Supervision engineers inspect the work content
The work content refers to what kind or content of labor the worker is engaged in, and it is the main content of the labor contract that determines that the worker should fulfill the labor obligations, including the type of work, position, scope of work, work tasks, work duties, labor quotas, quality standards, etc. The work content clause is one of the core terms of the labor contract. The work content clause is one of the core clauses of the labor contract. The following is my help to organize the work content of the supervision engineer inspection, welcome to learn and reference, I hope to help you.
Work content of inspection
Inspection is the supervisory personnel of the parts or processes under construction in the field of regular or irregular supervision activities, is the daily procedure of supervision.
1, the construction process of sub-parts of the project and process quality inspection and control in the supervisory staff must be done on a daily basis on the construction of the work area is under construction to carry out inspection tours. The chief supervising engineer must regularly organize all professional supervisors according to the plan to carry out a comprehensive inspection tour, the formation of institutionalized.
2, the main contents of the site inspection are as follows:
(1) whether in accordance with the design documents, construction specifications and approved construction program construction;
(2) whether to use qualified materials, components and equipment;
(3) the construction site management personnel, in particular, whether the quality control personnel in place;
(4) construction Operators of the technical level, operating conditions to meet the requirements of the process operation, special operators are licensed;
(5) whether the construction environment has an adverse impact on the quality of the project;
(6) has been constructed parts of the existence of quality defects.
3, the supervision staff should be daily patrol inspection according to the actual entry into the day of supervision diary, not missing, omission, the larger quality problems or quality hazards. It is appropriate to use photos, photography and other means to be recorded.
4, check the quality of the project or construction safety issues in addition to making records, to be issued in a timely manner, "Supervising Engineer Notice" to the construction unit to sign the processing, and reply. Important issues should be copied to the construction unit at the same time.
5, the inspection of important issues in accordance with the relevant provisions of the treatment, and tracking and monitoring, records for the record.
Parallel Inspection
Parallel inspection refers to the supervision of the use of certain inspection or testing means, in the construction unit on the basis of self-inspection, in accordance with a certain proportion of independent engineering quality testing activities. Parallel inspection reflects the independence of engineering supervision, the scientific nature of the work, but also the requirements of management specialization.
1, the incoming engineering materials, components, equipment, inspection, testing and re-inspection in accordance with the professional construction quality acceptance specification of the sampling program and the contract agreed upon way, and based on the detection of the actual situation and data compilation report into the supervision file.
2, the inspection of sub-projects test batch inspection, testing should be in accordance with the professional construction quality acceptance specifications of the content and standards of the project quality control of the various aspects of the implementation of the necessary parallel testing, and records are filed in the supervision file. Inspection batch sampling number shall not be less than 20% of the total number of test batches of the sub-projects.
3, the division of the project, the unit of work related to structural safety and functional testing sampling, engineering quality inspection, assessment, etc. should be in accordance with the "Uniform Standards for Quality Acceptance of Building Construction" and the contract requirements. The test results form a record, and into the supervision file.
4, the acceptance of hidden works should be in accordance with the relevant construction drawings and the relevant provisions of the construction quality acceptance specification for the necessary inspection, testing, and according to the actual record, into the supervision file.
5, in the parallel inspection found in the unqualified parts of the project, the supervisory staff shall not be the construction unit of the corresponding parts of the project quality control information for review and signature, and notify the construction unit shall not continue with the construction of the next process.
6, the supervisory staff must sign the parallel inspection records, and is responsible for its authenticity.
Expanded reading: Supervisory inspection 'points and skills
First, inspection plans and arrangements
To do a good job on-site inspection, we must make the appropriate preparations and plans, in order to "targeting", to achieve the desired results.
1, inspection preparation
(1) familiar with the design documents and related laws and regulations, codes and regulations, standard drawings, as well as local regulations, requirements, etc., so as to have a basis to rely on;
(2) familiar with the situation on the construction site, especially at this stage of the construction parts, the content of the plan should be aware of the focus of the inspection to do a good idea of the inspection. Such as: winter on the "winter construction program" implementation of the inspection, summer on the cast-in-place concrete structure of the maintenance situation and the effect of the inspection;
(3) to do a good job of inspection tools, such as carrying commonly used measuring tools, digital cameras and the necessary security supplies. For the quality and safety problems or hidden dangers found on the site should be timely photographed and photographed to save the original records.
2, the scope of the walk-through inspection
(1) the quality of the completed test batch, sub-projects, sub-division of the project;
(2) the operation of the work surface under construction;
(3) the construction site of the project materials / components of the site, the production, processing, the use of the situation, as well as incoming engineering materials, the quality of the testing, reporting and inspection. Dynamic control;
(4) the construction site of mechanical equipment, safety facilities use, maintenance;
(5) the construction site of the work surface of the safe operation, civilized construction;
(6) the protection and use of engineering reference points, control points and environmental testing points.
3, inspection work arrangement
(1) Supervision Department personnel division of labor and cooperation
The project superintendent engineer should fully understand all members of the project supervision organization's professional expertise and level of competence, and then in accordance with their professional expertise and level of competence to rationally arrange the objectives and content of the inspection.
① project quality, project materials / components / equipment inspection by the supervisor / professional supervisor is responsible for the implementation;
② safety supervision inspection by the full-time safety supervisors are responsible for the implementation;
③ to strengthen the supervision of the internal information communication between the Department of communication, exchange of information and mutual cooperation to achieve a clear division of labor, but also solidarity and collaboration, to avoid the work of a "blind spot". Appear "blind spot" and "wrong zone", resulting in the project leakage inspection, while avoiding the construction of a loophole can be drilled.
(2) inspection route selection
Inspection should not be made into an aimless "wandering", and "horseback riding", but to plan ahead of the inspection route, to ensure that inspection monitoring to the quality of the project, progress, safety, investment control and other business scope. Civilized construction, investment control and other business scope, to do purposeful, targeted inspections and checks.
(3) the inspection time and frequency of the arrangement
A every day after going to work in time to carry out on-site inspection. Such as the occurrence of gusty winds, rainstorms and other abnormal conditions should be based on the actual timely inspection of the site, in order to control the site situation as early as possible, and timely detection and resolution of problems;
B, for the completed test batch, sub-projects, sub-sections must be carried out in a timely manner to ensure that all the completed test batch, sub-projects, sub-sections of the project at least through a tour of inspection;
C, for the ongoing construction of the Work surface (including safety), should be based on the importance of its parts and the degree of difficulty of the construction work at least once or twice a day inspection (morning and afternoon each);
D, the supervisory staff at least once a day to inspect the main project materials and the quality of the incoming products testing, especially those affecting the structural safety of the project and the use of engineering materials, such as cement, sand, gravel, steel, bricks, bricks and other materials, such as the use of the construction of the project. stones, steel, bricks, concrete blocks, waterproofing materials.
Second, inspection inspection content
1, raw materials
focus on checking the construction site raw materials / components of the procurement and stacking is in line with the requirements of the construction organization design (program): its specifications, models, etc. are in line with the design requirements; whether the witness sampling, and testing; whether the procedure has been reported to the Supervisory Acceptance and allow the use of; whether the use of substandard materials, Quality certification data lack of materials, etc..
2, construction personnel
(1) construction site management personnel, especially quality inspectors, safety personnel and other key positions in place, whether qualified, its internal cooperation and work coordination is normal, to ensure that the timely implementation of the management system and quality assurance system, stable and effective;
(2) whether the special operators are licensed, whether the person certificate is In line with the corresponding education and training and safety, technical briefing and have records;
(3) site construction personnel organization is sufficient, reasonable, can meet the requirements of the schedule, according to the approval of the construction organization design (program) and design documents construction.
3, construction machinery
Check focus: machinery and equipment, installation, acceptance, storage, use, etc. whether to meet the requirements and regulations; quantity, performance to meet the requirements of construction; whether the operation is normal, whether there is no anomaly.
4, deep foundation pit earth excavation project
(1) whether the earth excavation preparatory work is in place, whether the excavation conditions are available, whether the configuration of machinery and equipment is appropriate;
(2) whether the earth excavation order, method and design conditions are consistent with the requirements of the "trenching and support, first support and then digging, excavation, and prohibit over-excavation";
(2) whether the earth excavation order, methods and design conditions are consistent with "support, first support and then digging, excavation, and prohibit over-excavation" requirements. (3) Whether the excavation is carried out in layers and blocks, whether the layer height and slope gradient meet the design requirements, and whether the treatment of slope and spraying protection are timely;
(4) Whether the pile loads on the side of the pit and the support meet the requirements, and whether there are any safety hazards;
(5) Whether there is any collision or damage to the construction machinery, the pit enclosure and the support structure, the structure of the support structure, and the construction machinery. Pit enclosure and support structure, engineering piles, precipitation wells and other phenomena;
(6) digging ten machinery if walking on the concrete support has been poured, whether to take measures such as mulching, paving steel plate, and is strictly prohibited to walk on the bottom of the hollowing out of the support components and operation;
(7) the enclosure of the surface of the repair, stopping leakage of curtains and treatment of leakage, whether it is in line with the design and the requirements of the technical treatment program;
(7) the surface of the enclosure, leakage and treatment of curtains have a special person responsible for, whether it meets the design and Technical treatment program requirements;
(8) each support bottom adhering to the soil, bedding, bamboo fence, etc. whether to clean up in a timely manner, to avoid falling injuries;
(9) each support on the safety channel and the erection of edge protection in a timely manner, in line with the requirements;
(10) digging mechanic whether there is a special person to direct the phenomenon of unauthorized operation.
5, construction site mixing of mortar, concrete and other mixes ratio check
(1) whether to use qualified materials testing unit to provide the official ratio, but also to check whether the ratio adjusted according to the actual moisture content;
(2) the production and placement of the site ratio signage is standardized, the contents of the complete, clear, and operational
(3) whether there is a person in charge of measurement, can be achieved "per plate measurement", especially the admixture of additives and water is strictly controlled within the permissible range, measurement records are true and complete:
(4) measurement of the weighing machine whether there is a certificate of conformity, whether the physical evidence is consistent with whether the legal metrology Inspection and certification department to identify qualified and use within the validity period, its use and custody is normal, there is no damage and artificial disassembly and adjustment phenomenon.
6, masonry
(1) whether the grass-roots level cleanup is clean, whether it is required to use fine stone coagulant leveling;
(2) whether there is a "broken bricks" focused on the use of the phenomenon of the use of the blocks and the appearance of quality unqualified;
(3) whether it is required to use the tare bar (3) whether the wall tie bar type, specification, size, location is correct, whether the mortar fullness is qualified, whether the thickness of mortar joints exceeds the standard, whether there are transparent joints, "blind joints" and "false joints";
(4) whether the hollow core masonry fast masonry is in accordance with the requirements of the first layer of grouting treatment. The first layer of grouting treatment.
7, reinforcing steel works
(1) reinforcing steel corrosion, isolate and silt pollution phenomenon, whether it has been cleaned up;
(2) pad specifications, dimensions in line with the requirements of the strength to meet the needs of the construction, there is no use of wood, marble boards, etc., instead of cement mortar (or concrete) pads phenomenon;
(3) reinforcement laps Length, location, connection method is in line with the design requirements, lap section of the hoop is required to "encrypt"; for beam-column or beam-beam cross-part of the "core area" whether the main bar is truncated, hoop leakage, etc.
8.
8, template project
(1) template installation and dismantling is in line with the requirements of the construction organization design (program), for special requirements of the load-bearing supporting frame whether the expert demonstration, sealing the mold before the hidden content has been the supervisor acceptance;
(2) template surface is cleaned up, whether the deformation of the damage, whether it has been brushed with isolation agent, the template (2) whether the surface of the template is cleaned up, whether there is deformation and damage, whether the isolating agent has been painted, whether the splices are tight, and whether the installation is solid;
(3) whether the dismantling of the template is reported to the supervisory engineer in advance according to the procedures and requirements and signed by the supervisor, whether the dismantling of the template is in violation of the rules of the risk of behavior; template strapping, hoisting, stacking whether it is in line with requirements.
9, concrete works
(1) cast-in-place concrete structural components of the protection of compliance with the requirements, now whether it is allowed to pile loads, trampling;
(2) demolded concrete components of the dimensional deviation is within the permissible range, whether there are quality defects, and whether the repair treatment is in line with the requirements:
(3) cast-in-place components of the conservation measures are effective, Feasible, timely and so on.
(4) all kinds of buried reserved according to the drawings required size, location, size.
10. Steel structure project
Main inspection contents: whether the processing conditions of steel structure parts are qualified (such as site, temperature, mechanical properties, etc.), whether the installation conditions are available (such as whether the foundation has been qualified for acceptance, etc.); whether the construction process is reasonable and conforms to the relevant regulations; whether the quality of raw materials and parts of steel structure is in conformity with the design documents and relevant standards and requirements, etc. design documents and relevant standards and requirements, etc.
11, roofing project
(1) whether the grass-roots level is flat and solid, clean;
(2) waterproofing coil lap part, width, construction order, construction technology is in line with the requirements of the coil head, nodes, detailing is qualified;
(3) roofing blocks lap, paving quality, whether there is any damage.
12, decorative works
(1) whether the grass-roots treatment is qualified, whether the use of vertical and horizontal control lines as required, whether the construction process is in line with the requirements;
(2) need to conceal the parts and contents of the program has been reported to the inspection and through the acceptance;
(3) detailing, installation, finishing, etc., whether it is in line with the design requirements and the relevant provisions;
(4) whether the design is in line with the requirements of the design, installation, and the relevant provisions. Relevant provisions;
(4) the question of whether the interspersing of professional processes is reasonable, there is no mutual pollution, mutual destruction phenomenon.
13, installation and other
focus on checking whether the specification, regulations, design drawings, drawings and approved by the supervisor of the construction organization design (program) construction; whether there is a person responsible for the construction is normal.
14, safety and civilized construction
(1) whether the emergency rescue program is practical, whether it has been approved by the supervisor, whether it has been prepared;
(2) whether there are safety hazards on the construction site, the construction of illegal operation phenomenon;
(3) whether the security system and facilities are complete, effective, adequate, and the relevant security checks and records are true and timely. and the content of the record is true and timely.
15, construction environment
(1) whether the construction environment and external conditions adversely affect the control of project quality, safety, progress and investment, whether the construction unit has taken corresponding measures, whether it is safe, effective, and in line with the regulations and requirements;
(2) whether the setup and protection of the various benchmark control points, the surrounding environment, and the pit's own monitoring points are normal, whether they are crushed and damaged, and whether they are in good condition;
(3) whether the security system and facilities are complete, effective and adequate, and whether the relevant safety inspections and records are timely. (3) Whether the monitoring points of various benchmark control points, the surrounding environment and the pit itself are set up and protected normally, whether there is any phenomenon of being crushed and damaged, whether there are people cleaning up and restoring the crushed and damaged monitoring points, whether it can be completed in time, and whether the monitoring work can be carried out normally.
Third, the problem
Supervision engineers in the inspection tour, for the problems found in accordance with the occurrence of time, parts, nature and severity of the situation to take verbal (some of the problems can be pointed out face to face on the spot) or in writing (if necessary, attached to the site of the photographs taken by the original records) timely notification of the construction unit of the relevant personnel to carry out rectification and processing; for the construction of the plan is not in accordance with the construction, For construction not in accordance with the drawings, materials without testing or unauthorized use or other serious hazards, may cause or have caused safety, quality accidents, in the report to the construction unit, the timely issuance of the "Project Suspension Order", the construction unit is required to stop rectification to prevent the occurrence of safety, quality accidents or continuation of the expansion and the handling of the situation for tracking and monitoring until the re-examination of the qualification, and at the same time will be related to the problem and the handling of the situation in the "Supervision diary
Fourth, the attention of the problem
(1) on the inspection tour found in the problem, we must instantly take pictures, photography, sealing and other ways to retain the original record information.
(2) to pay attention to the efficiency and quality of work. The scene can be immediately resolved to deal with the problem must be resolved in a timely manner, for some reason can not be dealt with also have the concept of time, the deadline for the solution, to avoid irresponsible procrastination attitude, affecting the work and coordination.
(3) Note that the working attitude and method of handling the problem should be conducive to the solution of the problem. Avoid once found that the problem is always on fire, blowing his beard and eyes, loud reprimand, and even insult each other's personality and credibility, resulting in the two sides of the emotional confrontation and intensification of the conflict, not only so that the problem can not be solved, but also disrupt the overall situation, so that the supervision of the work into a "passive, distressed" state.
(4), to have a scientific attitude and spirit, adhere to the data to speak, not to the person. Do not be in a hurry to take a position on the issue of uncertainty, but to grasp the familiarization, research, targeted decisions, statements or issue notification forms, etc., to avoid specious, "may", "maybe" and so on the tone of voice occurs.
(5) Whenever the supervisory staff must always bear in mind "a hundred years of planning, quality first, safety first", the concept of strict law enforcement, due diligence, do not talk about the principles and standards, to take the "paste paste type" of the "old oil". "Old grease" style.
;