The Capital Gymnasium was built in 1968, with a construction area of about 53,000 square meters, which can accommodate17,500 people. As a comprehensive multi-functional gymnasium, it is one of the important sports and cultural venues in Beijing.
The architectural layout of the Capital Gymnasium is hierarchically arranged according to its functions. In addition to the competition hall, there are three practice halls and six audience lounges. The spectators mainly enter the competition hall from the south, east and west outdoor steps through the lounge on the second floor.
The first floor is the area for athletes, referees, staff and distinguished guests. There are also radio, audio, television relay, fax, timing and scoring, air conditioning and other equipment in the museum. The competition hall of the gymnasium can be used for table tennis, badminton, volleyball, basketball, gymnastics, ice hockey, figure skating and many other sports activities? Map location: The competition venue is 88m long and 40m wide, and consists of 2 1 raised floor; Each raised floor is 30 meters long and 3.5 meters wide. Below the floor is the skating rink. As soon as the machine is started, the floor can be withdrawn from the east to the west, descending layer by layer and entering the floor warehouse.