In order to strengthen the safety management of contracted works and temporary workers, and thoroughly implement the ? Safety first, prevention first, comprehensive management? Safe production policy, to ensure personal and equipment safety, to ensure that the works and temporary work contracted by Party A to Party B during the period of smooth progress. According to the relevant state laws and regulations, by the A and B parties of equal consultation, unanimity of opinion, voluntarily signed the following agreement on production safety, and as a necessary supplement to the contract of outsourcing of works:
Article 1: A and B parties must seriously implement the state to develop production safety policies, laws and regulations.
Article 2: the safety responsibilities and rights assumed by Party A;
(a) Party A has the right to require that Party B must strictly abide by the production safety laws, regulations, standards, production safety regulations and operating procedures, and proficiency in accident prevention measures and emergency response plans for accidents;
(b) Party A's management personnel have the right to stop Party B's personnel from undisciplined operations, and to impose (c) Party A has the right to order the withdrawal of Party B's personnel who have poor safety awareness and do not listen to the instructions of production safety.
Article 4: Party B's responsibilities and rights;
(a) Party B is directly responsible for the safety of outsourced projects and temporary work, and must strictly implement Party A's regulations and systems related to safety;
(b) Party B is responsible for applying for the medical and work-related injury insurance for all Party B's staff, and purchasing appropriate personal accident insurance for the staff engaging in highly hazardous work according to the needs. Appropriate personal accident insurance, in the construction process, such as personal injury or death, Party B is fully responsible for;
(c) Party B should be fully responsible for the behavior of the work site, Party B staff shall not violate the rules of operation, risky operations, can not be fatigue work, and do a good job of protection according to the regulations;
(d) Party B in the project site personnel must be equipped with complete safety Protective equipment, can not meet the needs of safety engineering, personnel shall not enter the project site.
Article 3: Party B staff must strictly abide by and obey the site safety regulations and safety management, in the construction site must do:
(a) high-altitude suspension work must be fastened with safety belts;
(b) no alcohol before the shift, in the area of the prohibition of smoking is not allowed to smoke;
(c) the site may not be barefoot, no slippers, high-heeled shoes. Aerial work shall not wear leather shoes and nails slippery shoes;
(d) without the approval of the party in charge of the construction, shall not casually dismantle the safety protection facilities and safety devices and safety signs have been erected;
(e) shall not be indiscriminate connection and pulling of wires, to protect the site of the temporary power cables and distribution boxes intact, shall not be used materials, tools and other pressure on the cable to ensure that the safety of electricity;
(f) the construction of the site of the site of the temporary power cable and distribution box, shall not use materials, tools and other pressure to smash the cable to ensure safety;
(F) shall not be burned at the site of the project;
(VII) shall not be thrown down from a height of any materials, materials, stacking shall not be more than 70% of the weight limit of the support;
(VIII) shall not be piled up in the high proximity of a meter range of active materials;
(IX) shall not be in the operation of the surface and the high proximity of the vertical placement of tools and wires;
( (j) the use of power tools, must be in accordance with the operating procedures and instructions for the correct wearing of protective equipment;
(k) the construction process must strictly comply with the safety regulations.
Article 4: Safety Responsibility
(a) During the period of this Agreement, Party B is fully responsible for the safety accidents caused by Party B, and Party B will bear the economic losses and criminal liability;
(b) During the period of this Agreement, if Party B or Party B's staff members are at fault for the losses caused to Party A, Party B is responsible for compensating Party A, and Party A has the right to compensate for the losses directly from the Party B. Party A has the right to deduct the compensation from Party B's project payment.
Article 5: This agreement shall enter into force on the date of signing, in four copies, two copies for each party.
Party A: (signature) Party B: (signature)
Party A construction responsible (signature): Party B responsible (signature):
year month day year month day
construction safety agreement simple two
In order to improve the importance of foreign construction units on safety work, strengthen my company's The safety management, to ensure that the two sides of the property and employees 'personal safety, to prevent the occurrence of various types of accidents, special signing of this safety agreement.
All units and individuals who come to our company for construction must comply with the following safety management regulations:
Article 1: The construction unit shall strictly abide by the national laws and regulations on occupational health and safety, and be responsible for all the occupational health and safety management work within the scope of the construction tasks undertaken by the unit to ensure that the safety of the construction of the accident-free.
Article 2: The construction unit shall establish and improve the daily safety education, technical training and assessment of construction personnel, and strictly organize and implement the system; the construction unit shall not arrange for unqualified construction personnel who have not received safety education and technical training and assessment of the construction work; the construction unit shall establish a safety plan for the major hazards, and organize drills for the workers.
Article 3: engaged in electrician, metal welding, lifting machinery and equipment operation and other special types of operations, shall be organized by the competent administrative department in accordance with the relevant provisions of the state professional training, after passing the examination, licensed to work. Construction units shall not be arranged without the relevant special types of assessment certificate of qualification of operators engaged in special types of work.
Article 4: The construction unit at the construction site of the project manager for the construction unit responsible for construction safety management of the responsible person, the construction unit should be before the start of construction, according to the nature, scale and characteristics of the project, at least one full-time or part-time safety administrator, and to clarify the specific responsibilities and scope of its construction safety management and safety inspections on a daily basis.
Article 5: Setting up of construction safety protection facilities
The construction unit shall set up safety protection facilities at the construction site in accordance with the relevant national standards, industry standards or local standards, and meet the following requirements:
(a) adjusting and perfecting the safety protection facilities in a timely manner in accordance with the construction progress of the project and the characteristics of the season or weather; setting up special safety protection facilities in the accident-prone areas at the construction site. area, set up special safety protection facilities, and conduct relevant safety inspections;
(ii) all kinds of on-site hazard warning signs are complete, neat, and reasonably set. For dangerous construction sites such as deep grooves, pits and heights, warning lights should be hung at night.
Article 6: The installation and use of construction machinery, plant and electrical equipment by the construction unit shall be in accordance with the following provisions:
(a) Before the installation of facilities, the construction professional and technical personnel shall provide information about the data of the facilities to the Ministry of Integration and go through the relevant formalities, and the facilities shall be installed only after approval;
(b) Before the use of the facilities, safety performance tests shall be carried out in accordance with the specified safety (B) before the use of facilities, should be in accordance with the required safety and technical standards for safety performance tests, acceptance of qualified before use;
(C) in the use of facilities during the period, it should be designated as responsible for the maintenance, maintenance, to ensure that it is intact, safe.
Article 7: Electrical Safety and Fire Safety
The construction unit shall comply with the relevant provisions of electrical safety and fire safety at the construction site, and meet the following requirements:
(a) Keep the power substation and distribution facilities and transmission and distribution lines and are in a safe and reliable use of the state;
(b) to the company's construction units and individuals must comply with the company's rules and regulations, accept the company's safety management personnel. Rules and regulations, accept the company's safety management personnel inspection and supervision;
(C) to ensure that construction work in line with fire safety technical standards and norms, the construction site must be equipped with sufficient fire fighting equipment, set up in a reasonable position, and its regular maintenance to ensure that sensitive and effective;
(D) to the company's construction units to use the open fire before the comprehensive department for fire approval procedures, and with a valid copy of the special operations license. A copy of the special operations license and fire extinguishing equipment security deposit of 200 yuan, after the fire certificate, before the fire construction, otherwise the company has the right to stop all construction;
(e) construction units should be cleaned up before the fire site flammable and explosive substances, eliminate potential hazards, to be confirmed after the safety of the fire construction; fire clean up in a timely manner after the fire and other hazardous materials;
(f) the fire operation Personnel must be licensed to work, before the fire to develop fire emergency measures, ready fire extinguishers or other preventive facilities, and designate a person to monitor;
(g) prohibited in the vicinity of flammable and explosive fire;
(h) high welding and cutting operations to prevent the welding flower fell into the flammable and explosive;
(ix) prohibit welding and cutting of containers under pressure, piping and not cleaned and processed all kinds of Oil drums and tanks;
(j) construction site temporary housing, should be in line with the fire regulations. Fire escape routes are often kept clear, the width of not less than 3.5 meters;
(xi) flammable, explosive and other hazardous materials, to be kept in special custody, special storage; there are appropriate safety measures; there are strict procedures for receiving and returning materials and approval system;
(xii) oxygen cylinders, acetylene cylinders and liquefied petroleum gas cylinders and other pressure vessels to be kept in special custody, separate storage, cylinders on the rubber ring and other safety accessories prescribed by national standards;
(xii) oxygen cylinders, acetylene bottles and liquefied petroleum gas bottles and other pressure vessels to be kept in special custody, separate storage, cylinders on the rubber protection ring and other National standards for safety accessories; cylinders to be regularly inspected, and provide inspectors with relevant inspection certificates.
Article 8: labor protective equipment
Construction units should provide construction workers with construction safety in a timely manner necessary to meet national standards of labor protective equipment. Such as: helmets, safety belts, gloves, dust masks and so on.
Article IX: construction workers in the construction process should meet the following requirements for safe operation:
(a) in accordance with the construction safety technical standards and safety regulations for this type of construction work;
(b) in accordance with the relevant provisions of the national labor protection, the correct use of personal labor protective equipment; dress in accordance with the relevant provisions of the construction, the female workers long hair should be disc into the Work cap; special operations in accordance with the relevant national requirements dress; in the mechanical rotation environment dress to prevent entanglement; into the site to wear a helmet, work at height to fasten the safety belt;
(c) found that there are abnormalities at the construction site, should immediately take effective protective measures, and to the security administrator or the construction safety management responsible person to report. Construction workers have the right to refuse to carry out the operation instructions of the management personnel in violation of the construction safety technical standards or safety operation procedures, and can report to the person responsible for construction safety management or the safety administrator.
Article 10: Daily safety management of the construction site
The construction authority shall strengthen the daily safety patrol and inspection of the construction site, and the construction manager shall carry out a safety inspection of the site once a day to urge the construction personnel to comply with the relevant provisions of the Company, and shall stop the hidden danger of safety accidents, violation of the technical standards for safety in construction or the safety operation procedures in a timely manner when he finds out that the construction safety is not in compliance with the relevant provisions of the Company. The company's safety inspection is carried out once a day on site.
Article 11: Safety Supervision and Inspection
The Security Section of the Company shall conduct regular inspections or random inspections of the construction units. If you find any hidden safety hazard or any operation that does not meet the requirements of regulations, you can order the construction unit or the construction personnel to make corrections immediately or within a certain period of time.
Article 12: the management of construction personnel living facilities
(a) the site is prohibited to set up a dormitory, on-site life management measures, health management system, to break down the responsibility to the person;
(b) temporary facilities must meet the relevant requirements of the enterprise, erected neatly, inside and outside the neat and clean;
(c) the site is equipped with first-aid kits, able to urgently dispose of sudden Emergency and accidental personal injury;
(d) Construction site is prohibited cooking. Drinking water appliances fixed management, do a good job of disease prevention, epidemic prevention, to ensure that no food poisoning occurs.
Article 13: The construction party shall provide the Company with the following six attachments:
(a) Provide relevant qualification certificates;
(b) Provide relevant certificates for the construction party's project leader, management personnel, technicians, and the list of construction personnel;
(c) Provide the qualification certificates for the construction party's special operators;
( (D) provide construction personnel safety technology and safe work procedures;
(E) provide construction safety technology and organizational measures;
(F) both sides of the construction safety technology briefing record information.
Article 14: the construction party before signing the contract according to the size of the contract amount need to pay security deposit of 2000?5000 yuan to XXXX Co.
Article 15: Violation of the above provisions and standards, the first time to be warned to correct, and then every time found in the security deposit of 100?500 yuan, three consecutively punished by ordering the suspension of rectification, suspension of economic losses during the period of time borne by the construction unit, the company will not be responsible for. Those who cause safety accidents will be fined 1,000 to 5,000 yuan security deposit, and the unit responsible for the accident will bear the full responsibility and economic losses. Our company has the right to cancel the construction qualification for those who have seriously violated the regulations and never change. Where the safety construction without violation of the construction of the end of the deposit will be returned.
Article 16: The constructor is responsible for the safety of production, and any accidents (incidents) occurring in the process of construction shall be borne by the constructor, and XXXX Company Limited shall not bear any responsibility.
Article 17: This safety agreement in triplicate, a copy of the external construction unit, the company's construction department and the safety department of each one; the right to interpretation belongs to the company's safety department.
Article 18: This safety agreement is effective from the date of sealing.