In the real world, the letter of commitment in our field of vision more and more often, the letter of commitment itself, although no legal effect, but there is a binding effect, sign the letter of commitment, you have to test the integrity. I believe that writing a letter of commitment is a headache for many people, the following is what I have organized for you, I hope to be able to help you.
Engineering Quality and Safety Commitment 1Name of the project:
The team where the project is located:
Construction site:
The project's planned construction period: January 1, 2012 to January 1, 2012
The construction unit:
In order to strictly manage the project's safety, quality, progress, and cost, and to carry out the whole process of supervision of the construction process, and to strictly monitor the quality of the project, it is important to ensure that both the construction unit and the construction unit will be able to meet the requirements of the project. To ensure that the construction unit and the construction unit of the rights and obligations of the two sides, the following provisions, the construction unit should strictly comply with the implementation.
First, the project must be handled before the start of the report, construction safety technical measures, by the Ministry of Production, Safety Supervision Department, the center of the leaders in charge of the consent and report to the manager for approval before the start of the project.
Second, the construction of the project is strictly in accordance with the requirements of the safety measures to improve the safety of the site, if there is not according to the measures of construction, the construction unit site manager has the right to immediately stop the construction, rectification within a period of time, by the relevant personnel on-site inspection until qualified before resumption of work.
Third, special types of operators must hold a valid license issued by the relevant units licensed to work.
Fourth, into the pool, pump room and other key parts of the five pipes, must hold a letter of introduction issued by the center. (The letter of introduction to indicate the reason for entry, the name of the person entering the province and the number of certificate, the site responsible for the name and contact information)
Fifth, the project exists in the construction of waste materials recycling, the construction unit is responsible for recycling, and returned to the construction unit, the center of the Department of Materials and Supply is responsible for the unified recycling. The construction unit shall not be disposed of at will.
Six, the construction site safety responsible person has the responsibility for the construction site safety, found hidden dangers immediately rectify.
VII, the team site representative has the right to the construction process of safety and quality problems, should promptly require the construction unit to rectify the deadline, or the right to stop its construction. All the consequences caused by the construction unit to bear.
Eight, the above matters recognized by the two sides, signed and sealed into effect.
Construction unit: construction unit:
Site construction responsible person: site representative:
Contact information Contact information:
Signing Time: Monthly
Engineering Quality and Safety Commitment 2According to the legal person of the unit's power of attorney, I'm the construction unit of the project project manager: . In order to effectively fulfill the legal duties of the person in charge of the project, to ensure the quality and safety of the project, I commit to the following:
1, strictly fulfill the laws, regulations and standards and norms stipulated in the duties of the construction unit. Ensure that in accordance with the static review of qualified construction plan design documents and construction technical standards for construction, to ensure that the construction process in line with laws and regulations and mandatory standards for engineering construction requirements. Resolutely put an end to all kinds of production safety and engineering quality accidents, due to the construction of engineering quality and safety accidents or problems, I am willing to assume lifelong responsibility.
2, to ensure that the post performance, the implementation of the project leader construction site lead system. Seriously comply with the relevant provisions of the construction authorities, and obey the supervision and management. Ensure that the project manager's signature is my signature, and is responsible for the authenticity of the material. For dereliction of duty, dereliction of duty caused by the project quality and safety accidents and problems, willing to bear the responsibility.
3, to ensure that the works undertaken to meet the relevant requirements of standardized sites, in accordance with standardized requirements for management and construction.
Name of the construction unit: Zhongning County, the second construction and installation engineering company Tel:
Project leader: (signed) ID card number:
Professional qualifications: Registration Certificate No.:
Year Month
Engineering Quality and Safety Commitment 3(name of the construction unit) as the (name of the construction project) of the fire protection construction unit of the fire protection of this construction project Quality commitment to perform the following duties:
First, the engineering design drawings without the public security fire protection agencies qualified, unauthorized construction;
Second, in accordance with the national engineering and construction fire technical standards and fire design review agreed or recorded fire design documents for the organization of the construction, shall not be unauthorized changes in the fire design for construction, reduce the quality of fire construction;
Third, in the construction process. In the construction process, such as fire design drawings found to exist in error, timely feedback to the construction unit, design unit, the public security organs of the fire agency;
Fourth, the establishment of the construction quality responsibility system, the establishment of a sound system of inspection of the construction quality, strict management of the work process, to make a good hidden project quality inspection and records to ensure that the fire protection engineering construction quality;
Fifth, the inspection of fire protection products and fire safety requirements of the building components, building Performance requirements of the building components, building materials and interior decoration materials quality, the use of qualified products to ensure the quality of fire protection construction; fire protection products into the construction site, in accordance with the provisions of the need to carry out witness sampling test and sampling test, should be in accordance with the provisions of the site with the sampling;
six, the implementation of construction site fire safety management measures to prevent fires;
seven, Set up in line with fire safety requirements of construction personnel accommodation and combustible, flammable materials stacking, storage places, strict management of fire, electricity;
viii, after the completion of the project, urging the construction unit to declare acceptance in a timely manner, and actively cooperate with the construction unit to do a good job in the construction of fire acceptance of construction works, the project manager must participate in the fire acceptance. For the fire acceptance of the problems that exist in a timely manner to rectify. Without fire inspection and acceptance, shall not be handed over.
If you fail to fulfill the above fire safety responsibilities, will be based on the "Fire Services Law" Article 58, Article 59 and "Construction Law" of the relevant provisions of the penalty. Harmful consequences, according to the "supervision and management of construction fire regulations," Article 41, in addition to accepting the administrative penalties or criminal responsibility according to law, according to civil liability.
(Seal)
Year Month
Engineering Quality and Safety Commitment 4The project constructed by my unit, according to the "Chinese People's **** and the State Construction Law", "Chinese People's **** and the State Safety Production Law", "Regulations on the Management of Quality of Construction Works", "Regulations on the Management of Safety Production in Construction Works" and related laws and regulations, in order to strengthen the quality and safety production of construction works In order to strengthen the quality and safety production of construction projects, and to promote my unit to strengthen the awareness of quality and safety responsibility, and to ensure zero quality accidents and zero safety production accidents, we now solemnly promise the following:
(a) Before the commencement of the construction project, my unit shall apply for a construction license to the competent department for construction administration of the people's government at or above the county level of the place where the project is located in accordance with the relevant provisions of the State;
(b) My unit shall report the construction drawings and design documents to the competent department for construction administration of the people's government at or above the county level The competent department for construction administration of the people's government at or above the county level or other relevant departments for examination.
(C) I units before receiving construction permits or reports on the commencement of construction, should be in accordance with the relevant provisions of the state for the supervision of the quality of the project.
(d) The construction project contracting unit shall not force the contractor to bid at a price lower than the cost, and shall not arbitrarily compress the reasonable construction period.
(e) I unit shall not expressly or implicitly design unit or construction unit in violation of the mandatory standards of engineering construction, reduce the quality of construction works.
(F) advocate the implementation of general contracting of construction works, prohibit the dismemberment of construction works contracting.
(VII) I should be from the date of acceptance of the completion of construction works within 15 days of the date of acceptance of the report on the completion of construction works and planning, public security and fire safety, environmental protection and other departments issued by the recognition of the document or permit the use of the document reported to the competent administrative department of the construction or other relevant departments for the record.
(H) I units in the preparation of the project estimates, should determine the construction works of safe working environment and safety construction measures required.
(ix) Our unit shall not expressly or implicitly construction units to buy, rent, use of safety protection equipment, machinery and equipment, construction equipment and accessories, fire safety facilities and equipment do not meet the requirements of safe construction.
(10) I unit commitment in the construction of the project did not fulfill its duties and responsibilities in place according to the following principles of punishment:
violation of the "Chinese People's Republic of China *** and the State Construction Law", "Chinese People's Republic of China *** and the State Production Safety Law", "Construction Quality Management Regulations", "Construction Safety Management Regulations" and other relevant laws and regulations, according to its provisions from the strictest, the upper limit of the penalties.
Construction unit (official seal):
Date: January, 2012
Legal representative: Tel:
Delegated representative: Tel:
Engineering Quality and Safety Commitment 5According to the legal person of the unit's letter of authorization, I am the construction unit of the construction of the project responsible for the project: . In order to effectively fulfill the legal duties of the person in charge of the project, to ensure the quality and safety of the project, I commit to the following:
1, strictly fulfill the laws, regulations and standards and norms stipulated in the duties of the construction unit. Ensure that in accordance with the static review of qualified construction plan design documents and construction technical standards for construction, to ensure that the construction process in line with laws and regulations and mandatory standards for engineering construction requirements. Resolutely put an end to all kinds of production safety and engineering quality accidents, due to the construction of engineering quality and safety accidents or problems, I am willing to assume lifelong responsibility.
2, to ensure that the post performance, the implementation of the project leader construction site lead system. Seriously comply with the relevant provisions of the construction authorities, and obey the supervision and management. Ensure that the project manager's signature is my signature, and is responsible for the authenticity of the material. For dereliction of duty, dereliction of duty caused by the project quality and safety accidents and problems, willing to bear the responsibility.
3, to ensure that the works undertaken to meet the relevant requirements of standardized sites, in accordance with standardized requirements for management and construction.
Name of the construction unit: Zhongning County, the second construction and installation engineering company
Phone:
Project leader: (signed)
ID card number:
Professional qualifications:
Registration Certificate No.:
Year month
Engineering Quality and Safety Commitment 6Three parties on the _________ Project in conscientiously implementing the national and municipal laws and regulations on quality and production safety, standards and norms, and other aspects of mutual coordination and cooperation, and effectively fulfill the responsibilities and obligations of project quality and
production safety, commitment is as follows:
First, the construction unit:
(a) quality:
1, the project will be contracted to the unit with the appropriate qualification level; not dismembered construction works contracted.
2, in accordance with the law on the project construction project investigation, design, construction, supervision and procurement of important equipment, materials and other construction-related tenders.
3, to provide the survey, design, construction, construction supervision and other units with original information related to the construction project, and to ensure that it is true, accurate and complete.
4, do not force the contractor to bid at a price lower than the cost, not arbitrarily compressed reasonable construction period; not express or imply that the design unit or construction unit violates the mandatory standards of engineering and construction, and reduces the quality of construction works.
5, the construction drawings design documents reported to the county level or above, the construction administrative department or other relevant departments for review. Construction drawings design documents are not used without review and approval, major changes in accordance with the provisions of the re-report review.
6, before receiving the construction permit or commencement report, in accordance with relevant state regulations for project quality supervision procedures.
7, in accordance with the contract, the construction materials, components and equipment purchased by the construction unit to ensure that their quality in line with the design documents and contract requirements. Not express or implied construction units to use substandard building materials, components and equipment.
8, in accordance with the provisions of the organization's design, construction, construction supervision and other relevant units for completion inspection. Without the completion and acceptance of the record is not delivered for use.
(B) safety
1, to provide the construction unit to the construction site and adjacent areas of water supply, drainage, power supply, gas supply, heating, communications, radio and television and other underground pipeline information, meteorological and hydrological observation information, adjacent buildings and structures, underground works of the relevant information, and to ensure that the information is true, accurate and complete.
2, not to survey, design, construction, engineering supervision and other units do not meet the requirements of construction safety laws, regulations and mandatory standards, and do not compress the contract period.
3, in accordance with the provisions of the construction unit timely payment of production safety and civilized construction measures.
4, do not express or imply that the construction unit to buy, rent, use safety protection equipment, machinery and equipment, construction equipment and accessories, fire facilities and equipment do not meet the safety construction requirements.
5, when applying for a construction license, provide information on construction safety measures.
Second, the construction unit
(a) quality:
1, according to the corresponding level of qualification certificate, and in its qualification level within the scope of contracting works. No subcontracting or illegal subcontracting of works.
2. Establish a quality responsibility system and be responsible for the construction quality of the building works. According to the law, the construction works will be sub-contracted to other units, the quality of the sub-contracted works will be jointly and severally liable.
3, in accordance with the engineering design drawings and construction technical standards of construction, without unauthorized modification of the engineering design, not jerry-building. In the construction process found in the design documents and drawings have errors, timely comments and suggestions.
4, in accordance with the engineering design requirements, construction technical standards and contractual agreements, building materials, components, equipment and commercial concrete inspection; without inspection or unqualified test, do not use.
5, the establishment of a sound construction quality inspection system, strict process management, good quality inspection and records of hidden works.
6, involving structural safety of the test blocks, test pieces and related materials, in the construction unit or project supervision unit witnessed on-site sampling, and sent to the appropriate qualification level of the quality testing unit for testing.
7, the establishment of a sound education and training system, to strengthen the education and training of employees; without education and training or assessment of unqualified personnel, do not work.
8, in accordance with the law to fulfill the quality of construction works warranty obligations.
(B) safety
1, according to the law to obtain the appropriate level of qualification certificates, and in the qualification level within the scope of the license to undertake the project.
2. The main person in charge is fully responsible for the work safety of the organization in accordance with the law. Establish and improve the production safety responsibility system and production safety education and training system, the development of production safety rules and regulations and operating procedures, to ensure that the unit of production safety conditions required for the investment of funds, the construction works undertaken by the regular and special safety inspections, and make a good record of safety inspections. The project manager by obtaining the appropriate licensing qualifications to serve as a person responsible for the safe construction of construction projects, the implementation of the production safety responsibility system, production safety regulations and operating procedures, to ensure the effective use of production safety costs, and according to the characteristics of the project to organize the development of safety construction measures to eliminate hidden safety accidents, timely and truthful reporting of production safety accidents.
3, the establishment of production safety management organization, with full-time production safety management personnel. Full-time production safety management personnel are responsible for on-site supervision and inspection of production safety. Discover hidden safety accidents, timely report to the project manager and production safety management organization; for unauthorized command, unauthorized operation, immediately stop.
4, vertical transportation machinery operators, installation and dismantling workers, demolition operators, blasting operators, lifting signallers, scaffolding operators and other special operators, in accordance with the relevant provisions of the state after special training in safety operations, and obtain a special operations operation qualification certificate, on duty.
5, in the construction of the organizational design of the preparation of safety and technical measures and construction site temporary power plan, for the more dangerous sub-projects, in accordance with the relevant national and provincial and municipal regulations for the preparation of special construction programs, review and expert verification, meet the requirements of the organization and implementation.
6, before the construction project, the technical personnel responsible for project management of the technical requirements related to safety construction to the construction team, the operator
staff to explain in detail, and signed by both parties to confirm.
7, at the entrance to the construction site, construction cranes, temporary power facilities, scaffolding, access to the entrance, stairway, elevator shafts, holes, bridges, tunnels, the edge of the pit, explosives and hazardous dangerous gases and liquids storage and other dangerous parts of the construction site, set up obvious safety warning signs. According to different stages of construction and the surrounding environment and seasonal and climatic changes, the construction site to take appropriate safety construction measures. Construction site temporarily suspended construction, do a good job of site protection.
8, the construction site of the office, living area and operating areas set up separately, and maintain a safe distance; office, living area site selection in line with safety requirements. Employee meals, drinking water, resting places, etc. in line with health standards. Not set up in the building has not been completed staff group quarters.
9, due to the construction of construction projects may cause damage to adjacent buildings, structures and underground pipelines, etc., to take special protective measures. Compliance with relevant environmental protection laws and regulations, in the construction site to take measures to prevent or reduce dust, exhaust, waste water, solid waste, noise, vibration and construction lighting hazards and pollution of people and the environment. Construction projects in urban areas of the city, the construction site to implement closed enclosure.
10, in the construction site to establish fire safety responsibility system, to determine the fire safety responsibility, the development of fire, electricity, the use of flammable and explosive materials and other fire safety management system and operating procedures, set up fire escapes, fire fighting water sources, equipped with fire fighting equipment and fire fighting facilities and equipment, and set up a clear sign at the entrance to the construction site.
11, to provide safety protective equipment and safety protective clothing to the operating personnel, and informed in writing of the operating procedures of dangerous jobs and the hazards of unauthorized operation.
12, the operators to comply with the mandatory standards of safety construction, rules and regulations and operating procedures, the correct use of safety protective gear, machinery and equipment.
13, procurement, rental with production (manufacturing) license, product certification of safety protective gear, machinery and equipment, construction equipment and accessories, and check before entering the construction site. Construction site safety protection gear, machinery and equipment, construction equipment and accessories arranged for special management, regular inspection, repair and maintenance, the establishment of the corresponding data files, and in accordance with relevant state regulations in a timely manner scrapped.
14, in the use of construction cranes and overall lifting scaffolding, templates and other self-erecting erection facilities before the organization of the relevant units for acceptance, or commissioned with the appropriate qualifications of the inspection and testing agency for acceptance; the use of leased machinery and equipment and construction machinery and fittings, acceptance and use.
15, the main person in charge, the project manager, full-time production safety management personnel qualified by the competent administrative department of construction or other relevant departments to serve. Managers and operators at least once a year for production safety education and training, their education and training is recorded in the individual work files.
16, for the construction site engaged in dangerous operations for accidental injury insurance.
Third, the supervision unit:
(a) Quality:
1, according to the law to obtain the appropriate level of qualification certificates, and in the qualification level permitted within the scope of the project supervision business.
2, in accordance with the laws and regulations and the relevant technical standards, design documents and construction contract, on behalf of the construction unit of construction quality supervision, and construction quality supervision responsibility.
3, the selection of the appropriate qualifications of the superintendent engineer stationed at the construction site.
4. Without the signature of the supervising engineer, the construction unit shall not carry out the construction of the next process before the construction materials, components and equipment are used or installed on the project. Supervision engineers will strictly carry out incoming acceptance, unqualified ` not allowed to enter the next process of construction.
5, in accordance with the requirements of the specification of engineering supervision, take the form of bystanders, inspections and peace inspections, etc., the implementation of supervision of construction works.
(B) safety:
1, review the construction organization design of the safety measures or special construction programs.
2, in the implementation of the supervision process, found that there are hidden dangers of safety accidents, the construction unit is required to rectify; the situation is serious, the construction unit is required to temporarily stop construction, and promptly report to the construction unit. Construction unit refuses to rectify or not stop construction, timely report to the competent authorities.
3, in accordance with laws, regulations, rules and mandatory standards for construction supervision, and construction safety production supervision responsibility.
4, the legal representative of the enterprise supervision of the project to implement the production safety supervision responsibility is fully responsible.
5, the person in charge of technology is responsible for approving the project supervision organization's safety supervision program, and guiding the superintendent engineer to review the construction process complexity, technical difficulty of the special construction program.
6, the configuration of full-time safety supervision personnel. Equipped with the necessary safety regulations, standards and safety technology documents, work protection equipment, facilities and common testing tools.
7, the establishment of the following safety supervision system, and supervise and check the implementation of the project supervision body: ① review and verification system; ② inspection and acceptance system; ③ supervise and rectify the system; ④ site meeting system; ⑤ reporting system; ⑥ education and training system; ⑦ data management and archiving system; ⑧ other for the implementation of the responsibility of the safety supervision and supervision of the safety supervision system necessary to do a good job.
Construction unit (seal)
Construction unit (seal)
Supervision unit (seal)
Year Month Day Year Month Day Year Month Day
Project Quality and Safety Commitment 7If my company is lucky enough to win the bid, my company will do our best to complete the construction task. Our company will bear the quality warranty responsibility for the project during the quality warranty period in accordance with the laws, administrative regulations or the relevant provisions of the state on the quality warranty of the project.
First, the quality warranty period
Our company in accordance with the "Regulations on the Quality Management of Construction Works" and the relevant provisions, agreed that the quality warranty period of the project in accordance with the current national warranty provisions.
The quality warranty period is two years from the date of completion and acceptance of the project.
Second, the quality warranty responsibility
1, belonging to the warranty scope, content of the project, our company in the warranty notice received within 7 days after the warranty.
2, an emergency repair accident, our company will immediately arrive at the scene of the accident repair after receiving the accident notice.
3, the quality of the warranty is completed, the acceptance of your organization.
Third, the commitment
After the completion of the project inspection, the company will establish the quality of the project and the function of the use of the return visit system. Our company strictly implement the provisions of the Municipal Construction Commission on warranty maintenance, take the initiative to sign a warranty contract with the construction unit, the issuance of warranty service card, the implementation of the three announcements, to ensure that customers can reflect the project to us in a timely manner. Since the completion of the project acceptance and delivery of use, set up a "customer is God" user-oriented ideology, strictly in accordance with the national provisions of the warranty period, to carry out thoughtful service.
Half a year after the handover of the project for the first time to visit, to understand the project in terms of quality and functionality of the use of the problem, and for the record, as soon as possible, the organization of the relevant personnel to carry out repairs and processing, until all the repairs are completed. (Student Accommodation Commitment)
The second return visit will be made one year after the delivery of the project to understand in detail the opinions and suggestions of the customers on the project and reply them in a short period of time to satisfy the customers. Each return visit should make a good record of the return visit, in order to consider the new refurbishment program, and timely resolution of existing problems.
After the warranty period, the company established a user hotline, timely and enthusiastic answer to user inquiries and solve user difficulties, on call.
Your unit can reserve 3% of the project quality warranty according to the amount of the project settlement, to be returned after the expiration of the warranty period. My company hereby undertakes: in the warranty period if my company can not assume the obligation of warranty in a timely manner, your unit can arrange for other construction units to carry out maintenance, the maintenance costs incurred by all deducted from the quality of the deposit, and my company imposed a warranty amount of 100% of the liquidated damages penalties.
Bidder (seal):
Legal representative or his authorized agent (signature or seal):
Date:
Month and year
In order to give full play to the intermediary's role as a medium of the market, consciously strengthen the industry's self-discipline, establish a good image of the real estate brokerage institutions, and promote the healthy development of the real estate market as a practitioner of the intermediary market on the first floor of the XX Real Estate Transaction Center. Exchange Center on the first floor of the intermediary market practitioners, we publicly committed to the community:
1, to ensure compliance with national laws and regulations, and in accordance with the approved scope of business legally, justly and fairly engaged in real estate intermediary agency business;
2, to ensure that the integrity of the practice of providing high-quality, professional intermediary services, and effectively protect and safeguard the interests of both parties to the transaction;
3, Guarantee that the housing information provided is objective and fair, does not provide false materials, advertising is not exaggerated, not misleading, and does not harm the interests of the parties;
4, to ensure that they do not take on commissions that can not be competently or can not be completed in accordance with the agreed time limit, and do not provide intermediary services to the houses that do not have the certificate of housing ownership, or the disputes over ownership, the rights of the restricted houses;
5, to ensure that the agency's sales of newly-built The new commercial real estate meets the conditions of listed for sale, and does not provide sales agency for the commercial real estate which has not obtained the "XX City Commercial Real Estate Pre-sale License";
6. Ensure that the intermediary service fees are charged in accordance with the government's regulations, and do not raise the intermediary service fees without authorization; do not ask for or accept the honorariums or other belongings outside the entrustment contract, and if the overcharge is in violation of the regulations, the overcharge will be refunded double; if there is any behavior of earning the difference in the price, the difference in the price charged will be refunded double. Double refund of the difference in price charged.
7, to ensure strict fulfillment of the contract, the contract is not completed within the period stipulated in the contract, double the deposit paid due to the intermediary reasons for the signing of the contract after the parties can not be in the contract within the agreed period of time for the ownership of the registration procedures, double the refund of the contract agreed intermediary fees.
We will strictly abide by this commitment, and if there is any violation, we are willing to accept the punishment, and welcome the supervision of the community.
Unit (seal)
Legal representative:
Year month
In order to ensure the successful completion of the **** project, our unit makes the following commitments:
I. Quality Assurance
1, construction quality: In order to ensure the quality of the construction, the construction of construction quality norms, standards (including mandatory standards) are seriously implemented The relevant provisions of the pre-construction technical briefing to the construction staff, until each worker is familiar with the operation process, the construction of the requirements of the construction process in strict accordance with the operation of the construction of the construction quality of the construction in strict accordance with the "three inspection system" (self-checking, handover inspection, professional inspection) for the inspection of each process does not check or check does not meet the quality requirements, will never carry out the next process of construction. Construction, and the establishment of a quality management system and quality assurance system to ensure the quality of the project.
2 materials: strict control of the quality of incoming materials, to fulfill the material inspection procedures, the use of materials with a certificate of conformity and re-inspection report.
Second, the duration of the guarantee
1, the organization of reasonable measures: ① unified scheduling and management by the project department. ② timely implementation of materials, machinery, labor and scheduling, management. Do a good job of process scheduling, prepare the work surface in advance.
2, the implementation of progress management: ① weekly scheduling plan, issued by the team and individual quotas and completed volume of work indicators, clear responsibility. ② daily team progress and quality of the implementation of self-inspection, proposed specific measures to complete the program. Weekly coordination meeting will be held to coordinate the work process and construction progress, and solve the factors delaying the construction schedule in time. 3, the duration of commitment: to ensure that the contract period completed on time.
Third, safety, civilized construction
Construction team for the safety of the direct person in charge, and send a full-time safety officer. In addition to comply with the requirements of the safety regulations, should also pay attention to the following points:
(a) the construction of electricity safety
(b) safety measures
1, the implementation of the "safety first, prevention first" policy, throughout the construction process, must seriously comply with the construction safety standards and safety management system, and strive to do a good job of safety production. Safety management system, and strive to do a good job of safe production, civilized construction, to prevent the occurrence of vicious accidents.
2, the implementation of safety norms.
3, the establishment of construction accidental injury insurance system, according to law to the project construction personnel to buy construction accidental injury insurance.
In accordance with the law and engineering construction personnel to sign labor contracts, pay workers' wages on time, and never default on the wages of famous workers.
4, consciously accept the use of units and their management of the construction project quality, safety and other supervision and inspection, timely rectification of the problems raised in the inspection.
Fourth, security management
1, held a weekly security education, sent a person in charge of security management, the security management measures to the implementation of each team.
2, the construction team is not allowed to fight, strictly prohibit the construction workers beyond the scope of activities, affecting the life of site management.
3, do not comply with the provisions of the site security management, will be dismissed.
V. Environmental health
1, the site every day in a timely manner to organize the living garbage, we must keep the living space neat and tidy;
2, site waste must be cleaned up every day, to prevent pollution;
3, all the garbage must be discarded in the designated place, do not take the liberty to put the abandonment.
4, resolutely implement the site clean construction behavior, to ensure that the construction environment is clean.
Commitment unit (signature):
__________________
Commitment (signature):
___________________________