Road construction agreement 1 party a: xxx company
Party b: xxx club
In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:
A, build a 6-meter-wide maoji highway from Team 3 in Sanbei Village to Team 12 in front of Huangfashu to the dam in front of xx brick house in Li Jiawan, Chongfo Village.
Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1: 2. The land area of xxx field of No.12 Society of Beicun is * * * with xx mu, and the square field cultivated by No.1 Society of Chongfo Village has been replaced.
3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.
Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.
5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.
Party A: X Club, Chongfo Village, Longshi Town
Party B: X Society and X Society in Sankuai North Village, Longshi Town.
Representative of Party A (signature): Representative of Party B (signature):
Certified by: xxx Certified by: xxx
20xx x month x day 20xx year x month x day
Article 2 of the Road Construction Agreement Party A: xxxxx Association
Party B: xxxxx Association
In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:
A, build a 6-meter-wide maoji highway from Team 3 in Sanbei Village to Team 12 in front of Huangfashu to the dam in front of xx brick house in Li Jiawan, Chongfo Village.
Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1: 2. The land area of xxx field of No.12 Society of Beicun is * * * with xx mu, and the square field cultivated by No.1 Society of Chongfo Village has been replaced.
3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.
Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.
5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.
Party A: X Club, Chongfo Village, Longshi Town
Party B: X Society and X Society in Sankuai North Village, Longshi Town.
Representative of Party A (signature): Representative of Party B (signature):
Certifying party: XXXXXXXX Certifying party: XXXXXXXX
Year, month, sun, moon, sun.
Dear villagers, brothers and sisters, friends from all walks of life in Goupitan,
Hello!
First of all, let me sincerely greet you and wish you good health, all the best and a happy family!
In the past 20xx years, your work will be smooth sailing, your career will flourish, your life will be satisfactory and your career will be full of vitality. Learning must be improved every day, and the position must be steadily promoted.
From Taiping Tea Farm to Moziwan, there is a section of the road for the elderly to pick healthy water, which is still uneven. It is very difficult to walk at present, and it is extremely unsafe for the elderly to walk this road. Therefore, it is our common wish to build a healthy road from Taiping Tea Farm to Moziwan. To this end, the Party branch of the Private Association and the Goupitan Branch of the yuqing county Chamber of Commerce actively raised funds for the construction of this healthy road, calling on all members of party member and the Chamber of Commerce to save money and donate 3,000 yuan. The action was strongly supported by the town party Committee and government, and 20 tons of cement were solved. However, due to the project budget of more than 30,000 yuan, the funding gap is large. It is difficult to implement the construction only by relying on the party branches and chambers of commerce of individual private associations. We must rely on everyone's strength and cohesion to build a healthy road. Here, the Party branch of the Private Association and the Goupitan Branch of the yuqing county Chamber of Commerce issued an initiative: fellow villagers, brothers and sisters and friends from all walks of life take active actions, give generously and donate enthusiastically. Dear fellow villagers, brothers and sisters, friends from all walks of life: we are deeply honored by your support and response, and the fellow villagers are very grateful! Let's wish the old people a long and healthy life on this healthy road. We look forward to your support and await your good news.
Article 4 Owner of Road Construction Agreement: County Agricultural Machinery Supervision Station
Contractor: Yang Haicang
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, Party A subcontracts the rural road construction project from Shangcheng Town of Saisishi Town to Mazatang Village to Party B, who is responsible for the construction. Following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the construction of this construction project, and defined the rights and obligations of both parties, and entered into this agreement through consultation.
I. Overview of the Project
Project Name: Rural Highway Construction Project from Shanggu Town to Mazatang Village, Saisisi Town
1, subgrade length 5 km, pavement width 3. 5 meters, with a total decoration area of 1.75 million square meters, and the bid price of 30,000 yuan.
2. The road surface is 5 kilometers long and the road surface is desertification 3. 5 meters, thickness 15 cm, total desertification area 17500 square meters, bid price120,000 yuan.
3. Laying four culverts with a depth of 3. 5 meters, the winning bid amount is 20,000 yuan.
Project content: subgrade treatment, sand surface, small bridge and culvert, shoulder cultivation.
Second, the scope of project contracting
Scope of contract: all contents of construction design.
Three. Project price and payment method: total agreed price (in words): RMB one hundred and sixty thousand Yuan only (RMB): 65,438+600,000 Yuan.
The project price shall be paid in installments according to the progress of the project, and the final accounts shall be made after the project is accepted. Party A shall deduct 5% of the total project price as quality deposit, and pay it to Party B after the project is completed without quality defects.
Four. Rights and obligations of both parties:
1. Party A shall provide the drawings, and Party B shall carry out the construction according to the drawings and technical specifications of the highway reconstruction project, and ensure the quality is qualified.
2. Party B must start work within 3 days from the date of signing the agreement.
3. Party A has the right to supervise and manage Party B's construction, and Party A shall inspect and accept Party B's construction according to the construction progress, and the construction of the next working procedure can be carried out only after it is qualified.
4. Without the consent of Party A, Party B shall not change the project manager, otherwise, Party A has the right to terminate the agreement.
5. Party B shall not subcontract the project without the consent of Party A. Otherwise, once verified, Party A has the right to terminate the agreement and will not bear any legal responsibilities arising therefrom.
6. During the construction period, Party B shall ensure the construction safety. In case of work-related injuries and other safety accidents, Party B shall be responsible. If Party B's construction causes damage to the property or personal of the state, collective and individual, Party B shall be responsible for compensation.
7. Party A is responsible for coordinating and handling disputes in the construction process.
8. All taxes and fees required for the construction shall be borne by Party B. ..
Verb (abbreviation of verb) liability for breach of contract:
1. Party B must complete the project on time, otherwise, Party B shall pay a penalty of 1000 yuan/day for each day overdue.
2. If Party B terminates the agreement halfway, Party A will not compensate for the investment in the previous construction, and the project price allocated by Party A will be returned by Party B. ..
3. If Party A's acceptance of the project quality is unqualified and needs to be reworked and repaired, Party B will unconditionally rework and repair it until it reaches the required standard, and the losses shall be borne by Party B..
4. If Party A terminates this Agreement without reason and causes losses to Party B, Party A shall be responsible for compensating Party B for the losses. If the quality of the project does not meet the standard and needs to be reworked and repaired, and Party B refuses to rework and repair, Party A has the right to terminate the agreement and terminate the contract relationship, and the investment loss shall be borne by Party B, and the project price allocated by Party A shall be returned by Party B. ..
VI. Term of the Agreement:
Commencement date: September 25th, XX.
Completion date: XX year165438+1October 25th.
The total calendar days of the agreed construction period is 60 days.
Seven, quality standards
Engineering quality standard: qualified.
Eight, the contractor promises to the employer to carry out the construction and completion in accordance with the contract, and undertake the project quality warranty responsibility within the quality warranty period.
IX. The Employer promises that the Contractor will pay the agreed price and other payments in the time limit and manner agreed in the agreement.
X. Entry into force of the Agreement
Date of signing the agreement: April, XX 18.
Signing place of the agreement: Saisisi Town, Tianzhu County
This agreement shall come into force after being signed and sealed by both parties.
Employer: (official seal)
Contractor: (official seal)
Article 5 of the Road Construction Agreement Party A: Youmacun Formation of Matouqiao
Party B: Shaoyang Jinma Mining Development Co., Ltd.
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B have reached the following agreement on Shaoyang Jinma Mining Development Co., Ltd. (hereinafter referred to as Party B) using the land of Youmacun Formation in Matouqiao Town to build an 8-meter-wide traffic road:
I. Coverage: Youmacun Formation.
Two, land occupation compensation and payment methods:
Building roads is a good thing for the benefit of local people and should be supported by the majority of villagers. Now the company makes appropriate compensation for land occupation, and the compensation amount is 1 period (see the attached table after calculating the compensation amount).
Three. Relevant rights and obligations: After signing this contract, Party A guarantees that:
1. Fully cooperate with Party B to measure the forestland area and ensure the normal road construction of Party B;
2, responsible for cleaning the ground attachments, trees, etc.
3. Party A shall cooperate unconditionally to deal with problems such as obstruction of villagers in the construction process.
4. After the road construction is completed, Party B's enterprise shall enjoy the right to use the road free of charge, and Party A shall not obstruct the passage or charge any fees for any reason such as dust and noise.
5. After the road is completed, Party B will often carry out irregular maintenance work, and Party A shall actively cooperate and shall not obstruct it.
6. Party B guarantees that the road section will be hardened in the spring of 20xx, starting from the date when the construction is completed and it passes smoothly. If Party B fails to harden the pavement within the specified time limit,
Party B has the right to control this passage until Party B hardens the pavement, and Party A has no other reason to block the road.
Four. Liability for breach of contract: If Party A breaches the contract, it shall return the land occupation compensation paid by Party B and bear all the economic losses caused to Party B; If Party B breaches the contract, Party A will not refund the land occupation fee and enjoy the right to dispose of the land again.
5. This agreement is made in triplicate, one for each party and one for the local government. This agreement shall come into force as of the date of signing.
Six, during the performance of the contract, in case of matters not covered, both parties shall settle them through consultation. If negotiation fails, a lawsuit can be brought to the court.
Signature (Seal) of Party A
Party B (seal)
legal representative
Witness signature.
Article 6 of the Road Agreement: Wu Changsheng, Wu Changgui, Wu Jinlin and other five people turned from the main road of this group to the driveway on the roof of Li Zigui's house and built two branch roads, all of which occupied Wu Shihua's paddy fields.
The first branch road was built in front of Wu Changsheng's bungalow circle, and Wu Changsheng was still repairing the circle outside as the termination boundary.
The second branch road is built to Wu Jinlin's house.
In view of the above situation, there are naturally three parties, namely, Party A, Party B and Party C. The first branch, Wu Changsheng and Wu Changgui, are Party B, and the second branch, Wu Jinlin, are Party C. Party A and Wu Shihua, who have been fighting for rice fields, have reached the following agreement through voluntary negotiation with the above three parties, namely, Party A, Party B and Party C, and consciously abide by it.
1, Wu Changsheng and Wu Changgui occupied Wu Shihua's paddy fields by building roads, so they used their land in Lin Jinzhu, running from the front of Wu Shihua to the big stone and from behind to Wu Shihua's osmanthus tree. They built a 4-meter-wide road before and after, in exchange for Wu Shihua's paddy field. Wu Shihua has regarded the land behind the road as the road built by his family.
2. Swapped the paddy fields occupied by Wu and Wu Jinlin with Wu's land at the foot of the old road.
3. Wu Changsheng must be rounded as the termination boundary, and no one is allowed to repair it, otherwise Wu Shihua will block the branch line of the ditch bridge.
4. Because the branch roads built by Wu and Wu Jinlin are long, no one is allowed to connect any road section. If someone picks up the road, Wu Shihua will block the road in the original paddy field.
For the above agreement, Party A, Party B and Party C must have their own opinions. Please cooperate, otherwise, don't say that you are not affectionate.
6. This Agreement is made in sextuplicate, with each party holding one copy.
Party A (signature):
Party B (signature):
Party C (signature:
20xx BC1October16th.
Article 7 of the Road Construction Agreement: Party A and Party B reach an agreement on the road construction from Huawu Group to Wuwu Section through consultation, and hereby conclude the following agreement.
I. Project scope:
1, concrete walls are poured from the east corner to the west corner of the five groups of ponds, and the bottom width is 0. 8 meters, width 0. 4 meters, high-grade pavement is 0. 1m, one pier every 5m, 1m * 1m and one shrinkage joint, cement c25 standard conch, sand slag are mixed according to the standard, and soil in the pond is taken to fill in the blanks.
2. Earthwork: The fifth and fifth groups have cleared all cubes in the mountain boundary and pulled them to Lijialongkou for filling. The filling side of Wangjialong Garden has also been cleared and pulled to Lijialongkou. The whole road surface has been leveled and compacted, and the side ditch has been cleaned.
3. Seven culverts are 29 meters, of which reinforced culverts are 40 Ф 3 meters and 30 Ф 2 meters, and the service office is installed smoothly.
4. The stone pendulum in the east corner of Wuwutang has an average length of 8 meters and a width of 40 centimeters, and the road surface is smooth.
2. The total project cost is sixty-three thousand eight hundred yuan only. The completion date is before the twentieth day of the twelfth lunar month this year (fifteen effective working days).
3. Payment method: 40% of the project cost was paid on the road site, and 40% of the project cost was successfully paid for the concrete wall. After the completion of the whole project, except for 4000 yuan as quality guarantee (quality guarantee is 1 year), it will be paid in full.
Four. Responsibilities of both parties: Party A shall be responsible for the surrounding contradictions during the construction period, and Party B shall be responsible for the construction safety. In case of work-related accidents, Party A will not be responsible.
This agreement is made in triplicate, one for each party, and one for the village committee, which shall come into effect as of the date of signature.
Representative of Party A:
Signature of Party B:
Date of signing this agreement: year month day.
Party A: 72 households in Natun, Guobu Village, Shali Township.
39 households in Jialutun, Guobu Village, Shali Township
4 1 household, Sun Na Village, Guobu Village, Shali Township
Party B: Natun Luotinghai, Guobu Village, Shali Township.
Li Dajun, Sun Na Village, Guobu Village, Shali Township
In order to improve the traffic conditions of Party A's three villages and improve the living standards of the people, Party A's people actively raise funds and plan to build a village-level highway from Nataotun in Na Ba Village to the three villages of Nao, Lv Jia and Sang Na in Guobu Village. In order to ensure the smooth implementation of the project, Party A entrusts Party B to manage the use of funds raised by the masses, and Party B is responsible for assisting the Shali Township Government to coordinate road construction. In order to clarify the rights and obligations of Party A and Party B, the following terms are reached on the road construction agreement through full consultation between both parties.
1. The total mileage of Tunji Highway built by the masses of Party A in Santun is about14km. The masses of Party A voluntarily raised 260,000 yuan, of which the masses of Jia and Lu Cun were responsible for raising 6.5438+0.8 million yuan and the bereaved were responsible for raising 80,000 yuan. Party A will hand over the fund-raising funds to Party B and the staff appointed by Shali Township Government for management, which will be mainly used for road construction and related forest compensation expenses.
2. Party B shall cooperate with the township government to strive for the financial support of the county poverty alleviation project for the lack of funds for road construction. If the project funds obtained are too small to meet the needs of the project, Party B will solve it by itself. If Party B obtains sufficient project funds,
After the completion of the highway, the remaining funds will be controlled by Party B, and the masses of Party A have no right to participate.
3. The road that the masses of Party A need is from the village-level road in Taotun village to Na, Jia and Na villages in Guobu village. If there are no special circumstances, it is required to complete the road within 4 months. After the road is completed, it is necessary to ensure that agricultural vehicles can run normally (except those affected by rain and landslides in the later period), and at the same time, drainage ditches and drainage culverts should be built.
4. The paddy fields occupied by villagers in Na Ba Village due to road construction shall be replaced by adjacent paddy fields by the villagers who lost their villages by Party A.. Na Ba village people occupy the dry land discount, compensation from fund-raising. Road construction occupied the paddy fields of other people in Guobu Village. First of all, the village committee does mass ideological work for free. In case people in the occupied area are unreasonable, they will be compensated at an appropriate discount from the fund-raising. If the road construction occupies the economic forest or timber forest in other villages, Party B shall coordinate with the township government to compensate for the discount, and the compensation fee shall be paid from the funds raised by Party A. The road construction occupies the economic forest or timber forest, paddy field or dry land owned by the people in the third village of Party A free of charge.
5. After Party B and the township government personnel coordinate the construction team to enter the site for construction, Party A will deposit 260,000 yuan into the account designated by Party B on the second day after the start of construction for road construction. The project payment must be paid under the supervision of the staff appointed by the township government.
Six, in the process of highway construction, the masses of Party A should actively cooperate with Party B to do a good job of coordination and forest compensation inventory to ensure the smooth implementation of the project.
Seven. Matters not covered in this agreement shall be settled by both parties through consultation.
Eight. This agreement shall come into effect after being signed by the representatives of both parties, and it is hoped that both parties will strictly abide by it. In case of breach of contract, the breaching party shall compensate the other party for losses and pay a penalty of 20% of the total project cost.
Nine. This agreement is made in triplicate, one for each party and one for the township government.
Party A: Signature of the representative of Natun people in Guobu Village:
Signature of the representative of the masses in Guobu Village, Jialutun:
Signature of the representative of the person who lost his life in Guobu Village:
Party B: Representative of Natun in Guobu Village:
Funeral Representative of Guobu Village:
Supervisor: representative of the staff of Shali Town Government:
Time of signing the agreement:
Place of signing the agreement:
Then there is the compensation agreement of Tunji Highway.
Party A: Shaliyao Town People's Government (collectively referred to as Party A)
Party B: Chen Hongxing and others in Shuanglongtun, Longhua Village, Shali Township (hereinafter referred to as Party B). In order to ensure the smooth implementation of the so-called Tunji Road in Guobu Village, Party A sent personnel to conduct on-site investigation with Party B on 20xx65438+February 24th, and both parties reached the following agreement on relevant compensation matters.
1. Party B shall support Party A to build the Tunji Highway in Guobu Village to ensure the smooth implementation and timely completion of the highway.
2. According to the calculation, this highway occupies Party B's dry land1577.2m and 30 paulownia trees. The specific data are: Chen Hongxing dry land is 434.7M, and Liang Yongping dry land is 1 13M.
22222 dryland, 573M dryland in Simomo, Liang Yong Companion 1 16.5M dryland and Guo Tong.
30 plants, 340 meters dry land of Momingyang Lake.
3. Compensation standard and amount: The dry land will be compensated at a lump sum of 6.82 yuan per square meter, and each tung tree will compensate 2 yuan, and the sweet potato loss and soil leveling fertilizer fee will be appropriately compensated. The specific compensation is: Chen Hongxing: 3,014 yuan and 70 cents (30 14.7 yuan), including 2,964.7 yuan for dry land and 50 yuan for sweet potato; Liang Yongping's household: seven hundred and ninety-one yuan (7,965,438+0.0 yuan), of which 7,765,438+0.0 yuan was the compensation for dry land, and the sweet potato lost to 20 yuan; Simomo households: 42,077.90 yuan (4,207.9 yuan), including 3,907.9 yuan for dry land compensation and 300 yuan for sweet potato and fertilizer compensation; Liang Yong companion: eight hundred and fifty-four yuan and fifty cents (854.5 yuan), including 794.5 yuan for dry land compensation and 60 yuan for tung fruit compensation; Momingyang Lake: Twenty-four million and one hundred and eighty-eight yuan and eighty cents (24 18.8 yuan), of which the compensation for dry land is 23 18.8 yuan and the loss of cassava is 100 yuan. Compensation for several households 1 1286.9 yuan.
Fourth, the payment method of compensation. After signing this agreement, Party A shall pay Party B in one lump sum before 20xx 1 month 10.
5. This agreement shall come into force as of the date of signing, and both parties shall strictly abide by it. In case of breach of contract, the breaching party shall compensate the other party for all losses.
6. This Agreement is made in duplicate, with each party holding one copy.
Dear folks and people from all walks of life,
Located at the southern tip of xx County, xx Village is a veritable remote mountain village, and it is also the farthest village in the township with the worst traffic conditions. For many years, people in xx village have been trapped on the rugged, curved, bumpy and dusty mountain road, and it is difficult for people to travel and vehicles to get in and out, which brings inconvenience to the production and life of villagers in many natural villages, and there are many security risks. The backward road has seriously restricted the process of economic development in xx.
As the saying goes, "The road is long and Xiu Yuan is awkward." Smooth roads are the basic hardware for developing economy and improving people's quality of life. Now that the national policy is good, the government guides the construction of new countryside. Twenty-three administrative villages in the township have built rural roads 18, and the surrounding villages have stepped onto the pace of new rural construction and rushed to a well-off society. Changing the backward traffic situation has become the common aspiration of all the villagers in xx village, deep in the mountains. At present, the whole village has a high enthusiasm for road construction, and the Tongcun highway construction project has been supported by the superior highway authorities and is listed as the focus of this year's work. It has become the common aspiration and urgent task of the whole village to start highway construction and raise funds.
Xx village highway is planned to be from Kuzhushan to Miaoshan, with a total length of about 2.5 kilometers. It is planned to be completed and opened to traffic by the end of XX. The highway is built according to the national standard of Tongcun Highway, and the hardened pavement is designed to be 3.5 meters. According to the survey budget, the total investment of this project is about 300,000 yuan. With the national matching funds, it is not enough for xx village to invest in 350 yuan per capita. ) It is really difficult to complete the project only by village-level investment, so we must closely rely on the strength of all the people and work together with Qi Xin to build a broad road.
Here, the two committees of xx Village Branch issued an initiative: I hope that the broad masses of party member cadres and masses in the village, out-of-town sages, private entrepreneurs, and people of insight from all walks of life will lend a helping hand, make money and make a strong contribution. No matter how much they donate, we are grateful, even a little strength will be our support. We promise that all donors will be uniformly issued receipts by the village Committee and a financial supervision team will be set up for special purposes. All donations are arranged in sequence according to the amount, and the names and amounts of donors are engraved on the tablet; Where an individual donates more than 500 yuan and the enterprise donates more than 1000 yuan, the personal name and enterprise name (legal person name) shall be engraved on the stone, so that people and future generations will always remember the merits and demerits of the donor. Besides, it is widely publicized.
It is difficult to build roads for a while, but it is difficult to rot for a lifetime! I sincerely hope that we will unite as one, unite as one, the road is being updated, and the tomorrow of xx will be more brilliant!
I look forward to your support and your letter.
Road repair agreement 10 party a:
Party B:
In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:
A, a 6-meter-wide maoji highway will be built from Sanbei Village No.3 Team to No.12 Team, Huangfashu No.12 Team to Li Jiawan xx Front Brick House Dam and Chongfo Village No.1 Club.
Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1:2. The land area of xxx field of No.12 Society of Beicun is * * * with xx mu, and the square field cultivated by No.1 Society of Chongfo Village has been replaced.
3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.
Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.
5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.
Party A: Party B:
Representative of Party A (signature): Representative of Party B (signature):
Verifier: Verifier:
Year, month, sun, moon, sun.