According to (JGJ59-99) Safety Inspection Standard for Building Construction and its requirements, the following project safety information catalogue is compiled: 1. Basic information of the project: 1, general situation of the project:-general situation of the project AQ2.1.2, safety management organization chart of the project department- List of project managers -AQ 2. 1.3 4. List of project management personnel and relevant certificates of five persons II. Safety production responsibility system: 1, project safety production responsibility system 2, safety production responsibility book of all kinds of personnel in the project-complete signature 3, assessment method of safety production responsibility system 4, general subcontractor safety production responsibility book-complete signature 5. Safety technical operation procedures for each type of work in the project 6. List of safety management personnel, full-time and part-time safety officers and safety organizations of the project department. 7. Safety production indicators in economic contracting. Safety production responsibility system assessment summary table -AQ2.2. 1.9, safety production responsibility system for managers -AQ 2. 2. 1. 1 0, safety production responsibility system for operators-aq2.2.1,safety assessment-aq2. Formulate the management objectives of safe and civilized construction of the project department (casualty control indicators and safety standards, civilized construction objectives) 2. Decomposition of project safety control indicators. Project objective evaluation method 4. Safety production management objective assessment summary table -AQ2.2.2.5. Safety production management objective assessment table -AQ2.2.3 IV. Construction organization design 1. Approved general construction organization design, special construction scheme 2, construction organization design (special construction scheme) submission form -AQ 2. 12. 1 3, highly specialized project special scheme and safety measures, attached to the submission form -AQ 2. 12. 1 1, temporary construction site. B, foundation pit supporting scheme; C, earthwork excavation construction scheme; D, pile foundation construction scheme; (Manual digging pile, bored pile, static pressure pile, hammering pile, etc. E. Special project plan for civilized construction; F, tower crane (construction elevator, derrick) installation (demolition) scheme g, formwork engineering construction scheme (high formwork scheme); H, scaffolding construction scheme; I, engineering transformation, temporary building construction scheme; J, emergency rescue plan measures on the construction site emergency rescue plan approval form-AQ2. 12.2 V, safety technical disclosure of divisional and sectional works 1, safety technical disclosure system 2, safety technical disclosure of divisional and sectional works (disclosure requirements are targeted and comprehensive, and signature procedures are complete) and special safety technical disclosure of special parts 6. Safety inspection 1, regular safety inspection system 2. Daily safety inspection records and construction safety diaries; 3, hidden dangers rectification notice, rectification record, inspector's signature. 4, JGJ59-99 building construction safety inspection scale (project department twice a month, the company once a month). Seven, safety training and education 1, safety training and education system; 2. Summary Table of Level 3 Safety Education for New Workers Admission -AQ2.5. 1 3. Registration Form of Three-level Safety Education for New Workers -AQ2.5.24. Company Safety Education Record (Level 1) -AQ2.5.2. 1 5. Safety education record of project department (level II) -AQ2.5.2.26, safety education record of team (level III) -AQ2.5.2.37, safety education registration form of change work -AQ2.5.38, safety education and training registration form of operators -AQ 2.5.4 9. Registration form of safety education and training for managers -AQ 2.5.5 10. Emergency personnel safety education and training registration form -AQ 2.5.6 165438+. Test scores 12, contents of workers' safety education 8, pre-shift safety activities 1, pre-shift safety activity system; 2. Record of safety activities before shift -AQ 2.6. 1 IX. Special operations management 1. Management system for special operators; 2. Registration Form for Special Operations Personnel -AQ 2.7. 1 3, copy of special operations personnel certificate and operation certificate; Operators must hold relevant certificates. (Electrician, welder, mechanic operator) Registration Form for Special Operators X. Industrial accident file 1, industrial accident handling system and accident handling reporting system; 2. Work-related accident registration form -AQ2.8. 1 3. Quick report of construction casualties -AQ2.8.2 4. Summary of documents related to accident investigation and handling (table format) 5. Accident insurance registration form -AQ. Safety warning board 1, safety warning board layout -AQ 2.9. 1 or no table type 2, construction site safety warning board checklist-AQ2.9.2 xii. Construction electricity consumption 1, temporary electricity consumption management system 2. Approved temporary electricity consumption plan (see III. Special construction scheme) 3. Technical disclosure of temporary electricity safety. List of temporary electrical equipment on the construction site -AQ 2. 6. 7-5. Electrician's patrol maintenance record -AQ2.6.8 6, grounding resistance test record -AQ2.6.97, electrical circuit insulation strength test record -AQ2.6. 108, inspection record of temporary electrical equipment on the construction site-AQ2.6.1+0/kloc-0. 2, scaffolding special scheme to submit for approval table -AQ2. 12. 1 3, scaffolding safety technical disclosure 4, scaffolding foundation acceptance table-AQ2.10.2.1.65438+fastener steel pipe scaffold acceptance table-AQ2./kloc- Template special construction plan to submit for approval table -AQ 2. 12. 1 3. Safety measures for concrete pumping; 4, template engineering safety disclosure; 5, template engineering acceptance record -aq2. 10.2.26, concrete test strength report. 7. Template Demolition Approval Form-aq2.12.3xv. Three treasures and four doors 1. Application certificate for production license, certificate of conformity and safety protection (safety helmet, safety belt, safety net, steel pipe, fastener, leakage switch and electric shock protector). 2. Summary table of product quality certification documents-aq2.11.13. Entry inspection registration form for safety protection articles -AQ 2. 10. 1.4. Inspection and maintenance records of safety protection appliances. 6. Acceptance record of limb and portal protection -aq2. 10.2.3 XVI, small and medium-sized equipment management 1, small and medium-sized equipment management system 2. Registration form of mechanical equipment entry inspection-aq2.10.23, equipment installation acceptance record 4. Mechanical equipment inspection and maintenance record-aq2.6.13x17. (1) construction elevator, 1, safety management system and post responsibility system, safety operation procedures, fixed maintenance system 2, construction elevator instruction manual 3, equipment lease contract 4, qualification certificate for installation and removal of vertical transportation equipment 5, approved construction elevator equipment installation, addition and removal scheme 6, and safety disclosure for construction elevator installation (removal, attachment and addition). 7. Equipment and facilities inspection summary table -AQ 2. 1 1.28. Installation acceptance data A, product certificate B, equipment production license C, foundation concealed acceptance record-quality table D, concrete strength test report E, construction elevator foundation acceptance record-none table F, construction elevator installation acceptance record-aq2.10.16 g, construction elevator joint installation acceptance record-aq2.10. Verticality observation record I, grounding resistance test record J, insulation resistance test -AQ 2. 6. 17 fixed maintenance system 2, tic-tac-toe frame operation manual 3, equipment lease contract 4, qualification certificate for installation and disassembly of vertical transportation equipment 5, approved tic-tac-toe frame equipment installation, addition and disassembly scheme 6, construction tic-tac-toe frame (demolition) safety disclosure and complete signature. 7. Equipment and facilities inspection summary table -AQ 2. 1 1.28. Installation acceptance data A, product certificate B, equipment production license C, tic-tac-toe frame installation acceptance record -AQ 2. 10. 1.4d, verticality observation record E, grounding resistance test record F, operation record, inspection and maintenance record G, construction elevator operation certificate, operation certificate 17 (3), tower crane. 2. Instructions for use of tower crane. Equipment lease contract. Qualification certificate for installation and disassembly of vertical transportation equipment. Approval plan for installation, addition and disassembly of tower crane equipment. Carry out safety technical disclosure on tower crane installation (demolition, wall attachment, jack-up and addition), and complete signature. 7. Equipment and facilities inspection summary table -AQ2. 1 1.28. Installation acceptance data A, product certificate B, equipment production license C, foundation concealed acceptance record-quality record table D, tower crane foundation acceptance record table-none table E, concrete strength test report F, tower crane installation acceptance record table -AQ2. 10. 1.9g, tower crane installation acceptance record table-aq2.10. 3. Five certificates and one picture (without table) 4. First-aid measures on the construction site 5. First-aid personnel registration form-AQ 2.13.36. Environmental health information A, health management system B, environmental health management measures C, on-site living area management system D, dormitory health management system E, dormitory management rewards and punishments, assessment system F, canteen health management system; G, kitchen staff health certificate registration form-AQ 2.13.5h, canteen hygiene license 1, in addition to the "four pests" contract; 7. Fire information A, fire safety management system B, acceptance form of fire control facilities on the construction site -AQ2. 13.6c, registration form of key fire control parts on the construction site -AQ2. 13.7d, registration form of fire control leading group and volunteer firefighters -AQ2. 13.4e, fireman training record -F, hot work approval system G. 9, the guard system, visit registration system; 10, dust prevention and noise pollution prevention measures on the construction site 1 1, noise, dust prevention measures, noise and environmental protection declaration and approval form. 12. Implement the responsible persons (public security, fire protection, family planning) and sign the responsibility letter. Safety disclosure is required before foundation pit excavation: technical disclosure of foundation pit excavation safety and foundation pit support scheme. Deep foundation pit needs expert demonstration scheme.