City, county (city, district) people's government planning, construction, environmental protection, water conservancy and other departments in accordance with their respective responsibilities, **** with the management of urban drainage work.
The industrial parks and township people's government (street offices) in accordance with their responsibilities, with the competent authorities to do a good job of urban drainage management. Chapter II planning and construction of Article 5 of the town drainage department shall, in conjunction with the planning, water conservancy and other departments to prepare drainage planning, approved by the people's government at this level after the organization and implementation, and reported to the people's government of the previous level of the town drainage department for the record.
Drainage planning should be based on the preparation of national economic and social development planning, urban and rural planning, land use planning, water pollution prevention and control planning, flood control planning and watershed planning, and with the development and construction of towns and cities, roads, green spaces, water systems and other special planning. Article 6 The town drainage department shall, in accordance with the requirements of the town flooding, combined with the nature of the town site and conditions, to strengthen the rainwater network, pumping stations, and rainwater storage, discharge of excess rainwater runoff and other facilities construction and renovation.
New construction, alteration and expansion of municipal infrastructure projects should be supporting the construction of rainwater collection and utilization facilities, increase the green space, gravel ground, permeable pavement and natural ground on the rainwater infiltration capacity, the use of buildings, parking lots, squares, roads and other construction of rainwater collection and utilization facilities, cut rainwater runoff, and improve the prevention and control of waterlogging capacity of the town.
New construction and reconstruction of old urban areas, should be determined in accordance with urban drainage planning rainwater runoff control requirements for the construction and improvement of related facilities. Article VII new, alteration and expansion of construction projects involving urban drainage, should be implemented rainwater, sewage diversion, rainwater pipes and sewage pipes shall not be mixed; existing drainage facilities do not implement rainwater, sewage diversion, should be in accordance with the requirements of urban drainage planning, rainwater, sewage diversion transformation. Article VIII of the new construction, alteration and expansion projects supporting the construction of drainage facilities, should be designed at the same time as the main project, the same time as the construction, and put into operation at the same time. Article IX urban and rural planning departments in the issuance of construction land use planning permits, shall seek the views of the competent departments of urban drainage.
The urban and rural planning departments to review the design of construction projects, drainage design should be included in the scope of the review. Article 10 The construction unit shall be built in accordance with the drainage design program, and accept the guidance and supervision of the competent department of urban drainage.
The competent department of urban drainage found that the construction unit is not according to the drainage design of the construction organization, shall order the construction unit to rectify. Article XI of the construction unit to organize the completion of acceptance, should be supporting the construction of drainage facilities and acceptance. Acceptance, before delivery and use, and from the date of completion and acceptance of 15 days, the completion and acceptance of the report and outdoor drainage plans and other relevant information reported to the competent department of urban drainage for the record. Chapter III Drainage Management Article 12 Enterprises and institutions engaged in industrial, construction, catering, medical and other activities and individual industrial and commercial households (hereinafter referred to as drainage households) discharging sewage into urban drainage facilities shall, in accordance with the State Council's "Regulations on Urban Drainage and Sewage Disposal" and the Ministry of Housing and Urban-Rural Development's "Permit for the Management of Urban Sewage Discharged into Drainage Pipe Networks," apply for a license for sewage discharged into the drain network (hereinafter referred to as the drainage permit) from the competent department of the town network license (hereinafter referred to as drainage license). Without a drainage permit, sewage shall not be discharged into urban drainage facilities.
Residents do not need to apply for a drainage permit to discharge domestic sewage.
The competent authorities in charge of urban drainage shall not charge a fee for a drainage permit. Article 13 A drainage household that discharges industrial wastewater, medical wastewater and other wastewater or sewage into urban drainage facilities shall obtain a drainage permit before discharging wastewater or sewage, and shall apply to the competent department for environmental protection for a drainage permit in accordance with the law.
The competent department of environmental protection shall, in conjunction with the competent department of urban drainage authorities shall determine and publish a list of key sewage drainage households to the community according to law. Article XIV centralized management of buildings or units within a number of drainage households, the property rights unit can be unified application for a drainage permit, and the licensed unit of the drainage households responsible for the drainage behavior.
The various types of construction work or other construction activities require temporary drainage to the town's drainage facilities, the construction unit to apply for a temporary drainage permit. Article XV hotels, restaurants and other drainage households involved in food and beverage should be set up in accordance with the law grease trap, construction projects, car wash and other drainage households should be set up in accordance with the law sedimentation tanks and other facilities. Sewage shall be pre-treated according to regulations before discharge.