Learn the driving heatstroke prevention and sun protection methods (8 selected articles) (1) to effectively protect the health and life safety of highway construction personnel, strive to improve the working environment and living conditions of construction personnel, effectively prevent safety accidents and high temperature heatstroke, and ensure safe production on the construction site. The requirements for heatstroke prevention and cooling of site construction personnel are as follows:
1. Make plans for heatstroke prevention and cooling, arrange the construction reasonably, and prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
2. Properly arrange the construction production during the high temperature period, reasonably adjust the operation time, arrange the workers' work and rest time and a reasonable labor rest system. Strictly control overtime. During the high temperature period, the project department stops aerial work to prevent workers from being tired, weak and overworked, causing casualties.
3, strictly implement the workers heatstroke prevention and cooling items and drugs. Heat preservation barrels shall be set at stations and construction sites to ensure uninterrupted supply of boiled water, and sufficient barley tea or mung bean soup meeting sanitary requirements shall be provided. Salt concentration of salt drinks (including salt soda, tea, traditional Chinese medicine and various soups, etc.). ) is generally 0. 1‰~0。 3‰, to prevent workers from dehydration and heatstroke. The project department is equipped with heatstroke prevention drugs such as Ren Dan and Shidishui, as well as a medicine cabinet. Regularly distribute heatstroke prevention drugs to all teams and front-line workers in sufficient quantities. These medicines include Ren Dan, Shidishui, Zhengqi water, cooling oil, Wuji Dan, Zhuye powder, honeysuckle and chrysanthemum.
4. In hot season, in order to ensure that workers have a full rest and reduce fatigue, the project department shall stipulate:
Adjust the dormitory and transfer the workers in the same shift together to avoid mutual interference and affect sleep.
Carry out publicity and education work to ensure that workers can eat well, sleep well and have a good rest after coming home from work.
In order to ensure that workers have a full rest, simplify the meeting as much as possible, have a rest and avoid overtime.
5. In summer, according to the construction progress, adjust the labor organization as much as possible, shorten the continuous operation time by changing shifts frequently, and strengthen the rotation rest at work. Workers should undergo physical examination before employment and in summer. People suffering from cardiovascular diseases, hypertension, ulcers, emphysema, liver diseases, kidney diseases and other diseases should not be engaged in high-temperature operations.
Learn the methods of heatstroke prevention and sun protection for driving (selected 8 articles) (Part II) In order to conscientiously implement the spirit of the Notice of Fujian Electromechanical (Holdings) Co., Ltd. on Forwarding the State-owned Assets Supervision and Administration Commission of Fujian Province on Doing a Good Job in heatstroke prevention and cooling (No.209 of Fujian Machinery Control [20 _ _]), effectively prevent and control the occurrence of heatstroke among employees at work, and ensure the personal health and construction safety of employees, the security department of Fujian Strait Ke Hua Fuxing Construction Engineering Co., Ltd. carries out safety protection in the Straits.
First, unify thinking and understanding and strengthen safety management.
The high temperature season is a season with frequent accidents. We require all project departments and project teams to adhere to the concept of people-oriented and caring for employees' lives and health, resolutely implement the policy of "safety first, prevention first and comprehensive treatment", and attach great importance to heatstroke prevention and cooling in the summer of 20__. The party and government, engineering department and safety department of the company can straighten out the relationship between safety and production, safety and benefit, attach great importance to heatstroke prevention and cooling work in high temperature weather in summer, and revise and improve heatstroke prevention and cooling measures and emergency plans in combination with their own reality to ensure the effective development of heatstroke prevention and cooling work. At the same time, the safety department of the company also cooperated with the engineering department and the trade union to strengthen the guidance, supervision and inspection of heatstroke prevention and cooling, strengthen overall coordination and departmental cooperation, improve and optimize the safety production management of various project departments and teams, and ensure the implementation of heatstroke prevention and cooling measures in specific work practice.
Second, do a good job in publicity and education to enhance safety awareness.
Due to the particularity and dispersion of the blasting industry, the company makes full use of team meetings, publicity banners, safety education drills and other forms to guide employees to understand the basic knowledge and emergency methods to prevent high-temperature heatstroke and improve their safety awareness and self-protection awareness. Each project department gives full play to its own advantages, understands and grasps employees' opinions, suggestions and requirements on heatstroke prevention and cooling through various channels, and reports to the company's security department in time to win support. At the same time, in view of the characteristics that high temperature weather is easy to cause fires, in order to further strengthen employees' awareness of fire safety and improve their ability to save themselves and escape in the early stage of fire, the Safety Department, together with the Engineering Department, General Department, Finance Department and other departments, with the strong support of company leaders, will organize employees to carry out special fire emergency drills and special safety training for dangerous goods vehicles, popularize fire safety knowledge, simulate fire scenes and conduct actual fire drills. Through training, the emergency response ability, pre-control ability and disposal ability of employees to deal with various emergencies have been further improved.
Learn to drive for heatstroke prevention and sun protection (8 selected articles) (3) In summer, the sunshine intensity increases and the hot weather continues. In order to improve employees' working environment, protect employees' health, prevent employees from heatstroke and other production safety accidents caused by high temperature weather, and ensure normal production, life and social order, the heatstroke prevention and cooling work in high temperature weather is hereby notified as follows:
First, earnestly implement the responsibility of heatstroke prevention and cooling.
All enterprises should conscientiously implement a series of requirements for heatstroke prevention and cooling, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of front-line employees, constantly improve and conscientiously implement relevant responsibilities, formulate emergency plans, and do a good job in the implementation of various preventive measures.
Second, arrange the schedule scientifically and reasonably.
All enterprises should pay close attention to the weather forecast of high temperature weather, strictly implement the high temperature avoidance measures of "grasping at both ends and resting in the middle", appropriately adjust the labor rest system for high temperature weather operations, reduce labor intensity, strictly control outdoor operation time, avoid operations during high temperature periods, and ensure the health and life safety of employees. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00. According to the production technology of products, the shift of labor force should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and ensure the rotation and rest of employees.
Third, actively improve the working environment.
All enterprises should conscientiously implement the regulations on site management of workshops, actively take measures to strengthen ventilation and cooling, ensure that facilities such as workshop fans meet the needs of heatstroke prevention and cooling, provide employees with cool drinks that meet the hygiene requirements, and equip employees with various heatstroke prevention and cooling drugs such as Ren Dan, cooling oil and wind oil to avoid heatstroke caused by poor ventilation and hot and humid weather. It is necessary to strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, organize relevant rescue drills, and improve employees' safety awareness.
Fourth, do a good job in internal health and epidemic prevention.
All enterprises should do a good job in health and epidemic prevention in the workshop site and the living quarters of employees, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration. It is necessary to strengthen the monitoring of diseases prone to high temperature weather. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the park and other competent departments in time.
Learn the methods of driving for heatstroke prevention and sun protection (8 selected articles) (4) 1, purpose
In the hot season of heatstroke prevention and cooling, this emergency plan is specially formulated in order to strengthen the organization and management of the site, conscientiously implement a number of responsibilities and rules and regulations promulgated by the company, and prevent the harm of high temperature to construction personnel and projects.
2, high temperature warning
When the Meteorological Observatory issues a high-temperature warning report, the emergency plan leading group should pay close attention to the working and living conditions of employees in time, adjust the work and rest time, and prohibit overtime and overload construction.
3, cooling prevention measures
First, ideological mobilization
Ensuring the safe production of high-temperature construction in our department in summer is directly related to the smooth implementation of the project and the physical and mental health of the operators. The project department requires all cadres and workers to fully understand the seriousness and urgency of heatstroke prevention and cooling politically. All departments should intensify propaganda, establish the consciousness of heatstroke prevention and cooling, let all employees fully understand the relevant measures of heatstroke prevention and cooling, take effective measures to actively deal with high temperature weather, strive to improve the working environment and living conditions of construction workers, effectively prevent safety accidents and high temperature heatstroke, and ensure safe production on the construction site.
B, improve the organization network, the implementation of flood control responsibility system.
In order to ensure the safe production of the project, our department has established a perfect heatstroke prevention and cooling organization network, set up a "summer construction leading group", implemented the post responsibility system at different levels, and implemented the general duty system in hot weather.
C, earnestly do a good job in engineering safety inspection.
In order to ensure the safe production of the project, all parts of the engineering facilities are inspected from bottom to top, and the software and hardware are grasped together. When problems are found, they should be dealt with in time to nip potential safety hazards in the bud.
D, prepare a certain amount of heatstroke prevention and cooling drugs and materials.
Set up drinking room, tea stove and heat preservation barrel to ensure uninterrupted supply of boiled water and sufficient barley tea meeting the hygiene requirements. Salt concentration of salt drinks (including salty soda tea, traditional Chinese medicine, various soups, etc.). ) is generally 0. 1 ‰ ~ 0.3 ‰ to prevent workers from dehydration and heatstroke; The infirmary is equipped with heatstroke prevention drugs such as Ren Dan and Shidishui, and is equipped with a medicine box. Timely and sufficient distribution of heatstroke prevention drugs to all teams and front-line workers, these drugs are: Ren Dan ten drops of Zhengqi water and cool oil Wuji Danquyan powder honeysuckle chrysanthemum lotus leaf.
4. Ensure the information of heatstroke prevention and cooling is smooth.
During the high temperature period, the project department and various engineering departments arrange personnel to be on duty to ensure timely, accurate and smooth information.
5. Emergency measures
In case of heatstroke or safety accident, contact the leading group of summer construction of the project department in time and take effective measures to organize first aid. For people suffering from heatstroke in hot season, first of all, we should give priority to saving people, put them in a ventilated and cool room and send them to the hospital for treatment in time.
Learn the method of driving for heatstroke prevention and sun protection (selected 8 articles) (the fifth article)? With the arrival of hot weather in summer, in order to ensure the safety and health of construction personnel. This heatstroke prevention and cooling measure is specially formulated by our project according to the specific construction situation at this stage, and the responsibility is specifically implemented to people, and cooling drugs are also put in place.
1. Meteorology defines "high temperature days" when the daily maximum temperature is 35 degrees Celsius or higher, and "high temperature days" lasting more than 5 days are called "continuous high temperature". When the temperature is too high, people's gastrointestinal function will be relatively weakened due to the stimulation of summer heat, which is prone to discomfort such as top-heavy, chest tightness and loss of appetite, and even cause heatstroke, which is harmful to health.
? Second, the specific measures for heatstroke prevention and cooling:
1, the weather is hot, so try to avoid construction in strong sunlight, especially in the high temperature period at noon (12: 00-2: 00);
2, as far as possible in the construction site to take sun protection measures, water more to keep a cool and comfortable environment, workers working in the hot sun for a long time to shift, to avoid high temperature operation time is too long.
3. Drink plenty of water, especially salty water, and carry heatstroke prevention drugs with you, such as Ren Dan, cool oil and essential oil.
4. Take effective heatstroke prevention and cooling measures, strengthen the publicity of heatstroke prevention and cooling knowledge for workers, reasonably allocate the working hours of workers (7: 00 am-11:00, 2: 00 pm-6: 00 pm), avoid outdoor work in high temperature period, and reduce labor intensity. Adjusting diet, drinking mung bean soup and cooking porridge with lotus seeds, mint, lotus leaves, japonica rice and rock sugar are not only sweet and refreshing, but also a good medicine for clearing away heat and relieving summer heat, which can effectively prevent heatstroke and avoid heatstroke.
5, commonly used drugs, Ren Dan, ten drops of water, Huoxiang Zhengqi water, cool oil, honeysuckle, lotus leaf.
6. In case of heatstroke, the patient should be carried to a cool and ventilated place, lie down and rest, unbutton the patient's clothes and apply a cold towel to the patient's head and neck. In severe cases, patients should be sent to a nearby hospital for treatment.
Learn the methods of driving for heatstroke prevention and sun protection (selected 8 articles) (article 6) 1. Compilation purpose
In order to ensure the smooth construction of this project, to ensure that in case of an emergency during high-temperature construction in summer, heatstroke can be quickly and effectively prevented during construction, and to ensure the safety of employees' lives and property. Through the preparation of this measure to guide the development of heatstroke prevention and cooling, prevent heatstroke accidents, protect the personal safety of employees, ensure the normal production of the project department, and ensure that all kinds of emergency resources are in a good state of preparation;
Moreover, it can guide emergency actions to be carried out in an orderly manner as planned, prevent accidents from being delayed due to ineffective actions or chaotic on-site rescue work, and reduce personal injuries and property losses.
List of emergency leading group, chief commander, deputy chief commander and members;
Second, the high temperature season construction safety control measures
(a) pay full attention to the safety in production of high temperature and heat.
1. Strengthen organizational leadership and implement various safety responsibilities. Attach great importance to heatstroke prevention and cooling during high temperature in summer, and strive to improve the safety awareness and safety protection ability of front-line personnel.
2. Always adhere to the safety production policy of "safety first, prevention first, comprehensive treatment", further enhance the sense of responsibility, strengthen the supervision and inspection of production safety, and prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
(2) Take effective measures to ensure the safety of construction personnel.
1. Pay close attention to weather changes and actively respond to natural disasters caused by strong convective weather.
2. Widely publicize the awareness of heatstroke prevention and control, so that employees can master the basic knowledge of heatstroke prevention and cooling.
3. Patients with cardiovascular diseases, hypertension, organic diseases of central nervous system, obvious diseases of respiratory, digestive or endocrine systems, and liver and kidney diseases should be classified as contraindications for high-temperature operation.
4. During the high-temperature operation in summer, do a good job in heatstroke prevention and cooling for employees, provide tea (tea+sugar), distribute summer-heat drugs in time, and educate workers not to drink raw water to ensure the health of employees.
5. According to the characteristics of high temperature construction in summer, combined with the actual situation, take effective heatstroke prevention and cooling measures, arrange working hours reasonably, and ensure that workers have enough rest time. It is forbidden to go to work shirtless and wear slippers, and offenders will be fined according to the management requirements of the project department. Avoid working at high altitude and in the open air during the high temperature period at noon, and add shading facilities in the workplace according to conditions to prevent workers from heatstroke.
6. Improve the ventilation and cooling conditions in the working and living areas, and ensure that temporary facilities such as workers' dormitories, toilets and shower rooms meet the standard requirements and meet the needs of heatstroke prevention and cooling.
7. Strengthen construction safety supervision during high temperature in summer.
A. Strictly strengthen the management of all kinds of inflammable and explosive articles, and rationally allocate fire-fighting equipment to prevent fire and explosion accidents.
B. Safety personnel and electricians shall be set up on site to inspect the mechanical and electrical equipment and lines erected in the open air to prevent potential safety hazards such as overheating and spontaneous combustion caused by exposure to the sun.
C. During the high temperature in summer, the management personnel of the project department regularly inspect the production site to solve and deal with relevant problems in time.
D if employees feel unwell during high temperature, they should be treated according to the knowledge of heatstroke prevention and cooling, or treated by a doctor.
8. Do a good job of health and epidemic prevention in the construction site, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration. It is necessary to strengthen the monitoring of summer-prone diseases. In case of infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.
9. Reasonable arrangement of construction time during high temperature in summer. According to the temperature change, timely adjust the labor and rest time of high temperature operation in summer, reduce the labor intensity of migrant workers and reduce the operation time in high temperature period. When the temperature reaches above 35 degrees, there shall be no construction personnel on site from noon 10:00 to 3:30 pm. The focus is on the elderly, the weak, the sick and the disabled, and those who are not suitable for continuing to work are not allowed to work on the spot for the time being.
10. Strive to improve the rest environment of migrant workers. Necessary cooling measures should be taken in the prefabricated houses where migrant workers live. The dormitory of migrant workers should be clean and ventilated, and the dormitory should be equipped with air conditioning. At the same time, the sanitary management of migrant workers' dormitories should be strengthened to ensure that migrant workers have a better living and rest environment.
(3) Give prominence to key points and carry out special inspection of high-temperature safety production in summer.
In view of the characteristics that construction workers are prone to fatigue, heatstroke and accidents in summer, safety production inspection should be carried out seriously to prevent problems before they happen. Earnestly grasp the implementation of various rules and regulations such as the responsibility system for production safety, actively carry out self-examination and self-correction, and focus on preventing heatstroke, falling from a height, electric shock, lightning strike, food poisoning and fire.
Second, the start of the emergency plan
According to the construction characteristics of this project, the possible safety accidents in summer mainly include: falling from high altitude, heatstroke, electric shock and fire;
Do a good job of "five precautions" in summer (lightning protection, heatstroke prevention, poisoning prevention and fire prevention).
1, under the condition of high temperature, on-site construction personnel should quickly deal with the symptoms of threatened heatstroke or mild heatstroke, give first aid immediately, and report to the leading group for construction accident rescue in high temperature season. After receiving the notice, the leading group members quickly rushed to the scene of the accident, organized and handled the accident, and immediately announced the start of the emergency plan.
2. In case of severe heatstroke, when the number of people suffering from heatstroke is large or the condition is serious, the field personnel should deal with it quickly and report to the leading group for construction accident rescue in high temperature season. Members of the leading group should immediately rush to the scene of the accident, and the group leader or deputy group leader will announce the start of the emergency rescue plan according to the actual situation at the scene. ? Fourth, the response to key events.
(1) Necessary facilities and material preparation
1, when the outdoor temperature reaches 35℃, tea must be supplied in time.
2. The Project Safety Department publicizes common sense of heatstroke prevention and distributes heatstroke prevention and cooling items. And conscientiously do a good job in various service guarantees, timely teach summer health and disease prevention knowledge and common sense of heatstroke prevention and cooling, as well as self-help and mutual rescue knowledge, and improve the ability of project personnel to prevent heatstroke and cool down. Timely distribute ten drops of water, Ren Dan, essential oil, sugar, mung beans and other heatstroke prevention and cooling items, and the staff in the construction workplace must ensure the implementation of various heatstroke prevention and cooling measures.
3, heatstroke prevention and cooling staff responsibility system. The office of the project department is responsible for implementing the specific work of heatstroke prevention and cooling to prevent all kinds of personal and production safety accidents caused by high temperature weather.
(2) Rescue methods for heatstroke patients
1. In case of dizziness, fatigue and dizziness, the operator should immediately stop the operation to prevent secondary accidents. Other peripheral operators should arrange symptomatic personnel to rest in the air-conditioned room and take cooling measures in time.
2, severe patients (fainting, shock, severe water shortage, etc. ) When heatstroke occurs, the people around should immediately notify the relevant personnel of the project department, and transfer the accident personnel to the air-conditioned room in time, and immediately organize ambulance personnel to the scene to treat the accident personnel according to the specific situation. If the symptoms are serious, you should immediately call the medical emergency number "120" and report to the company.
3. Material preparation: The project department should prepare the following items: tea, Ren Dan, ten drops of water, essential oil, sugar, mung beans, etc.
4. Scheme implementation: The office of the project department should collect the weather and temperature in time, and start the measure immediately when the temperature changes to the predetermined temperature peak.
Learning how to prevent sunstroke (8 selected articles) (7 articles) has entered the midsummer season, with high X intensity and continuous high temperature weather. In order to do a good job of heatstroke prevention and cooling at the construction site in summer, ensure the health of construction workers, continuously improve working conditions, and prevent workers from heatstroke and other production safety accidents caused by high temperature weather, our project department will arrange the following work for high temperature operation and outdoor operation in high temperature season:
1, earnestly implement the responsibility system for heatstroke prevention and cooling. Each ZuoYeDui should conscientiously implement a series of requirements of the project department on heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling, improve the implementation of the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
2, reasonable arrangement of work and rest time. Pay close attention to the weather forecast of high temperature weather. (Meteorology defines the daily maximum temperature as "high temperature day" when it is greater than or equal to 35℃, and "high temperature day" when it lasts for more than 5 days is called "continuous high temperature". ) Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the schedule system of hot work in summer, reduce labor intensity, strictly control outdoor work time, avoid working in high temperature period, and ensure the health and life safety of workers. When the temperature is too high, the schedule will be adjusted to: 7: 30 am-165438+ 0: 30 pm, 65438+05: 00 pm-65438+09: 00 pm. On the premise of ensuring the health of construction personnel, ensure the construction progress requirements.
3. Strengthen the rotation rest at work. In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. The on-site construction personnel are required to rest within 2 hours of work, and the construction operation can be continued only after the body surface temperature drops to normal.
4. Ensure that there is enough drinking water on the construction site. The construction site should supply enough drinking water and mung bean soup that meet the hygiene requirements, so as to effectively prevent heatstroke and avoid heatstroke.
5. Implement heatstroke prevention and cooling items. It is necessary to pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff. Construction personnel are required to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil, essential oil, Huoxiang Zhengqi water and tea. And implement heatstroke prevention and cooling items for each worker.
6. Actively improve the production and living environment of construction sites. Conscientiously implement the "Regulations on the Management of Construction Sites" and actively take measures to strengthen ventilation and cooling, so as to ensure that temporary facilities such as dormitory, canteen, toilet and shower room for construction workers can meet the needs of heatstroke prevention and cooling. Electric fans must be installed in dormitory and canteen on site, and air conditioning must be installed in dormitory with conditions.
7. Do a good job in health and epidemic prevention. It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration. Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.
8, do a good job of fire prevention in summer. In view of the fact that it is hot and dry in summer and prone to fire accidents, fire prevention measures are further strengthened, and flammable places such as power distribution room, warehouse, paint room and carpentry room are inspected regularly. When problems are found, they are dealt with immediately, and fire-fighting equipment is equipped according to regulations.
Each ZuoYeDui should pay attention to the safety of summer construction, give priority to the health of on-site construction personnel in the near future construction, make preparations for heatstroke prevention and cooling, and spend this summer construction safely and healthily.
Learn the method of driving for heatstroke prevention and sun protection (8 selected articles) (8 articles) Specific provisions:
1, earnestly implement the responsibility system for heatstroke prevention and cooling.
Relevant units should conscientiously implement the responsible attitude of related construction and a series of construction site heatstroke prevention and cooling work, earnestly strengthen the organization and leadership of heatstroke prevention and cooling work, improve and implement the responsibility system, formulate emergency plans, pay close attention to the implementation of preventive measures, and prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
2, reasonable arrangement of work and rest time.
We must pay close attention to the hot weather. Meteorological weather forecast defines the daily maximum temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, which is called "continuous high temperature". Strictly implement the high-temperature avoidance measures of "grasping at both ends and intermittently", take measures, appropriately adjust the labor rest system for high-temperature operations in summer, reduce labor intensity, strictly control outdoor working hours, avoid high-temperature operations, and ensure the health and safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from/kloc-0 to/kloc-0 to/6: 30.
3, strengthen the rotation rest time at work.
According to the summer construction progress, try to adjust and reorganize the labor organization, work diligently, shorten the continuous working hours and strengthen the interruption of work rotation. Strengthen on-site inspection, increase the knowledge of heatstroke prevention and cooling, as well as the knowledge of heatstroke first aid, and improve the safety awareness of all employees.
4. Ensure that there is enough drinking water supply at the site.
The site should provide enough drinking water that meets the hygiene requirements. Water, drinks, tea and various soups can effectively prevent heatstroke and avoid heatstroke.
5. Implement heatstroke prevention and cooling items.
It is necessary to pay close attention to a large number of frontline construction workers who insist on construction in high temperature weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs such as Huoxiang Zhengqi, cooling oil and wind oil with them, and implement heatstroke prevention and cooling supplies for each worker.
6. Actively improve the production and living environment of the construction site.
Conscientiously implement the construction site management regulations, determined to take active measures to strengthen ventilation and cooling, to ensure that temporary facilities such as dormitory, canteen, toilet and shower for construction workers can meet the needs of heatstroke prevention and cooling, and to provide cool drinks and regular drinking water for construction workers.
7. Fans must be installed in the dormitory and canteen of the construction site, and air conditioning should be installed in the dormitory of the unit.
8, do a good job of health and epidemic prevention, do a good job of health prevention in the construction site and living quarters, carry out epidemic prevention work, strengthen the management of drinking water and food hygiene, strictly implement the food hygiene system, to avoid poisoning caused by food deterioration;
9. Strengthen the monitoring of frequently-occurring diseases in summer. In case of legal infectious diseases or food poisoning, the on-site staff shall report to the relevant competent authorities in time.
10, do a good job of fire prevention in summer. In view of the hot and dry weather in summer, fire accidents are prone to occur.
1 1, according to the actual situation, further strengthen fire prevention measures to facilitate the distribution room, warehouse, paint room, etc.