1. Newly-built rainwater pumping station and its supporting works on the north side of Heng Yue Road: This project aims to improve the drainage during rainfall, ensure effective flood control in and around the block, and reduce the losses caused thereby. By building new rainwater pumping stations and corresponding facilities and equipment, the drainage capacity will be improved and the urban flood control capacity will be enhanced.
2. Newly-built Taiyuan Road (Yunjing Road-Heng Yue Road) road project: This plan will open up the traffic network between Yunjing and Heng Yue, and provide a smoother and more convenient way for residents to travel. The construction of this important traffic trunk line is helpful to relieve traffic pressure, promote economic development and social exchanges, and is of great significance in urban development.
3. Comprehensive management and ecological restoration of Yongding River: In view of environmental challenges such as pollution and wetland degradation in Yongding River basin, comprehensive management and ecological restoration are carried out. These measures include shoreline improvement, water quality improvement and pollutant reduction, aiming at improving the water quality of Yongding River, protecting the healthy development of wetland ecosystem and creating a better natural environment for people.