I. Safety objectives, safety assurance system and technical organization measures (I. Safety management policies and objectives 1. Occupational health and safety and environmental management policy Safety first, health protection, quality first, standardized construction, pollution reduction, energy saving and consumption reduction, law-abiding and continuous improvement. 2. Safety goal A, put an end to serious accidents and achieve the "zero" goal of individual work-related death: B, put an end to group injuries, with the minor injury rate not exceeding 3 ‰; C, no major mechanical equipment, traffic and fire accidents; D, put an end to collective food hygiene poisoning accidents. (2) Safety management organization and its main responsibilities 1. Composition of safety management organization; Project Manager: Project Chief Engineer: Li Shidong Safety Officer: Su 2. Responsibilities of major departments and personnel (1). Project Manager The project manager is the occupational safety and health manager of the project and the first responsible person, who is fully responsible for the safety and health of the project construction and directly leads the work of the Quality and Safety Department of the project department. His duties are as follows: a. Conscientiously implement the guidelines, policies and regulations on safety in production and adhere to safety first. B, organize the actual situation of this project, be responsible for establishing the safety system, organize the preparation of the corresponding safety plan, construction organization design, and be responsible for its implementation. C, supervise and inspect all functional departments to do a good job in safety education and technical training for construction personnel, improve the safety awareness and self-protection ability of operators, and prevent all kinds of accidents. D, organize relevant personnel to conduct regular safety inspection at least once a week, so as to find all kinds of hidden dangers on the construction site in time, and urge rectification within a time limit to ensure the smooth progress of safety construction. E, correctly treat the relationship between safety and production, not illegal command, and urge the production team to carry out safety activities. F, found that inductrial injury accident, according to the emergency plan timely rescue, participate in accident investigation and handling. (2) A, the chief engineer of the project, is responsible for the technical work of production safety in the construction process of this project, conscientiously implements the safety technical measures formulated by the superior and the safety technical measures designed by the construction organization, and has the responsibility to put forward corrective and supplementary measures when it is found that it is inconsistent with the actual situation or has hidden dangers in the implementation process. B, participate in the organization of production safety assurance plan, and organize internal safety assessment and internal audit, and timely organize relevant personnel to rectify the problems raised by the superior audit. C, select or specify the targeted safety technical disclosure text at each stage of construction. D, monitoring engineering department is responsible for the safety system elements, the implementation of improvement measures. E, responsible for all stages of the safety technical scheme disclosure to the builder, safety officer and technician, as well as the safety technical scheme of key dangerous parts of the project. F, formulate safety technical preventive measures, analyze and investigate potential safety accidents, formulate targeted corrective and preventive measures, and inspect and supervise the implementation of relevant personnel. (3) The deputy project manager, the occupational safety and health management representative of this project and the person directly responsible for safety shall be directly responsible for the safe construction of this project. Assist the project manager to do a good job in the safety management of the project, and his responsibilities are as follows: a. Seriously implement the national guidelines, policies, regulations and rules on safety production. B, responsible for organizing the implementation of the occupational safety and health management system established by the unit and ensuring its effective operation. C, while planning, arranging, checking, summarizing and evaluating the construction tasks, the safety work should run through every construction link, making the safety work regular, institutionalized and concrete, checking at least once a month, summarizing the safety work, taking timely measures and organizing the construction on the premise of ensuring safety. D, seriously implement the safety measures formulated by the project department. Be responsible for organizing the formulation and implementation of occupational safety and health management rules and regulations of this project. E, formulate safety technical measures plan, responsible for organizing the implementation. F, responsible for the implementation of safety and health education for employees in this project, and constantly improve employees' safety and health awareness. (4) Under the direct leadership of the project manager, the safety officer shall do a good job in the safety management and supervision of this project, and his responsibilities are as follows: a. Conscientiously implement the national guidelines, policies, regulations, rules and regulations on safety in production and the relevant provisions of the superior; Assist the project manager to organize and promote construction safety; B, participate in the construction organization design and review of technical measures for safe construction of unit projects, dangerous operations and special operations; Audit safety construction operations and check the implementation; C, assist the General Department to study, test and issue certificates for employees' safety regulations and safety construction management regulations; D, assist the project manager to organize and participate in safety inspection; According to the principle of "three decisions" (fixed personnel, fixed things and fixed time limit), urge the rectification of the problems that have been identified; E, go deep into the construction site to master the state of safe construction, and put forward rectification opinions in time in view of the existing problems. F, supervise the construction technical management personnel to prepare and disclose the construction safety measures, and supervise their implementation; G, responsible for the supervision and inspection of the construction site safety construction and civilized construction; Supervise safety construction facilities, find hidden dangers of accidents, and put forward rectification opinions in time; In special or emergency situations that seriously endanger personal safety, have the right to order to stop construction in advance and immediately report to relevant leaders for handling; Have the right to stop illegal operations and impose economic penalties on violators; (5) Safety responsibilities of relevant personnel A. Technicians, constructors and quality inspectors: assist safety officers to carry out relevant safety work and supervise the construction safety within their respective responsibilities. B mechanical and electrical equipment manager: responsible for checking the maintenance of construction machinery and equipment, and regularly checking and testing the safety and technical performance of the equipment; Responsible for the preparation of construction machinery and construction machinery safety operation procedures, and assist the General Department to educate and assess the mechanical operators; Responsible for construction machinery and accident investigation, analysis and rectification opinions of construction machinery. C material clerk: responsible for the distribution, storage, regular inspection and test of safety instruments. (III) Safety management system The safety management of this project must strictly abide by the relevant safety management systems and documents issued by Water Investment Co., Ltd.. 1, safety management system (1), implementation of safety post responsibility system, civilized construction, everyone's responsibility, leaders attach great importance to safety work in thought and action, put safety work first, and put safety work on the agenda. Strengthen management. The project department conducts safety inspection once a month. (2) The safety file management system is designed with safety education assessment, special operations, building construction, production machinery, fire and explosion prevention and labor protection articles distribution, inspection and safety team activity records. , in order to manage security file records. 2, safety education system to strengthen the safety awareness of construction personnel, often organize employees to learn all kinds of safety work procedures and safety construction management regulations, learn all kinds of safety knowledge, strengthen the three-level safety education, realize the three-level safety education rate 100%. 3, safety technical measures scheme writing, review, disclosure system before each unit project or division project starts, safety technical measures and schemes must be written and approved by the project chief engineer and safety supervision department, and disclosure records, measures and schemes must be strictly implemented. 4. Mechanical management system (L). Establish and improve the inspection and acceptance system of construction machinery. Before the mechanical equipment is put into use, it must be organized by the mechanical equipment manager and attended by safety supervisors, and the inspection and acceptance procedures shall be performed, and the mechanical technical files shall be established. (2), improve all kinds of mechanical equipment operation procedures, rules and regulations; All kinds of mechanical equipment used have complete safety technical operation procedures and should be hung in obvious post positions; (3) Strengthen the daily maintenance and management of construction machinery and equipment. All kinds of machinery and equipment used on site should be strengthened in daily maintenance and overhaul to keep the machinery and equipment in good condition. (4) Mechanical equipment shall not run in spite of illness. 5, electricity, fire safety management system (L), establish and improve the construction electricity, fire, explosion-proof safety management system and management organization, electricity, fire, explosion-proof management, strengthen the daily maintenance and inspection of power lines, strengthen the fire, explosion-proof safety inspection (2), according to the specified requirements and according to the working environment and fire, explosion-proof nature requirements, prepare enough fire equipment, and maintain good performance. Check the fire control work at the same time as the safety inspection every month: (3) Electrical equipment and power cord should meet the requirements of electricity management, and it is strictly prohibited to pull and connect them randomly. Electrical appliances should have good protection devices, and electrical administrators should check electrical equipment every day. 6. Safety inspection system According to the progress of the project and the seasonal situation, it can be divided into construction stage safety inspection and seasonal safety inspection. The project department conducts a safety inspection every day. 7. Safety work meeting system The project department holds a safety meeting once a month, which is presided over by the project manager and attended by safety personnel, the builder and the team leader, to check and understand the safety situation of the construction site, each type of work and process, put forward improvement measures and arrange safety work. (4), safety construction management measures 1, the implementation of the responsibility system for production safety. Prepare measures and plans to ensure safety in production, establish and improve the target responsibility system for safety in production at all levels, departments and posts, decompose it into people and publicize it on the wall. 2. Strengthen safety education and training. Establish a safety education and training system and implement regular training. 3, to be equipped with safety protection equipment. 4. Establish and improve the safety accident prevention system. 5. Daily safety management warehouses, oil depots, living quarters in production areas, construction sites and fire-prone places all know how to use them, and they are all used for fire fighting and rescue. 6. Personnel management regulations. A. Personnel participating in the construction must be trained and educated in occupational safety and health knowledge and civilized construction management requirements. B. Construction personnel shall wear uniform work clothes; C personnel entering the construction site should wear labor protection articles and wear them correctly. Unqualified personnel shall not enter the site; 3. On-site management regulations A. Work areas such as materials, objects and processing must be planned in the on-site operation area and used according to regulations; B. Materials in the processing plant must be stacked with raw materials, semi-finished products and waste products in an orderly, clear and accurate manner; C. Site construction materials must be classified and neatly stacked; D. The construction waste of buildings, internal and external places and construction sites must be cleared in time; Two. Environmental protection During the construction of this project, all employees should abide by the current national laws and regulations on civilized construction and environmental protection, and put people first: elaborate construction, customer first; Care for the environment and reduce pollution; Abide by laws and regulations and develop continuously. "Environmental management policy. This paper comprehensively analyzes the environmental protection problems that may be caused by the layout of production overlay during the construction process, and regards the protection of ecological environment as an important work in the construction process management. 1. List of environmental protection and civilized construction management institutions: project manager: project chief engineer: Li Shidong, safety officer: Su 2. Job responsibilities (1). Project Department: responsible for organizing the confirmation of key environmental factors, organizing the formulation of corresponding environmental protection measures, approving, reporting and supervising the implementation; (2) Operation Department: responsible for the hazards within the department. The implementation of the implementation measures. Identify and classify all factors that may affect the environment within the operation scope, put forward targeted control measures and schemes, and report them to relevant departments. Implement plans and measures to ensure that relevant activities meet the specified requirements and will not cause accidental damage to the environment. (3) Special task of environmental protection and civilized construction: specifically cooperate with the project department to formulate environmental protection measures, and cooperate with the director of safety and quality department to inspect and supervise the daily civilized construction on site. 3. Civilized construction objectives According to the construction characteristics of this project, the following civilized construction objectives are formulated; A, the construction site semi-closed management; B, on-site construction drainage unblocked, roads have someone to maintain; C, equipment, materials yard solid, smooth, no water, neatly stacked; D, construction electricity, gas system layout is reasonable, safe and reliable; E, construction machinery and equipment in good condition. 4. See the organization network diagram of environmental protection and civilized construction for the organization. 5. Implementation plan A. Personal post responsibility system: civilized construction management establishes post responsibility system according to specialty, post and post respectively. The project manager is the first person responsible for civilized construction, and is fully responsible for the civilized construction management of the whole construction site. The team leader is responsible for the civilized construction management of the team. All personnel on the construction site should clearly define the division of responsibilities and implement the personal post responsibility system; B, economic responsibility system: civilized construction into the unit economic contract responsibility system, and inspection and assessment; C. Inspection system: the site shall organize comprehensive inspections according to disciplines and standards at least twice a month; D. Work with certificates system: Work with certificates system shall be implemented at the construction site. All mechanical drivers, electricians, welders and other special types of construction personnel entering the construction site must hold relevant certificates. The canteen on the construction site should have a food hygiene license, and the cooks should have a health certificate; E, meeting system: adhere to the civilized construction meeting system, analyze the civilized construction situation regularly, and formulate measures according to the actual situation to help solve the civilized construction problems; F. Professional management system: Civilized construction is a comprehensive management work. Therefore, in addition to civilized construction, we should also establish and improve the management systems of quality, safety, fire protection, security, machinery, site, hygiene, materials and appliances, environmental protection, migrant workers and so on. In these professional management systems, there should be civilized construction and work content; G, enterprise logo management system; Site signs must be strict, serious, earnest and unified, and the production and use must strictly implement the relevant standards of our bureau, and shall not be changed at will; Pay attention to the overall effect when using, and do not maintain, post or cover it at will, and keep it clean. If it is damaged, it should be repaired or replaced in time. Second, the specific measures of civilized construction The responsibility area of civilized construction must be implemented layer by layer, from the project department to the operation division to the team to the individual, so that "everyone is responsible for safe and civilized construction". 1. According to the document requirements of Notice of Water Investment Company on Strengthening Traffic Safety and Safety Civilized Construction Management in Engineering Construction, a. Establish a civilized construction management system to make the system open and on the wall. B, establish a civilized construction management team with the project leader as the main person in charge, and designate a special person to be responsible for the environmental sanitation of the working area and living area. C to ensure safety, offices, dormitories, canteens and warehouses are set up in the project. D, establish five cards and one drawing (project overview card, management personnel list and supervision telephone card, fire control card, safety production card, civilized construction card, construction site plan). E, the scene set up security doors and guard management room, establish the guard system. 2, transportation road maintenance on a regular basis, timely watering, try to avoid producing a lot of dust. 3. The waste and muck scattered on the construction site should be cleaned up and transported away in time. 4, the site must save water and electricity, put an end to running water and ever-burning lamps. 5. Smoking is strictly prohibited on the construction site. 6, make a good fire control plan, education for construction personnel, make the construction personnel know the requirements of fire prevention, fire prevention knowledge, know how to use fire fighting equipment, clear division of labor and cooperation. Once there is danger, deal with it in time. 7, the construction site are not allowed to urinate anywhere. 8. Strengthen site management and prohibit non-construction personnel and non-engineering vehicles from entering the construction site. 9, when the construction vehicle slag, baffle should be set, slag quantity should be appropriate. 10, it is strictly forbidden for construction vehicles to overtake and drive in a civilized way on the construction site. 1 1. When mechanical equipment is working or passing through other units, it is necessary to maintain and respect the labor achievements of others, and the responsible unit should also take the initiative to provide convenience. 12, do a good job in the relationship with relevant units, in line with the attitude of being kind to others, disputes will be resolved through organizational channels, and it is strictly forbidden to gather people to fight. 13, it is forbidden to fight and make trouble after drinking in the construction area. 14, vehicles and machinery should be parked in the designated location, and put in order. No parking anywhere. It is forbidden to honk loudspeakers when driving in living quarters, and the driving speed shall not be greater than 15km/h 15. Civilized operation is advocated, and barbaric construction is prohibited and stopped. Once found, no matter whether it causes damage or not, it will be given economic punishment.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd