What is "Lee Tae"? Where is the new one?

Using advanced German technology, stainless steel parts are implanted in granite to realize connection and fixation. Without changing the structural characteristics of stone curtain wall, it is directly connected with the main keel (wall) through special pendants (three-dimensional conditions), and at the same time, material processing standards and on-site construction and assembly are formulated.

What's new? The new dry-hung curtain wall fully meets the evaluation standard of green building. Green standards are buildings that save resources (energy, land, water and materials) to the maximum extent, protect the environment and reduce pollution, provide people with healthy, applicable and efficient use space, and live in harmony with nature.

1. welding-free, reducing the emission of harmful gases during welding; 2.80% is processed in the factory and 20% is assembled, which greatly improves the engineering quality; 3. Reduce steel consumption by 30% to reduce pollution;