Scaffolding subcontracting 1
Party A:
Party B:
In accordance with the General Principles of the Civil Law of People's Republic of China (PRC), the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B voluntarily sign this labor service contract through equal consultation, and * * * will abide by the terms listed in this contract.
First, the object of labor subcontracting and the content of providing labor services
Project name:
Project location:
Protection of edges and holes, installation and disassembly of material platform, laying of main scaffold board, painting (paint or yellow) of all scaffold poles and grid plates, etc. , the company checks and hangs billboards, fastener scaffolding poles are cleaned in time and stacked and palletized according to regulations, and assists in erection of tower ceiling (including screw fastening) and internal column frame required by the project.
Second, the subcontract works period
Start date: year month day.
Work end date:
Third, the subcontract price
The total price of labor subcontracting is: tentative yuan.
Fourth, quality standards.
Project quality: in accordance with the quality agreement in the general contract and the current national standards and specifications such as Unified Standard for Acceptance of Construction Quality of Building Engineering and Code for Acceptance of Construction Quality of Concrete Structure Engineering. The quality grade must be qualified.
Verb (abbreviation of verb) pricing, confirmation and payment methods of labor remuneration
1, the agreed settlement price of quantities is as follows:
2. Calculation rules and confirmation of quantities:
Party B must report the completed quantities to Party A's statistician before 22nd of each month, and Party A's statistician will check and settle the reasonable quantities actually completed by Party B.. If Party B fails to submit the completed project quantity before 22nd, it shall be settled according to 95% of the completed project quantity in the current month, and the remaining 5% shall be regarded as the liquidated damages for Party B's failure to settle on time, and Party A shall not settle the account. The engineering quantity shall be calculated according to the following agreed calculation rules: after the construction content of Party B has passed the technical and safety acceptance, it shall be calculated according to the construction area calculation rules.
3. The agreement on payment of labor remuneration is as follows: according to the project payment distribution of the owner and the quantities confirmed by both parties, the main body will be paid to 70% after completion and acceptance, and the rest will be paid within one year after acceptance.
Liability for breach of contract of intransitive verbs
1. If Party B delays the completion of the project or affects the construction progress, Party B shall pay Party A RMB liquidated damages for each day of delay.
2. Party B's construction quality does not meet the quality standards agreed in this contract, and all losses caused thereby shall be borne by Party B. ..
Seven. Contract number
This contract is made in triplicate, all of which are equally authentic.
Eight, material regulations
1, shelf class is responsible for the overall management responsibility of poles, fasteners, boards, etc. When entering the site, the materials on the construction site should be piled up reasonably. If the materials are found to be in a mess during inspection, 50 yuan will be fined once, and points will be deducted for distribution. If the materials are returned after completion, each piece will be fined 15 yuan. If there are no idle fasteners on the erected shelves, a fine will be found 10.
2. If the spare materials are overstocked or redundant due to details, the details team shall bear the freight and rental fees of the spare materials.
Nine, safety regulations
1, enter the construction site must wear safety helmet correctly. If it is found that those who don't wear the safety helmet will be fined 65,438+000 yuan each time, and those who don't wear the safety helmet rope will be fined 65,438+050 yuan each time. The safety helmet should be kept clean and unwashed, and those who use the safety helmet as a working tool will be fined 50 yuan each time, or those who wear slippers and high heels will be fined 50 yuan each time and stay away from the construction site.
2. It is forbidden to work after drinking. Offenders will be fined 100 yuan each time, and severely criticized and educated to stay away from the construction site immediately. It is forbidden to make trouble and fight after drinking, otherwise the relevant teams will be fined 5000 yuan each. Causing serious consequences, it will be reported to law enforcement departments for criminal responsibility.
3. Non-professional technicians are strictly prohibited from climbing any vertical transportation machinery such as scaffolding and material hoists. Anyone who breaks the rules will be fined 200 yuan every time.
4. Safety protection facilities and safety signs shall be erected and installed in time with the construction progress. If the erection is unqualified and the installation is not timely, it will be fined 100 yuan; if the safety protection facilities, devices and safety signs are dismantled or misappropriated without authorization, it will be fined 100 yuan per person.
5. During the construction, if it is necessary to move the safety protection facilities and safety signs such as limb and hole, it must be approved by the project leader or safety leader in writing, and the safety protection facilities and safety signs will be reset in time after the operation is completed. Otherwise, 200 yuan will be fined every time it is found.
6, material hoist and other non-master cheng yen construction machinery are strictly prohibited manned operation. If found, 500 yuan will be fined, and the material hoist operator will be fined 200 yuan.
7. When using electricity for construction, you can't connect it without permission. You can find the electromechanical personnel yourself or contact the site management personnel to inform the electromechanical team members to pick up the electricity. In case of violation, each person will be fined 100 yuan.
8. It is forbidden for any construction personnel to throw construction waste on the protective flat net. If found, each person will be fined 100 yuan, and littering will be cleaned up.
9. It is forbidden to dismantle all flat nets and vertical nets. If it needs to be dismantled, it must be signed in writing by the project leader or safety leader, otherwise 500 yuan will be fined.
10, scaffolding must be fully paved, and there is no single board or empty board. Every time it is found, it will be fined 100 yuan. Those who demolish the wall without reason will be fined 100 yuan each time. 50 yuan will be fined if the net connection is tight or loose. Support does not meet the requirements, fine 100 yuan.
1 1. If problems are found during regular inspection, those who fail to rectify after notifying the ZuoYeDui will be fined 50 yuan, those who fail to rectify will be fined 100 yuan, and those who fail to rectify for many times will be fined 500 yuan.
12. The site must be cleaned up after the work, and every time it is not cleaned up, it will be fined 100 yuan, and 500 yuan will be fined if it is not cleaned up after the notice is issued.
13. All personnel leaving the site must obey the inspection of the guards. Violators will be fined 100~500 yuan depending on the seriousness of the case, and criminal responsibility will be investigated in serious cases; Those who do not obey the inspection shall be reported by the security personnel to the project leader immediately or directly to the "1 10" public security organ.
14, it is strictly forbidden to misappropriate everything on the site, and it is strictly forbidden to steal items on the site. Violators will be fined 100~ 1000 yuan according to the situation, and serious cases will be reported to the company's security department or law enforcement department for handling.
15. Strictly implement various rules and regulations, prohibit illegal operations, and strictly abide by labor discipline and various operating procedures, otherwise the accident will be at your own risk, and criminal responsibility will be investigated in severe cases.
16, keep a record of safety activities before shift in time, and those who fail to fill in carefully during inspection will be fined 100 yuan.
17, it is strictly forbidden to destroy the visual culture of tianyuan group such as billboards, otherwise it will be fined twice the original price.
X. supplementary provisions
1. Party B shall strictly abide by the management rules and regulations of the construction site, abide by the safety technical operation rules, conscientiously implement the safety production regulations, and do a good job in site civilization.
2. If the contract cannot be completed due to Party B's reasons, and the contract is terminated midway, the engineering quantity shall be confirmed as 80% of the completed engineering quantity.
3. Because Party A's funds are temporarily unavailable, Party B shall not affect the normal construction, otherwise Party A has the right to terminate the contract, and Party B shall compensate the losses caused thereby.
4. Party B must abide by the system of site construction, technology, materials, statistics and safety in the annex, otherwise Party A has the right to demand fines and compensation from Party B. ..
5. If a safety accident occurs due to Party B's improper operation or failure to wear safety protection articles as required, all expenses incurred shall be borne by Party B. ..
Date of conclusion of the contract: year month day.
Contract signing place: site office
This contract shall come into effect after Party A affixes the "Special Seal for Labor Contract of tianyuan group No.9 Company" and Party B signs it by handprint.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Scaffolding Labor Subcontract 2
Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and trustworthiness, both parties reach an agreement on the subcontracting of labor services for this construction project and conclude this contract:
I. Overview of the Project:
1, project name: Buildings 26# and 27# of Longqiwan Community on Jinxiu River in Songyuan City.
2. Project Location: ningjiang district, Songyuan City, Jilin Province
3. Owner: Songyuan Shenghengxiang Real Estate Development Co., Ltd.
4. Construction period: April, 20 years 15 to 20 years 10/30.
5. Quality requirements: qualified products.
6. Building area:
1, 3151.62m2 on the second floor of the commercial podium.
2.26# Building 12083.37 m2
Building 3.27 is 8304.33㎡.
4. Basement 4655.8 1 m2
The final engineering quantity shall be subject to the final construction area.
Second, the scope of contracting:
Scaffolding project: the main project, secondary structure and ancillary projects require real double-row shelves, installation, support, reinforcement, finished product protection and the demolition of all scaffolding and hangers. Placement and classification of buckle with tubing. On-site civilized construction, on-site safety production, civilized construction, etc. All need odd jobs.
3. Contracting method: The contractor does not include materials, but includes labor, construction period, quality, safe production and civilized construction.
Four. Contract price and settlement payment method
1. Contract price: 13 yuan/m2 (construction area). All scaffolding works in this project are calculated at this unit price. Please refer to the tender announcement for the payment method and site management requirements.
Verb (abbreviation of verb) technical and quality requirements:
1. Party B shall be equipped with management personnel with comprehensive skills and strong overall awareness, technical personnel who know drawings and master the current national construction specifications, and corresponding mature construction organization and management personnel.
2, strictly implement the relevant construction specifications, engineering quality must be qualified. If the rework fails to meet the standard, Party B will bear the labor cost and will not postpone the construction period.
3. If the construction is suspended for any reason, Party B shall unconditionally and properly protect the completed project. According to the reasons for the shutdown, Party A and Party B shall bear the corresponding expenses.
Six, safety in production:
1, the safety target of this project is 0 accident. Party B shall strictly implement the national production safety laws and regulations, put an end to illegal operations and strengthen safety education. Party B shall take full responsibility for all safety accidents on site. All safety accidents of Party B's personnel outside the construction site have nothing to do with Party A. ..
2. Party B must be equipped with qualified labor protection articles according to regulations.
Seven, civilized construction
1. Provide the working site and construction drawings, and Party B shall be responsible for the maintenance during the construction.
2, material classification, pipe rack neat, palletizing, stacking, buckle classification, bagging (oil support). Do "clean up the scene after work". And ensure the cleanliness of the construction site and the surrounding environment. If Party A arranges cleaning, the expenses incurred shall be borne by Party B. ..
3. It is forbidden to play in the construction site, and it is forbidden to work after drinking. Party A will be severely punished for fighting and homework after drinking.
4. Use water and electricity for living and construction in strict accordance with Party A's requirements. In case of malicious waste of water and electricity, Party A will impose heavy penalties according to the seriousness of the case.
Eight, materials and equipment management:
1. The material supply plan is submitted by the project team to the technical director of Party A for approval, and then transferred to the material department of the company for procurement. After the materials enter the site, the warehouse keeper of Party A and the materials group will jointly accept them and send them to the materials group at the same time.
2. Party B shall bear the part where the material consumption exceeds the quota.
3, the rational use of materials, the team should actively protect and care for materials, reduce losses and waste. In case of malicious destruction of materials, serious loss, waste and theft, Party A will punish Party B for its management negligence.
4. The operators of Party B shall use and operate the mechanical equipment provided by Party A in accordance with the operating rules.
Nine. Other agreements:
1. In the following circumstances, Party A has the right to unilaterally terminate the contract and refuse to pay the labor service fee for the project completed in the early stage. Party B will unconditionally quit and bear all losses;
(1), the short-term image progress is delayed for more than 3 days;
(2) Failing to comply with Party A's safety production, civilized construction and quality requirements management, and still failing to meet Party A's requirements after repeated rectification;
(3) The labor force of Party B is insufficient to meet the requirements of Party A. ..
2. When the progress of Party B's image is delayed but should not be withdrawn, and Party A thinks that Party B can't catch up with the work, Party A has the right to temporarily contract out some construction contents to other labor teams at a high price to facilitate the work. Party B must accept and support this part of labor costs unconditionally.
3. When Party A appoints Party B to complete this project and other work outside this project, Party B shall unconditionally accept and complete Party A's assignment ... The labor costs incurred shall be calculated separately and included in the settlement price of this contract.
4. The construction period of key lines is delayed due to Party A's reasons, and the construction period is postponed. Party A shall compensate the economic losses caused by Party B's slowdown.
5. Party B must pay the workers' wages in full and on time. If there are sufficient reasons and proof materials can't be released in time, Party A will pay the wages of the laborers from Party B's project funds, and the wages will be deducted from Party B's project funds twice.
X. Matters not covered in this contract shall be settled by both parties through negotiation or a supplementary contract shall be signed. The construction contract signed by Party A and the construction unit and the construction contract signed by Party A and other subcontractors, including the lease contract of Party A's related materials, are all annexes to this contract. Annexes and supplementary contracts have the same effect as this contract. Party B unconditionally undertakes the obligations promised by Party A to the construction unit in the construction contract.
XI。 This contract is made in triplicate, two for Party A and one for Party B. It will come into effect after being signed by both parties, and will automatically become invalid after the project is completed and the quality deposit is paid. Party A has the final right to interpret this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Scaffolding Labor Subcontract 3
Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Party A will contract the "Hui Di Mingyuan Project" of Hunan Xindi Group Development Co., Ltd., the project below the building (hereinafter referred to as the project) and the external scaffolding division project to Party B for construction. According to the relevant provisions of the Labor Law, both parties agree to the following terms through consultation and comprehensive consideration of the actual situation of this project:
I. Project address:
II. Contract Contents: High-rise Building and Basement
Scope of contract: erection and demolition of outer frame above basement foundation (basement includes repeated demolition and erection and cleaning, etc.). ): I-beam manufacturing, painting, installation and removal; Installation and removal of unloading platform: safety shed protection, mixer shed, steel bar production shed and carpentry shed; All safety protection; Such as four mouths and five sides; It also includes construction tools and labor insurance supplies.
Three. Settlement method and contract price
1. Calculate the engineering quantity according to the actual construction area, so that (the contract work does not include materials). In addition to the above-mentioned contract contents, the contract price also includes labor and shift fees for cleaning up the site after demolition (such as arranging safety nets), cleaning up steel pipes and fasteners, and transporting materials into the site, night simple construction allowance, holiday overtime allowance, "three insurances and one gold", labor insurance supplies (labor insurance supplies are purchased by both parties, and Party B claims and bears the expenses), welfare fees, summer defense fees, etc. (Hourly work is calculated as daywork 150 yuan/workday, and daywork 120 yuan/workday).
2. The contract price is the final settlement price, taking into account the market price factor and the price adjustment factor of the superior documents. No matter how the market price changes in the future, this price will not increase or decrease.
Four. mode of payment
For every fourth floor of the residential building, 45% of the contract price shall be paid according to the actual engineering quantity, and so on until it is capped. After the external decoration is completed, dismantle the frame in time, and pay 45% of the contract price for every five floors, and so on: pay 90% of the balance after the external frame is completely dismantled. Party B shall ensure that wages are paid to migrant workers in time, and Party A shall provide the last wage payment form for migrant workers when paying, otherwise Party A may take corresponding measures at any time.
Verb (short for verb) duration
Time limit for a project ensures that the outer frame will be erected and dismantled in time according to the progress of the project (the specific time will be arranged by Party A's construction operation plan), and 200 yuan will be fined for each day of delay, and so on.
Six, quality standards
Carry out the construction in strict accordance with the safety production specifications and design scheme. If the construction is not carried out as required, Party B shall pay the rework fee.
Seven. For details about safety management, please refer to page 4 of the General Conditions, which has the same legal effect as the terms of this contract.
Eight. Performance bond
1. Party B must pay the performance bond in RMB (in words) before signing this contract.
2. The performance bond paid by Party B shall be returned to Party B without interest after the main body is capped. The above terms and conditions shall come into effect after being signed by both parties, in duplicate, one for each party, with the same legal effect, and will automatically become invalid after the project is settled and the above money is paid. the general terms and conditions
I. Qualification of employees in this project:
1. Party B shall know about the migrant workers to be employed in this project;
(1) Resolutely reject people of unknown origin:
(2) Abide by the law and have no criminal acts and criminal records;
(3) Good health and moral quality, meeting the relevant requirements of the labor laws of People's Republic of China (PRC) and China;
2. Party B shall accompany the newcomer to report to Party A, and submit a copy of the original ID card and two recent one-inch upper body photos. Women of childbearing age should also provide family planning certificates and gynecological examination certificates for Party A's record, otherwise, labor relations will not be established.
3. The migrant workers who Party B intends to invest in this project must accept the physical examination and skill examination of Party A before they can take up their posts.
(1) eyesight (2) hearing (3) proper physical exercise and skill examination. Check the problem or controversy, sent to the hospital at or above the county level for re-examination.
4. Conduct pre-job safety education and safety disclosure;
5, familiar with the project site situation;
6. Only Party A who meets the above conditions can register and file migrant workers and handle "industrial injury insurance" and "accidental injury insurance" for free before they take up their posts. It is strictly forbidden to go to work without handling insurance-related procedures;
7. If Party B violates this article 1 to 6 and recruits migrant workers to work in this project without authorization, it will be regarded as illegal employment of Party B, and Party A will not recognize the labor relationship between its employees and Party A in this project. Once found, each person will be fined 2000 yuan and driven away from Party A's construction site in time. In case of any safety accident, regardless of the size, Party B will bear all economic and legal responsibilities.
Second, safety.
1, strictly abide by the construction site safety management system and safety technology operating procedures;
2. Party B shall provide safety education and technical disclosure to employees before work every day (Party B is the first responsible person).
3. Wear safety helmet and work shoes, and dress neatly.
4. Employees under 18, female employees over 55 years old and male employees over 60 years old are not allowed to be employed, or they will be dealt with according to the relevant regulations of the Ministry of Labor, and each person will be fined 1,000 yuan and driven away from Party A's construction site. If you cheat or conceal your age, you will be punished twice.
5. People suffering from heart disease, hypertension, acrophobia, obvious disability and congenital defects are not allowed to enter the construction site.
6. Those who don't wear safety helmet and work shoes are not allowed to work, otherwise each person will be fined 50 yuan, which will be deducted from the progress payment paid to Party B. ..
7. Party B shall bear the economic expenses and all civil liabilities for the accidents caused by illegal operation in violation of general safety regulations (1-6).
Three. If the employee of this project meets one of the following conditions, the labor relationship with Party A will be automatically terminated:
1, leaving the post without authorization for more than 15 days.
2. Working at Party A's construction site while working at other construction sites affects Party A's project and work;
3. Since the date when Party B's contracted project scope is completely completed;
4. Since the date of completion and acceptance of this project;
5. Party B seriously violates Party A's labor discipline and refuses to change it after being put forward by Party A..
Four. Responsibilities of both parties:
Party A's responsibilities:
1, provide a set of relevant construction drawings and related materials.
2. Provide construction materials in time, and pay the project progress payment in time according to the contract requirements to ensure the normal construction of Party B. ..
3. Assign the person in charge of on-site construction to inspect, accept, supervise and make technical disclosure on the construction quality of the project.
4. Handle accident insurance and industrial injury insurance for Party B's employees free of charge, but Party B's employees shall submit two copies of their ID cards to Party A in time when they enter the construction site.
Party B's responsibilities;
1. Obey the arrangement of Party A, humbly accept the quality and safety supervision of Party A, the project owner and relevant departments, abide by the relevant rules and regulations of Party A, and submit the original valid employment certificate to Party A..
2. Read the familiar drawings carefully, construct in strict accordance with the design requirements and relevant codes and standards, and rectify and deal with safety and quality hidden dangers in time. Bring your own walkie-talkie and safety director.
3. It is forbidden for Party B's construction personnel to stay at the construction site, and it is forbidden to run a canteen at the construction site. The place of residence and expenses shall be borne by Party B. ..
4. All construction personnel of Party B shall strictly abide by the relevant rules and regulations of Party A and conduct civilized construction. Consciously handle the relationship between the team and the group, and do not quarrel or fight with others for any reason. If there is a fight between Party B's personnel, Party A will impose a fine of more than 1000 yuan on the team and bear all economic and legal responsibilities; Both sides leave immediately and unconditionally.
5. Party B shall sign family planning contracts with all migrant workers, and bring all relevant certificates, such as ID cards, birth check-up certificates for women of childbearing age, certificates, etc.
6. All personnel entering and leaving the construction site should consciously accept the inspection by Party A's security personnel (it is forbidden to bring children into the construction site), and those who refuse to accept the inspection or violate it will be fined 50 yuan every time. If it is found stolen, the penalty is ten times the value of the stolen goods, which will be deducted when Party B pays the progress payment. If the circumstances are serious, it will be handed over to the relevant departments for punishment according to law.
7. For the safety accidents caused by Party B's reasons or the illegal operation of Party B's personnel, Party B shall bear the legal responsibility, which has nothing to do with Party A. Those who don't wear safety helmet and work shoes are not allowed to take up their posts, otherwise each person will go to 50 yuan every time; In case of serious violation of safety management during construction, a fine of 500-20 yuan will be imposed, which will be deducted from the progress payment paid to Party B. ..
8. Party B shall pay the wages of all migrant workers in time, and submit the salary table of the previous salary when paying the next salary, otherwise Party B shall bear all economic and legal responsibilities.
9. If Party B fails to complete the project with good quality and quantity on schedule (the construction schedule of this project), Party A has the right to unilaterally terminate this contract at any time, and settle the payment according to 60% of the actual workload completed by Party B after the completion of this project.
10. During tower crane operation, the team shall negotiate in advance and report to the construction team for approval, and then obey the unified deployment arrangement of the construction team. It is forbidden to seize the tower crane. In case of seizure, the relevant team will be punished by 300 yuan each time.
Five, the above two parties signed in duplicate, each party holds one copy, which has the same effect.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple scaffolding labor subcontracting related items:
★ Scaffolding subcontracting template
★ 3 simple scaffolding contract templates
★ 5 simple labor contracts
★ 3 Template of Scaffolding Labor Contract
★ Simple external scaffold contract template
★ 3 Simple steel pipe scaffold contract template
★ Scaffolding labor service contract
★ Template of external scaffold labor contract
★ Simple Labor Subcontract Template
★ External Scaffolding Labor Contract Template (2)