With the passage of time, there are more and more types of contracts, and signing a contract can make both parties promise and perform cooperation in a standardized way. I believe everyone is worried about writing another contract. The following is a simple version of the woodworking contract template I compiled for you, which is for reference only and I hope it will help you.
Simple Woodworking Cleaning Contract 1 Party A: Labor Service Company (hereinafter referred to as Party A)
Party B: Team (hereinafter referred to as Party B)
According to the needs of Party A's construction task, through friendly negotiation between Party A and Party B, on the basis of equality, mutual benefit and friendly cooperation, Party A contracts Party B to manufacture, install and dismantle the formwork in the form of internal labor settlement. In order to clarify the responsibilities and rights of Party A and Party B, this agreement is specially signed for both parties to abide by and implement. The specific terms are as follows:
I. Project Name: Template Installation and Dismantling
Second, the project address:
Third, the structure type:
Four. Building area:
5. Contracting methods: contract settlement, contract quota acquisition, contract quality, contract safety, contract progress (contract duration) and contract civilized construction.
VI. Contents and requirements of the contract:
Template engineering:
1, horizontal and vertical transportation of floor and floor formwork, supporting materials and fasteners; As well as the horizontal elevation (inside and outside) of formwork installation in structural layer (coordinate with construction setting out, except axis).
2, according to the design drawings or template sample diagram processing template, before installing the wall, column, beam, site casting template is clean, protect the template when pouring concrete. According to the construction drawings and acceptance specifications for template installation. After the installation, the garbage in the formwork shall be cleaned and the concrete expansion caused by formwork erection shall be eliminated. Scratch and repair the main structure, etc. Template every two layers brush isolation agent.
3. The formwork shall be dismantled, cleaned, corrected, material specifications and models, transported to the designated place, stacked, and nails on the laminated board and wood square pulled out. Support and removal of concrete guide wall formwork, installation and removal of sporadic component formwork (including all small formwork and constructional column formwork, etc.). ), design disclosure, leaving holes according to the drawings, and plugging holes for installation (including sewer holes and flue holes, etc. ); Placement of embedded iron parts (including fabrication and installation of all prefabricated templates and reserved boxes; Manufacturing of reverse screw, etc. Manufacture and placement of stair tread protection template);
4. All formwork works must meet the requirements of the city's high-quality structure. The maximum joint width of formwork shall be controlled within 10mm, and the surface of formwork shall be kept clean when it is used for turnover to ensure the appearance quality of concrete.
5. Civilization standardization and cleaning within the scope of work.
6. The design institute and the construction unit change the project and increase or decrease the engineering quantity.
7. Safe and civilized construction within the scope of contracted projects. Productive temporary construction and demolition, etc.
Seven, subentry contract unit price:
serial number
Unit price of project name
(Yuan/actual area) Remarks
Excellent safety progress and civilized construction sporadic materials (nails, etc.). )
1 formwork fabrication and installation ㎡ concrete contact area
2 template removal ㎡ concrete contact area
Description:
1. There are no other hourly workers within the contracted construction scope. If the quality standard required by Party A cannot be met, the settlement shall be 80%.
2. This unit price includes tax (4. 16% tax is deducted at the time of settlement); Among them, business tax is 3.56% and personal income tax is 0.6%.
3. This unit price has included quality, safety, progress, civilized construction, tool costs, etc. In case of safety accident, 3 yuan/㎡ shall be reduced; If the construction period can't meet the requirements of the project department, the current quantities will be reduced by 3 yuan/㎡; Civilization construction can not meet the requirements of the project department, 3 yuan/㎡.
4. Woodworking tools, including all tools used in construction, shall be the responsibility of Party B (electric drill, electric hammer, portable wood planer, sporadic tools, etc.). ).
5. Sporadic materials shall be provided by Party A (Party A shall determine the content according to the quota, and Party B shall use it according to the regulations, and the general contractor shall be responsible for the excess).
Eight, engineering quality standards: excellent rate 100%, high-quality structural engineering in Henan province. According to the quality requirements, the contractor team must carry out the construction of each process in strict accordance with the quality acceptance standards and construction specifications of concealed works. After each working procedure is completed, the team must first conduct self-inspection and mutual inspection, and then notify Party A, the general contractor and the supervision unit for acceptance. After acceptance, the next working procedure can only be carried out if it meets the quality standards. Can not meet the quality standards, must be in accordance with the acceptance of the rectification measures and requirements for rectification, until the standard. If the rectification still fails to meet the requirements, Party B must bear the double fine imposed on Party A by the general contractor as compensation for Party A's reputation.
Nine. Duration requirements: If the total duration of days (according to the progress of Party A's unit) cannot be completed within the required duration, the general contractor will pay liquidated damages to Party A, which will be doubled according to the total contract price of Party B. The contractor of the operation team must guarantee the duration and be fined 10000 yuan for each calendar day delayed.
X. Safety requirements and integrated management;
1, each contracting team must seriously study and master the safety production management regulations and operating procedures, and construct in strict accordance with the safety operating procedures. Violation of safety operation procedures, illegal operation, resulting in safety accidents, the violator shall bear all the responsibilities.
2. Strictly abide by the laws and regulations of the country and Henan Province, obey the command of the general contractor and Party A and other relevant departments, and consciously abide by and implement the rules and regulations of the general contractor and Party A. If the expenses caused by safety accidents in the construction process are less than 3,000.00 yuan, the team will pay it, and Party A who is less than 3,000.00 yuan-10000 yuan will be responsible for half, and 10000 yuan or more. More than 20,000 safety accidents shall be handled with the assistance of the safety department.
3. All relevant documents for the contractor to enter the construction site must be complete, and copies and rosters shall be submitted to Party A for the record.
4. When entering the construction site, you must use and wear all kinds of safety protection articles correctly, wear safety helmet and fasten your seat belt. It is found that those who don't wear safety helmet and seat belt will be fined 10 yuan/person, and those who violate the safety operation rules and dismantle the safety protection without the consent of the competent department will be fined 50- 100 yuan.
5. It is forbidden to pull wires in the dormitory, and it is forbidden to cook in the dormitory. Once found, in addition to the confiscation of cooking utensils, 200 yuan will be fined once.
6. Fighting and gambling are strictly prohibited. If found, both parties will be fined 500- 1000 yuan. Then according to the investigation results, the responsible party shall bear all the losses of the other party, and the serious cases shall be handed over to the judicial department for handling.
7. It is forbidden to mix men and women in the dormitory, and it is forbidden to bring family members to the construction site. Family members, a fine of 500.00 yuan/person, mixed living, a fine of 1000.00 yuan/person; Without the consent of the competent department, off-duty personnel shall not stay overnight, and 200 yuan shall be punished for each discovery, and public property shall be taken care of, and various facilities shall not be damaged.
8. Party B shall be responsible for all public security incidents outside the construction area.
XI。 Party A's responsibilities:
1. Be responsible for the technical disclosure of quality, safety, progress, civilized construction and operation specifications to Party B. ..
2. Evaluate Party B's construction ability, personnel quality and technical quality after entering the site, and give Party B a 30-day probation period. If Party B fails to meet the requirements of quality, progress, civilized construction and comprehensive management during the probation period, Party A has the right to unilaterally terminate the agreement, and the engineering quantity will not be settled as compensation for Party A's reputation loss. Party B shall compensate Party A for its economic losses.
3. According to the site conditions, Party B shall provide accommodation and the expenses shall be borne by Party B (the electricity fee is 30 degrees per month, and the excess shall be deducted at 1.00 yuan/degree).
4. Actively create construction conditions for Party B and do a good job of coordination.
5. Supervise and inspect the quality, safety, progress and civilized construction of Party B, and put forward rectification opinions and measures for those that do not meet the requirements. If Party B's rectification fails to meet the requirements or refuses to rectify, Party A has the right to send someone to rectify, and the expenses will be deducted from Party B's labor expenses at twice the amount of rectification work.
Twelve. Party B's responsibilities:
1. Organize the corresponding construction personnel according to the contracted quantities. Personnel entering the site must be reasonably matched. They are men aged 18-45, with good ideological quality, strong technical ability and no health diseases and infectious diseases. Each contracting team has a comrade with strong organizational ability, good technology and strong sense of responsibility as the team leader, forming a systematic management. At the same time, without the approval of Party A's on-site supervision, the team leader shall not leave the site and actively participate in relevant meetings organized by Party A or the general contractor. Anyone who leaves the site without authorization or does not attend the meeting he should attend will be fined 50- 100 yuan/time.
2. Be familiar with the construction drawings, organize the construction in strict accordance with the Code for Construction and Acceptance of Building and Installation Engineering and the design requirements, and ensure the quality, progress and safety of the project. If the rework fails to meet the quality standards due to poor management, it shall bear the resulting loss of quantities and construction period.
3. The personnel entering Party B's site must be relatively stable, and team members shall not be changed at will without Party A's consent. ..
4. Accept Party A's technical disclosure, education and supervision on quality, safety and civilized construction, and obey the command.
5. The rectification opinions put forward by Party A shall be immediately rectified by personnel until reaching the standard.
6. Take good care of the facilities and equipment provided by Party A, and do not damage them at will. If there is any damage, compensation and punishment shall be paid at twice its value.
Thirteen, civilization standardization, health requirements:
1, do a good job in personal, dormitory, site hygiene, keep civilized and clean at any time.
2. Carefully classify, standardize and neatly stack the materials within the contracted scope according to the requirements of civilized and standardized model construction sites and high-quality structural standards.
3, after the completion of each working procedure, must do a good job of cleaning up after work, can use the materials must be used.
4 can not meet the above requirements, according to its nature, scope and value, impose a fine of more than two times, each at least not less than 20 yuan.
5. This project is an accident-free construction site, ensuring the standardized, safe and civilized construction site in Zhengzhou. If the municipal standardization cannot be achieved, Party B will be fined 5.00 yuan/building area for the safe and civilized construction site.
6. The safety accidents caused by the ZuoYeDui shall be the responsibility of the ZuoYeDui, and the losses caused to Party A shall be compensated by the ZuoYeDui.
7. The operation team must have detailed safety education and inspection records.
8. Personnel entering the construction site shall have uniform work clothes and badges, and the expenses shall be borne by the operation team.
Fourteen, material management:
1. Party B shall, in accordance with the requirements of standardized and civilized construction, classify and stack the materials in its contracted area neatly. After each working procedure is completed, the site must be cleaned, and usable materials must be used.
2. After completion, repair and clean up the circulating materials, remove the nails on the laminated board and the batten, pile them up neatly at the designated place, and submit them to the on-site materials clerk of Party A for acceptance. Party A's on-site materials clerk fills in the acceptance document, and both parties sign it as evidence of project settlement. If Party B fails to handle this procedure, Party A will deduct the template area of 0.50 yuan/㎡ from the settlement.
3. Party A strictly implements the system of receiving and returning materials for the materials supplied by Party B (all kinds of turnover materials are consumed according to the quota, and the fastener loss rate is1%; Shanka loss rate 3%). If Party B fails to return the delivered quantity, it will make full compensation according to the market price. (including material waste and labor loss caused by Party B's poor support for expanding die)
Fifteen. Supply of facilities and tools:
Except for large mechanical equipment provided by Party A, small equipment and tools are provided by Party B (including helmets for shift workers, etc.). ).
Sixteen, labor settlement and payment:
1. In order to ensure the quality and progress of the project, each construction team should pay a deposit of 3,000-5,000 yuan to Party A when signing the contract. After the completion of the project, if the quality and progress meet the requirements of Party A, the expenses will be returned to Party B in one lump sum.
2. After Party B enters the site, the self-funded living expenses of the project will reach 0.000 yuan; In the future, Party A will pay Party B a monthly living allowance of 650 yuan/person (calculated by attendance).
3. Settlement method: calculated according to the actual area. After the structural stage is over (all the small formwork is removed), the subcontractor shall pay 80% of the total settlement price of Party B (including borrowing living expenses and fines). After the structural engineering is completed and accepted (all templates are dismantled and cleaned), 10% of the total price shall be paid according to the unit price and total price of the corresponding quality grade (the quality standard shall be subject to the approval of the quality inspection station), and 10% shall be used as the project deposit. Pay to Party B after renovation.
4. During the construction period, if the work is stopped for more than 7 days due to Party A's reasons, and other work cannot be arranged on site, Party A shall pay Party B the basic living expenses per person per day 10 yuan.
Seventeen. Others:
1. When the team enters and exits (including any form of midway exit), Party A will settle accounts according to the qualified quantities produced by Party B, and will not bear any other expenses.
2. If there are any matters not covered in this agreement, Party A and Party B shall sign a supplementary agreement through consultation.
3. This Agreement is made in triplicate, with Party A holding two copies and Party B holding one copy.
4. This agreement shall come into force from the date of signing until the project payment is paid in full.
Party A: Party B:
Person in charge: Manager:
date month year
Simple Woodworking Cleaning Contract 2 Decoration Worker:
(hereinafter referred to as Party A)
Decoration enterprise:
(hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC), the Measures for the Administration of Residential Interior Decoration of People's Republic of China (PRC) and the Ministry of Construction and relevant regulations, Party A and Party B enter into this contract through consultation.
A, decoration construction projects
1, decoration project site:
2. Building structure:
3. Decoration construction contents and requirements: [See attached tables 1- 1, 1-2: Confirmation Tables of Family Room Decoration Project (I) and (II) for details;
Attached Table 2: Design Drawings of Family Room Decoration Engineering in duplicate, one for Party A and Party B respectively and one for confirmation by both parties].
4. Project contracting method: Both parties agree to adopt the following methods.
Types of contracting methods:
(1) Contractor and contractor of Party B (see Appendix 5: List of Decoration Materials Provided by Decoration Enterprises for details);
(2) Party B's packaging, some packaging materials and some materials provided by Party A (see Schedule 4: List of Decoration Materials Provided by Decorators for details);
(3) The contractor of Party B and the contractor of Party A, that is, the contractor (see Schedule 4: List of Decoration Materials Provided by the Decorator for details).
Second, the project cycle
The construction period is days, the commencement date is: MM DD YY, and the completion date is: MM DD YY.
The following conditions are confirmed by the Employer, and the project will be postponed accordingly:
(1) engineering quantity change and design change;
(2) Force majeure;
(3) Other circumstances in which the Employer agrees to postpone.
If the project changes through negotiation between both parties, the project will be adjusted accordingly.
Third, the project cost and payment method
1, total project cost: (in words) (in figures) yuan,
Among them: design fee RMB, management fee RMB and tax RMB (see Annex 3 for details).
2. Payment method: Three days before the commencement date agreed in the contract, Party A shall pay 40% of the total project price in RMB, and the rest shall be paid in installments according to the construction progress plan;
(1) 40% of the total price shall be paid before the carpenter enters the site, RMB;
(2) The painter shall pay 17% of the total price before entering the site, RMB;
(3) Pay the balance of 3% in one lump sum after the project acceptance. Cleaning works should be paid in one lump sum before construction.
If the project cost is adjusted due to the change of engineering quantity and design scheme, it shall be settled according to the final accounts of the project after the project acceptance.
Both parties will issue invoices or official receipts for currency transactions.
Fourth, the supply of materials and equipment
1. See the attached table for the materials and equipment provided by Party A:
The materials and equipment purchased and supplied by Party A in this project must meet the national quality standards and environmental protection standards, otherwise, Party B will not be responsible for the quality problems and other problems caused by this. Materials supplied by Party A shall be delivered to the site according to the construction progress, accepted and signed by Party B, and kept by Party B. If losses are caused by improper storage, Party B shall be responsible for compensation.
2. Materials purchased by Party B:
All materials and equipment purchased by Party B must conform to the brand, specification, model and quality indicated in the quotation, and submit a test report to the owner, including environmental protection test data.
The materials and equipment purchased by Party B must meet the national standards, otherwise Party B shall be responsible for the losses caused to the project; If the materials and equipment purchased by Party B are designated by Party A, Party B will not be responsible for any quality problems.
Simple Woodworking Cleaning Contract 3 Contract Issuing Unit: Party A for short.
Contractor: Party B for short.
According to the agreement of both parties, Party A and Party B will contract out the formwork division project to Party B, and sign a construction agreement according to the actual situation of the project. The specific provisions are as follows:
First, the project contracting construction content
1. Requirements for carpentry in construction:
First of all, we should be familiar with the construction drawings carefully, and conscientiously implement the change information, technical disclosure and safety disclosure issued by the project department;
During the construction process, check the completed quantities against the specifications in time every day, rectify them in time, and put an end to rework;
Have the guiding ideology of saving materials, carefully prepare the template project labor contract agreement, and issue a list of rental materials; After the construction of each working face, the remaining materials should be cleaned up to the original stacking place in time;
There should be the guiding ideology of civilized construction, so that materials can be neatly stacked, and materials can not be thrown down from the floor after demolition;
Every day, the construction tools should be cleaned and put in storage, and the whole woodworking area should be cleaned;
During the construction, after the formwork is dismantled, it shall be cleaned, renovated and demoulded, and stacked in the designated place by classification to keep the site and roads clear;
During the whole construction process, the carpenter's monitor always coordinated the work at the site, and there were always technical managers on site to cooperate with the project department for quality and safety inspection, supervision and management. The carpenter monitor of Party B is and the technical administrator is.
In the whole construction process, all materials that need to be transported vertically by tic-tac-toe frame and tower crane should follow the arrangement of the project department and shall not be operated by themselves;
Cooperate with other projects, such as cooperating with plumbers to leave holes and grooves on the wall and ground;
Take good care of the safety protection facilities provided by Party A, stop working at the parts with potential safety hazards, and promptly notify the project department to take measures to eliminate potential safety hazards;
2. Party A only provides Party B with the following tools: a) dump truck b) scooter c) tower crane d) derrick e) high stool f) springboard.
Small machines and tools, safety helmets (belts) and labor protection articles, such as safety helmets (belts), raincoats, rubber shoes, gloves, ash buckets, shovels, pickaxes, wall lines, chisels, hammers, brooms, etc., that Party B provides and buys. Except the carpenters provided by Party A, all carpenters must carry all construction machinery, including concrete surface grinding machinery and tools and supplies for chiseling concrete.
Second, the construction period requirements:
1. The commencement date is subject to the commencement date of Party A's visa.
2. The total construction period is days, and the completion date is year month day.
The specific construction progress shall be implemented in strict accordance with the schedule arranged by Party A and completed on schedule. Construction period from pouring concrete cushion: c: calendar days; B: calendar days; A: Calendar days.
Third, the overall construction requirements:
According to the construction drawings, construction instructions and changes of this project, the acceptance specifications and relevant supplementary provisions of construction and installation projects issued by the State Construction Committee shall be implemented, and the specific acceptance specifications and relevant supplementary provisions shall be implemented.
Fourth, the progress quality rewards and punishment:
1. Party A arranges the master schedule on site. If it cannot be completed as scheduled, it will be fined 100 yuan for each day of delay and 100 yuan for weekly schedule.
2, the project main template disciplines must ensure the quality of the main structure, such as template division can not meet the main quality, the main body 2 yuan /m2, the main body acceptance for an evaluation.
3. If quality problems are found in the construction process, they must be reworked and redone in time, and the price of reworked materials will be compensated by five times.
4, where the quality, safety and civilized construction problems in the project, the site builder has the right to make penalties, fines deducted from the living expenses or wages.
V. Safety standards:
In the process of construction, this project must be carried out in strict accordance with the technical operating rules for building safety promulgated by the state.
6. All building materials used in this project shall be supplied by Party A to the construction site. If the materials cannot be provided in time, Party A and Party B shall negotiate for visa extension.
Seven, the project contract price is as follows
(1) The main structures of workshop unit C/㎡ and workshop unit B/㎡ are of good quality; If painting is not done, it shall be settled according to workshop C/㎡ and workshop B/㎡. Workshop A is tentatively scheduled to be constructed by Party B. If the construction quality of workshops B and C can't reach the high-quality subject, Party A has the right to contract out to other teams. The template contract price of Factory A is RMB/㎡. Those who do well in quality, etc., will be awarded 0.5~ 1 yuan/㎡. If it is not done well, it will be deducted more than 0.5~ 1 yuan/m2 (2). Party A has the right to arrange other teams to carry out construction according to the actual situation, and the unit price of each division project will be deducted from the total price according to the above unit price.
(3) Before the construction of each division, Party A and Party B must sign a construction agreement separately. If the division does not sign the construction agreement, the division will not settle the account.
2. The living expenses shall be paid according to the project schedule arranged by Party A, and the specific monthly living expenses shall be paid according to the actual attendance of each type of work every month, calculated at 15 yuan/day. The living expenses shall be signed by the site management personnel and reported to the project management department for approval. Labor wages should be paid more than 70% of the completed workload before the Spring Festival, and the balance should be settled within one year.
3. After the project is completed, the remaining entertainment expenses will be paid off gradually within one year.
Nine, comprehensive social management:
1, all construction personnel must have physical certificates and handle all necessary documents, and abide by all management regulations.
2. Accommodation is civilized, and it is forbidden to mix men and women in the dormitory. If a fine of 1000 yuan is found, it is strictly forbidden for family planning offenders to stay or work in the dormitory.
3. Party A shall provide dormitories for construction workers, and any construction workers shall not move into the newly-built building, and 500 yuan shall be fined once.
4. Connect the power supply and burn the rice cooker, electric wok, electric stove, etc. And found a fine 500 yuan.
5. Dining rooms in living quarters are not allowed to cook by themselves, and lunch boxes are numbered uniformly. The canteen should be clean and free of mosquitoes and flies. According to Party A's hygiene requirements, the workers are responsible for the division of steaming and cooking, and obey the unified command of the project department. Party B arranges the hygienist to be responsible for the hygiene of the living quarters, canteens and toilets.
6. The total price of this project includes labor cost, temporary residence permit fee and health and epidemic prevention certificate fee.
Ten, on-site civilization management:
1, all construction personnel must wear safety helmets and seat belts before entering the construction management, and it is forbidden to wear slippers and be shirtless.
2. Keep the site clean, clean up all construction wastes in time, and clean the temporary construction roads daily.
3. After the completion of the construction machinery, it should be cleaned and oiled, all tools should be placed in the designated position, the car should be put in order, the distribution box should be locked, the keys should be kept by special personnel, the tic-tac-toe frame should be opened by special personnel, and the power supply should be cut off. If the above situation is not found as required, it will be fined 100 yuan/time.
4. If the electric machinery used by each team is artificially damaged due to rain, the team shall bear the responsibility and compensate for the repair cost.
5. Everyone will be fined 500 yuan for fighting locally. If the circumstances are serious, Party A has the right to hand it over to the public security organ and order it to leave the scene.
6, each type of work is responsible for their respective types of work materials neatly stacked and cleaned up.
7. On-site civilized construction and material waste shall be fined according to the requirements of the person in charge of on-site construction. Those who waste materials shall be fined five times the cost of materials.
XI。 Others:
1, 60% of the completed workload will be paid for breach of contract on the way, and all personnel will be evacuated from the construction site within three days. Party A re-arranges the construction team to enter the site, and the expenses shall be borne by Party B. If Party A breaches the contract after completing the main project alone, the main project shall be calculated as 60% of the total cost.
2. Party A and Party B shall earnestly perform this agreement, which is made in quadruplicate, one for the contractor, and shall come into effect after being signed by both parties.
3. Other matters not covered shall be settled by both parties through consultation.
Party A's signature (seal): Party B's signature (seal):
Year, month, sun, moon, sun.
;