Sample Emergency Plan for Equipment Failure (Selected 5)
In our study, work or life, sometimes there will be some emergencies, in order to control the development of the accident, there may be a need to formulate an emergency plan in advance. How to write an emergency plan to play its role more? The following is my collection of equipment failure emergency plan example, welcome to read, I hope you can enjoy.
In order to improve the hospital's internal self-prevention, self-rescue capabilities, so that all staff can understand and master the characteristics of the fire, in the event of a fire accident, can do a planned, step-by-step, accurate, timely and effective fighting, so that the fire damage is reduced to a minimum, according to: "prevention first, According to: "prevention-oriented, prevention and elimination combined" principle, combined with the actual situation of the hospital's fire fighting work, has developed the following fire emergency program, please strictly implement the section.
A key part of the fire emergency measures
1, the ward fire accident, the first should stabilize the mood of the staff, so as to avoid confusion and cause greater losses. Do "first save people, save things", "first patients, after the staff" principle. The evacuation of the scene and the evacuation of materials in order, do not scramble to be the first, crowded each other, not to block the channel in the middle of the self-inflicted injuries, resulting in undue tragedy. When a fire occurs the person in charge of the ward and the volunteer firefighters should quickly arrive at the scene, organize the personnel to fight the fire and arrange for the alarm. When the fire people trapped, do not jump to escape, you can be set, sheets, curtains or other available ropes fastened, grab the rope and slide down to a safe place.
Once the fire accident occurred in the ward, the following plan should be implemented:
① First understand the fire direction, location, cause, burning material and so on.
② Section staff quickly divided, a person notify the hospitalized patients ready to evacuate, a fire alarm 119, a person notify the hospital, the urgent call to the hospital staff emergency assistance.
③ The fastest speed to cut off the power supply of the floor (floor power switch to the middle staircase)
④ Stabilize the mood of the patients and employees, orderly, organized patients, especially mothers, babies, quickly evacuated to a safe place.
⑤ To the effective time, grab out the flammable and explosive items, such as oxygen cylinders, alcohol, etc..
⑥ For the 119 fire department did not arrive before the volunteer firefighters and employees to the division dean or department head under the command of the full use of existing fire equipment in the hospital to fight.
⑦ on the shortest possible time by the dean in charge of the competent department and the relevant departments to report the fire, and organize the investigation of the cause of the fire and the aftermath of the work of the relevant personnel.
2, for the distribution room fire accident, the electrician should immediately cut off the power supply, with 1211 fire extinguishers or dry powder fire extinguishers to fight.
3, the warehouse fire accidents, warehousemen and volunteer firefighters should quickly cut off the power supply. When the fire spreads to the upper level, control the upper level, the lower level of defense; when the fire spreads to the level, the first control left and right, after the upper and lower defense. Control the upper and lower levels, with the upper level being the main one. Pay attention to the evacuation of materials, and is responsible for the fire department to introduce the number of materials stored, the presence of dangerous, flammable items and trapped people and so on.
Second, on the general fire department fire emergency measures
On the general fire department fire, the nearest department to the fire accident, the personnel should be quickly extinguished, the head of the department and the volunteer firefighters rushed to the scene, organizing the personnel to extinguish the fire and quickly call the police. At the same time, the organization of personnel to organize important, valuable and dangerous goods, and make preparations for evacuation.
Third, the hospital leadership of the fire fighting emergency measures
The hospital in charge of fire safety vice president should quickly rushed to the scene of the fire accident, called the relevant leaders to set up a fire-fighting leadership group, to understand the situation and carry out the appropriate division of labor. The fire accident to take while rescuing trapped personnel while organizing personnel to control the fire, transfer and evacuation of materials. To the fire department to introduce the fire occurred in the department or ward of the house structure, distribution, water sources, the danger of materials and trapped personnel.
Four, how to dial "119" fire phone
Once the fire, immediately dial "119" fire phone. Alarm do not panic, to report the fire occurred in the street (Youth Road, No. 288), the name of the unit, the name of the alarm and contact number and whether someone trapped and trapped number of people, to say clear section of the room with or without flammable and explosive substances (such as oxygen cylinders, alcohol, etc.). After the report, please do not rush to hang up the phone, wait for the police officer to say good and then hang up, such as he had any questions or did not hear clearly, please inform in detail.
Fifth, do a good job of preventing the prevention of disease in the future
Each section to do a good job of preventing the use of electricity safety, each section (post) to designate personnel usually do a good job of electricity and medical equipment performance safety checks and records (once a week), found that the problem promptly to the section chief or the supervisor of the Dean report, no problem promptly recorded on the case. The hospital monthly record of a check, the results of the inspection and personal system assessment and departmental year-end assessment linked.
In short, the hospital staff should be familiar with and master the above content and measures to actively rescue and relief after the accident, in order to reduce losses and win time, and pay attention to protect their own safety.
Equipment failure emergency plan Part 2
Article 1 In order to strengthen and standardize the company's fire safety management, fire prevention and reduce fire hazards, according to the "People's Republic of China *** and the State Fire Services Act" as well as "organs, groups, enterprises, institutions, fire safety management regulations," combined with the actual company, the development of this fire safety emergency plan.
Article 2 The development of fire emergency plan, in order to face the company's unexpected fire accidents, to be able to unify the command, timely and effective integration of manpower, material resources, information and other resources, the rapid implementation of the fire for the fire organized control and rescue, to avoid panic and disorder at the scene of the fire, to prevent the missed opportunities and leakage of control out of control, to minimize casualties and property damage.
Article III of the company set up a fire safety emergency command team, responsible for the company's fire scene command, fire safety emergency command team by the unit head and the manager in charge of security and members of the relevant departments. Fire emergency command team responsibilities: command and coordination of the working group and volunteer fire department to work, quickly guide the evacuation of people, timely control and fight the incipient fire; coordination with the public security fire department to carry out fire fighting and rescue operations.
Specific division of labor is as follows:
Responsible for immediately organizing personnel to fight.
Responsible for organizing personnel to channel trapped people and maintain order at the scene.
Responsible for immediate contact with the hospital, public security, fire department, explaining the details of the accident location, the accident, and sent to the intersection to meet.
Responsible for on-site materials, vehicle scheduling.
Article IV according to personnel changes in a timely manner to adjust the volunteer firefighters, firefighters every year for business knowledge training and practical exercises, education, all employees to learn the use of fire extinguishers, fire extinguishers to master fire extinguishers to extinguish fire and self-help equipment in good condition, timely replacement of expired and ineffective fire extinguishers, to ensure that the fire extinguishers of the normal effectiveness.
Article V Fire Emergency Measures
(a) Alarm: the company staff, the duty officer found that the fire should be immediately to the company's security department to report to the police, according to the fire can be reported directly to the "119" fire alarm.
(b) Receiving the police: security department to receive the police, should immediately report to the company's leadership and fire emergency command team, notify the working group and the volunteer fire department to start the emergency plan.
(C) Disposal: Command of the working group, the volunteer fire department quickly assembled, in accordance with the division of responsibilities, into the appropriate location to carry out fire-fighting and rescue operations. The fire scene personnel in an orderly ` evacuation. Fighting the fire in accordance with the "first control, after the fire: save people more important than fire: the first key after the general" fire-fighting tactical principles. And send people to cut off the power supply in time, connect the fire pump power supply, organize the rescue of casualties, isolate fire hazards and important materials, make full use of the unit's fire fighting facilities and equipment to extinguish the fire. Burning clothes on the casualty is difficult to take off for a moment, you can let the casualty lying on the bottom moisture rolling, or water sprinkler to extinguish the flame, and immediately sent to the hospital for treatment.
(D) to assist firefighters to extinguish the fire. On the basis of self-help, when the professional fire department arrived at the scene of the fire, the fire emergency command team should briefly explain the fire to the fire department in charge of the fire situation, and fully support the firefighters to extinguish the fire, to listen to the fire department's command, and work together, *** with the extinguishing of the fire.
(E) protect the scene. When the fire occurred and after the fight is over, the command team should be sent to protect the scene, maintain good order at the scene, waiting for the cause of the accident and the responsible person's investigation, at the same time, should immediately take the aftermath of the work, clean up in a timely manner, will be classified and dealt with the garbage caused by the fire and to take other effective measures, so that the fire accident on the environment caused by the pollution is reduced to a minimum.
(F) After the fire is extinguished, the security department to assist the public security and fire departments, to identify the cause of the fire, investigate the fire damage.
Article VI fire accident investigation and disposal. In accordance with the provisions of the company's accident (incident) report analysis and processing system, the fire safety emergency command team on the investigation and review of the accident after the report out, to make the relevant processing decisions, re-implementation of preventive measures. And reported to the company emergency rescue leading group and higher authorities.
Article VII emergency materials
Standing drugs: disinfection supplies, first aid items (bandages, sterile dressings) and a variety of commonly used small splints, stretchers, hemostatic bags, oxygen bags, fire extinguishers and other fire-fighting materials.
Precautions:
1, valuable calligraphy, painting, cultural relics and important archives and other materials, once the fire can not be put out with water.
2, the specific gravity of the flammable liquids lighter than water should not be used to fight the goods, because the fire of the flammable body floating on the water, flowing everywhere, but caused the fire to spread.
3, high-voltage electrical equipment fire can not use water to fight, one is water can conduct electricity easily cause electrical equipment short-circuit burned. Secondly, it is easy to occur high-pressure current along the water column to the fire equipment, so that firefighters caused casualties.
Equipment failure emergency plan Part 3First of all, to distinguish the factors that lead to server failure:
1, external attack
2, internal attack
3, operation and maintenance misuse
Server down how to do? Server Failure Contingency Plan
Regardless of whether it is an external attack or an internal failure, a good backup, as well as redundancy measures, can minimize downtime.
The backup problem, as incredible as it sounds, is that in practice, many organizations do not have a tested backup system in place. The point of backups is that in times of crisis you can quickly restore or rebuild production systems. The problems that often occur in enterprise networks are actually:
Flawed backup steps that do not complete the backup process correctly
Subsequent backups that fail after a certain amount of time due to limited storage space
Damaged backup media that cannot be successfully recovered
Traditionally, tape has been the ideal backup system due to its low cost and high storage density, making it the ideal backup solution. storage density have traditionally made tape an ideal backup medium. However, there are several fatal flaws in this traditional backup media that often make the data it contains inaccessible:
Missing tape index cards
Tape media is susceptible to external magnetic fields during storage
Damage to the media itself
Media is corrupted by the reading device during the media reading process
Additionally, the tape backup media itself is not as good as it could be. is stored in a tape warehouse, and the time consumption to retrieve the required backup tapes from the warehouse, transfer them to the data center, and reload the data is usually objective.
Even with a backup system in place, it still cannot withstand all contingencies.
Emergency Response Plan for Equipment Failure Part 4
In the production process, the DCS system may occur communication cable cable, controller or I/O card failure, HIS operator station failure, system power failure, resulting in partial or total stop of the device, in order to minimize the loss of the instrumentation professionals should take the appropriate emergency response plan.
First, the cause of the failure:
DCS control system failure caused by the following reasons: communication cable communication interruption, controller or I / O card failure, control system power failure.
Second, the failure phenomenon:
In the DCS system failure, the DCS system will issue sound and light alarms, in the system status screen will indicate where the fault is located, and in serious cases may lead to control control out of control, the device partially or completely stopped.
Third, during the accident personnel responsibility:
Instrumentation Manager: responsible for organizing the instrumentation maintenance personnel to enter the scene overhaul processing, responsible for professional command, coordination of work, responsible for organizing the professional analysis of the cause of the accident.
DCS specialists: rushed to the scene in the first time, the DCS system failure causes for inspection, as well as the preparation of overhaul needs ` all kinds of technical information and DCS spare parts, and participate in the analysis of the cause of the accident.
Instrumentation maintenance personnel: with the process personnel to adjust the scene, and control system after the normal recovery work; with the technical staff to do a good job in the DCS system overhaul processing.
Fourth, the specific work steps:
1, once the DCS control system failure occurs or is notified, the first party must be the fastest speed to the shift manager or instrumentation professional manager report.
2, control system failure response personnel are divided into: control room emergency response team and field emergency response team two groups. The group should be clear, the field emergency response team by the instrumentation shift manager is responsible for, mainly with the process personnel on the scene to adjust and deal with on-site instrumentation failures; control room emergency response team is responsible for by the DCS specialists, mainly responsible for DCS control system failure judgment and troubleshooting.
3, instrumentation technicians should be on the control system overhaul considerations and difficult issues to participate in the overhaul of the staff for technical briefing, so that everyone has a clear idea.
4, notify the production workshop to make production adjustments and parking preparations.
5, find the cause of the failure, due to the DCS system with redundant control functions, power supply, controller and I / O card with redundancy, after identifying the cause of the failure and the location of the replacement of the corresponding equipment, replacement must be with anti-static bracelet, be careful, can not expand the fault, to avoid causing greater losses.
6, if the fault led to the device stop, with the process personnel to switch production to the field control, control valve switch to the bypass control, to be completed after the fault processing, with the process personnel to switch to the DCS control.
7, control system fault processing is completed, observe the DCS control system has been completely normal, and timely treatment of instrumentation failure.
V. YOKGAWA CS3000 DCS failure and recovery.
1, communication network (Vnet/IP network) failure: subcontrol network (BUS1), information network (BUS2) any failure to generate alarm faults will not affect the system network communication. Notify the relevant instrumentation personnel to check the network failure can be restored in a timely manner.
If the control network (BUS1) and the information network (BUS2) at the same time network disconnection:
(1) Immediately notify the workshop, plant / branch scheduling.
(2) Check the polymerization key monitoring indicators: (polymerization kettle stirring, kettle temperature, kettle pressure) operation. Check the operation status of each valve.
(3) Instrumentation engineering personnel immediately cooperate with the process plant to take appropriate safety measures to avoid further expansion of the accident.
(4) Instrumentation engineering personnel first check whether the redundant controller is operating normally, if the main controller failure, and from the controller is not normal switching, should immediately report to the relevant leaders and instructions for manual switching controller operation, switching failed to notify the scheduling to prepare for emergency stop.
(5) to ensure that the controller is normal, quickly check the status of the switch and power supply is normal, as well as the redundant controller and the switch between the engineer station, the operator station and the switch between the network connection: whether there is a RJ45 connector breakage, falling off and loose conditions, such as crystal head breakage and immediately replace the spare or the site to produce, the loosening of the immediate insertion of the tight, and then through the engineer station to check the network, test the network. Engineer station to check the network, test the network, and resume normal operation.
2, the controller or I / O card failure
(1) system redundant controller failure
a, the controller is not synchronized
Emergency methods: man will standby controller power off restart, restore synchronization;
b, a pair of redundant controller failure at the same time
Emergency methods: first look at this time which is the master, immediately switch to the master-slave controller manually. The main slave controller artificial switching, such as switching unsuccessful,
quickly report to the workshop leadership, waiting for the scheduling of the parking order.
(2) I/O card damage:
Emergency methods: a, non-redundant AIDIDO card damage, you can insert the spare card into the damaged card position, and close contact with the process, and quickly apply for the relevant overhaul ticket for replacement and configuration of a single point of down loading.
b, redundant AO card damage, timely for the relevant maintenance ticket for replacement of spare parts, unsuccessful, timely report to the relevant leadership and take measures to replace, waiting for scheduling orders.
3, operating station (HIS) failure:
(1) notify the relevant instrumentation engineering staff, inspection and maintenance.
(2) Restart the operating station is normal.
(3) The operating station can be started, the operation meet can not be started, check whether the VI701 card failure.
(4) Check if the network is faulty.
4, DCS system blackout
(1) Immediately notify the workshop, plant / branch scheduling.
(2) Check the polymerization key monitoring indicators: (polymerization kettle stirring, kettle temperature, kettle pressure) operation.
(3) Instrumentation engineers immediately cooperate with the process plant to take appropriate safety measures to avoid further expansion of the accident.
(4) Check whether the power supply for the DCS system meets the requirements (220VAC).
Check the UPS uninterruptible power supply.
If the UPS power supply abnormalities:
① UPS main circuit failure and not automatically cut to the bypass operation, contact the electrical specialty in a timely manner, and ask for instructions to the relevant leaders of the UPS to switch to the "manual bypass" of the work.
② UPS main circuit, automatic bypass, manual bypass failure or electrical power supply failure, this time should be automatically switched to DC battery power supply, power supply time should be immediately backed up DCS configuration and the various industrial computer system backup work, waiting for scheduling orders.
③ If the UPS main circuit, automatic bypass, manual bypass, battery failure, we must quickly notify the dispatch office and the relevant leaders to prepare for emergency stop.
④ If the DCS system power supply is affected by external interference, resulting in the system can not operate normally, you should first check the grounding situation, if the grounding is normal, and can not immediately remove the interference, then immediately report to the relevant leaders, and at the same time, notify the scheduling to do the parking process.
Check whether the switch supplying power to the corresponding DCS system is closed, if not, close the power switch.
(4) When the power supply to the DCS system is normal, start the control station (FCS) first.
(5) After the FCS is started, a US operating station should be started first on the operating station (HIS) group. Other operating stations should not be started for the time being, so that the startup speed of the whole DCS system can be improved.
(6) Check the status of the DCS system
(7) Start other HIS operating station
Emergency Plan for Equipment Failure Part 5Emergency Plan and Measures for Possible Accidents in the Use of Commonly Used Instruments, Equipment, and Rescue Items
(a) Emergency Plan and Measures for Sudden Accidents in the Use of the Monitor
1, the nurse on duty should be familiar with the operating procedures of the monitor and the use of performance
2, the monitor itself with a battery, usually should be regularly charged, so that the battery is always in a saturated state, to ensure that in the case of an emergency can operate normally. The department is equipped with a spare monitor, and a person regularly check its condition, to ensure that the equipment is running well, and do a good job of maintenance, maintenance registration
3, in case of accidental power outage of the monitor, equipment failure caused by the monitor can not work properly: the nurse should immediately stop using the monitor, and immediately activate the standby monitor, and at the same time, the assessment of the patient, notify the doctor. Closely observe the patient's vital signs and changes in condition, and do a good job of psychological care for awake patients
4, the faulty monitor on the "instrument failure card", and promptly notify the instrument maintenance department. Maintenance process and repair results should be registered in a timely manner for the record
5, nursing staff will be the process of emergencies and the patient's vital signs accurately recorded in the nursing record sheet
(B) the use of electrocardiogram machine in the process of sudden accidents contingency plans and measures
1, operators should be familiar with the use of electrocardiogram machine performance and operational specifications
2, the electrocardiogram machine itself with a battery, usually should be regularly charged to ensure that the accidental power outage, can operate normally. The department is equipped with a spare ECG machine, and regularly check the condition of the instrument to ensure that the equipment is in good working order, and do a good job of repair and maintenance of the registration
3, in the emergency or rescue process in the event of equipment failure, should be immediately replaced by the spare equipment, close observation of the patient's vital signs and changes in the condition of the patient, and cooperate with the doctor to complete the resuscitation measures
4, faulty ECG machine hanged with The faulty electrocardiograph hangs on the "instrument failure card", and notifies the instrument maintenance department in time. Maintenance process and repair results should be registered in a timely manner for the record
(C) infusion pumps, syringe pumps use the process of unexpected emergency plans and measures
1 duty nurse should be familiar with the use of infusion pumps, syringe pumps patient's condition, and closely observe their vital signs
2, infusion pumps, syringe pumps with its own storage battery In the process of using infusion pumps, syringe pumps, at any time to observe the dynamic changes of infusion pumps, syringe pumps, to ensure that the equipment set parameters and the actual operating parameters in line with the 3, in the event of infusion pumps, syringe pumps, such as accidental power outages, speed loss of control and other failures, the nurse should immediately stop using the equipment, while assessing the patient, notify the doctor. Routine infusion methods should be resumed, and backup equipment should be replaced in a timely manner when conditions permit. Closely observe the patient's vital signs and changes in condition, sober patients to do psychological care
4, the relevant personnel should regularly check the infusion pump, syringe pump condition, to ensure that the equipment is running well, good maintenance, maintenance registration 5, the failure of the infusion pump, syringe pump hanging "instrument failure plate", timely notification of the instrument maintenance department. Maintenance process and repair results should be registered in a timely manner for the record
(D) defibrillator use in the process of sudden accidents and measures
1, the duty personnel should be familiar with the use of defibrillator performance and use of the indications. The defibrillator should be placed at a fixed point (conductive paste supporting). Specialized regular inspection, maintenance.
2. The defibrillator itself has a battery, which should be checked weekly and charged and discharged every half month to ensure that the equipment is functioning well, so as to ensure that it can operate normally in case of emergencies. The department is equipped with a standby defibrillator, and specialists regularly check its condition. Do a good job in the use, repair, maintenance registration
3, in the use of defibrillator process, such as defibrillator accidental power outage, instrument failure to defibrillator can not work properly, the nurse should immediately stop the application of faulty defibrillator, immediately line continuous CPR, and enable the standby defibrillator, and at the same time, assess the patient, to assist the doctor to carry out other resuscitation measures
4, the failure of the defibrillator should be hung on the Faulty defibrillators should be labeled with "Instrument Failure Plate" to notify the instrument maintenance department in a timely manner. Maintenance process and repair results should be registered in a timely manner for the record
5, in the use of the process, should closely observe the patient's vital signs and changes in condition, and will be the emergence of the process and the patient's vital signs are accurately recorded in the nursing care record sheet
(E) the center of the use of negative pressure suction device in the use of unexpected contingency plans and measures p>
1, in the use of the center negative pressure suction process, to regularly review the vacuum pressure gauge is in the normal range
2, the use of the process of power outages, vacuum pressure is insufficient, equipment failure and other emergencies, you should immediately activate the standby motorized suction: open the motorized suction, connected to the drainage pipe, with the motorized suction to the patient's bedside, give suction, to keep the patient's respiratory tract, the awake patients do psychological care. The patient's respiratory tract should be kept clear, and the psychological care of the awake patient should be done well.
3, in the use of the process, closely observe the patient with or without hypoxia or other changes in vital signs, cooperate with the doctor to complete the rescue measures, and accurate records.
4, check the center of the negative pressure pressure gauge to determine whether the pressure is within the normal range, to determine the cause of failure.
5, on the failure of the attraction device should be hung "instrument failure plate", timely notification of the instrument maintenance department, the maintenance process and repair results should be promptly registered for the record.
;