Bidding documents in the "technical support and commitment" to write, and technical parameters in response to the table should be filled in the part of the bidder did not fill in how to do!

Tender documents (technical tender) Tender No.: Bidding equipment: Bidding unit (official seal) Legal representative (signature) (to provide the electronic version of the tender documents can be read) 2009, the Table of Contents (technical tender) 2 Chapter I Chapter V requirements response table 3 Chapter II Brief description of the goods tendered 4 Chapter III technical support information Chapter I Chapter V requirements response table 1, the bidder shall Chapter V requirements (including the content of technical annexes) to fill in the "Chapter V requirements response table" item by item, and the bidder should fill in the "technical parameters response table" part is not filled out how to do. Bidders shall fill in the requirements of Chapter V (including the contents of technical annexes) item by item in the "Chapter V Requirements Response Table" and respond according to the requirements in the table. Bidder's name: Bidding No.: Package No.: Bidding document entry No. equipment/sub-item name Bidding requirements Response Deviation Specific response indicators and specific measures taken Corresponding support information Page/serial No. Note: Note: 1). Fill in the response item by item according to the requirements listed in Chapter V of the solicitation documents (including the contents of the technical annexes); fill in the specific parameters of the response to the specific indicators, and fill in the specific measures taken or response conditions to the other requirements. 2). Goods Requirements List should be given in the format of a separate list of responses. * 3). Bidders who do not fill in this table item by item according to the requirements listed in this chapter (including the contents of the Technical Annex), or who simply copy the contents of the tender as a response to the indicators will lead to the abolition of the bid. 4). If the bidding documents have been requested, but the supplier does not fill in whether to respond or not, it will be treated as non-responsive. 5). In particular, the specification or model number of each component of the equipment and the manufacturer or brand should be filled in clearly and completely. Signature of the bidder's representative: 2. If the parameters (indexes, values, symbols) in the "Chapter V Requirements Response Table" provided by the bidder do not conform to the parameters (indexes, values, symbols) of the technical support information attached to the bid, the reasons must be specifically stated in the bidding documents and recognized by the evaluation committee when evaluating the bids, or else the parameters (indexes, values, symbols) of the technical support information attached to the bid shall be treated as non-responsive. Otherwise, the parameters of technical support information (indexes, values and symbols) attached to the tender shall prevail. 3, the bidder to provide the "Chapter V Requirements Response Table" in the function, configuration ...... and other response content and the technical support information attached to the bid contradicts the description, is considered non-responsive. Chapter II Introduction to the bidding goods Goods name, model, specifications, quantity, performance, characteristics; goods manufacturing, inspection, acceptance of the implementation of the standards; the use of new technologies, new technologies, new materials; production of the bidding goods (or products similar to the bidding goods) of the performance; quality assurance measures; to ensure that the delivery period of the measures; pre-sale, after-sales service content (paid, unpaid should be listed separately); training of the specific measures; Other issues that need to be clarified. Instructions for filling in: If the bidding offer is not filled in the above text description, so that the evaluation of the bid to cause difficulties, the responsibility of the bidder. See the table of contents for the attached table of contents. Chapter III Technical Support Information Product production license (copy) The main equipment for the production of the bidding product (Schedule I) Award certificate of the bidding product (if any, provide a copy) Various test reports, identification certificates (if any, provide a copy) Product samples Product user name, the main users of the use of the situation reflected (if any, provide a copy) The schedule of the project service commitments, the requirements of the construction conditions of the bidding document Requirements of the bidder to explain other matters and other information to be provided Schedule I Production of the main equipment of the bidding product Item No.: Package No.: Bidder's name: Serial No. Equipment Name Model No., Specification Quantity Acquisition time Note: including testing equipment and special machines PAGE