,332 surgeries, and the rescue of critically ill patients. 3866 times, bed utilization rate of 116.3%, the hospital business income of 168 million.
The hospital covers an area of 26,073 square meters, with a building area of 80,000 square meters, and the newly built 40,000-square-meter outpatient ward complex has been put into use. The hospital has 32 clinical treatment units, 11 medical and technical departments, and 1,200 open beds. The comprehensive ward building is equipped with central oxygen supply, negative pressure suction, call system, central monitoring and other functions. The purified operating room is equipped and constructed according to the international advanced sterile isolation technology, and 9 operating rooms can work at the same time.
The hospital is equipped with a number of advanced medical equipments such as Philips 3.0T nuclear magnetic **** vibration, Varian 120 grating linear gas pedal, Siemens 64-layer spiral CT, 5 color ultrasound of different parts, C-arm, 16-people hyperbaric chamber, and so on. The existing equipments of more than ten thousand Yuan are 533 sets (units), and more than one hundred thousand Yuan are 113 sets (sets), and the total assets of the medical equipments are more than one hundred million Yuan.
In addition to carrying out routine diagnostic and treatment programs, the hospital has carried out neurological interventions, cranial microsurgery, cervical, thoracic and lumbar spine surgery, hip, knee total joint replacement, general surgery, gynecology, urology laparoscopic minimally invasive surgery, etc. At the end of 2006, the hospital was the first hospital to carry out coronary arteriography and stenting in our city county-level hospitals.
In 2009, the hospital launched a 37,381-square-meter 17-story outpatient ward building construction project, of which 12,000 square meters of national bond projects, self-funded projects 25,381 square meters, with an estimated total investment of 120 million yuan. Groundbreaking in July 2009, the project is expected to be completed in 2011. After completion, the hospital total beds up to 1200, 31 clinical treatment areas, annual outpatient clinic 300,000 times, hospitalized patients 28,000 times, will really solve the problem of difficult for patients to see a doctor.