Introduction of Shenzhen Metro Grand Theatre Station

The main structure of Grand Theatre Station is a two-story underground cast-in-place integral frame structure, which is constructed by cut and cover. The total construction area is 120 16 square meters. The basement of the station is the lobby floor, and the basement is the platform floor. Adopt island platform. The total length of the station is 245.4m, and the screen door136.5m. ..

The color of the decoration design of Grand Theatre Station is sky blue to reflect the cultural atmosphere and spiritual civilization construction, and to express the connotation of "the story of spring" and "entering a new era".

The long-term early peak passenger flow of Grand Theatre Station is 34 129, and the designed passenger flow is 44368/ hour. There are four escalators and a vertical elevator from the platform floor to the lobby floor.