Occupational health and safety measures of engineering department?

While cooperating with the safety production work of the project department, it is clear that all technical personnel of the engineering department should bear the safety responsibilities in production activities, improve safety awareness, ensure safety and health in the production process, ensure the safe and smooth progress of the project and improve economic benefits. The safety production work of this department takes the minister of engineering department as the first responsible person, and all technicians must be responsible for the realization of safety production in this position. Each ZuoYeDui should have a full-time safety officer to take charge of safety, and cooperate with technicians to seriously implement policies, decrees, regulations and rules related to safety in production. The specific implementation is as follows: (1), the technical personnel define the division of responsibilities for occupational health and safety, formulate a detailed responsibility system and send it to the safety officer of the construction operation team. (2) Before the project starts, safety measures shall be formulated and safety technical disclosure shall be made. (3) Check the quality of construction safety protection facilities and safety devices, such as danger indication and identification marks. (4), safety personnel to develop fire prevention and fire control measures. According to the construction situation, equipped with adequate fire fighting equipment and facilities. Make relevant arrangements, equipment records and warning signs on site. (5), technical personnel and construction personnel must wear safety helmet when mount guard. (6), technicians insist on monthly inspection of ZuoYeDui construction safety management, and summarize the inspection results in the project department. (7) Prevention and control of natural disasters: In the period of frequent natural disasters, set up disaster prevention and flood control teams, formulate protective measures and implement protective responsibilities. The project department purchases emergency materials and daily necessities in advance. In case of disaster, emergency preparedness and response procedures should be strictly observed.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd