Chapter 1: Report on the rectification of hidden dangers in school safety165438+1On October 24th, the leaders of the Education Bureau made a comprehensive inspection of the safety work in our school and put forward many valuable opinions. In order to further strengthen the safety management of our school, fully implement the requirements of safety hazard management, effectively curb the occurrence of school safety accidents, and promote the safety and stability of our school, the rectification measures for school safety hazards are formulated as follows:
I. Guiding ideology
Guided by the development of Scientific Outlook on Development and safety, we will conscientiously implement the policy of "safety first, prevention first and comprehensive management", fully implement the school safety responsibility system, further investigate and manage the hidden dangers and weak links that affect school safety, and take the management of major safety hazards, prevention of major safety accidents and responsibility safety accidents as the goal to effectively protect the lives and property of teachers and students.
Second, the leading group and members
Principal Zhao is the team leader, the vice president in charge of safety work is the deputy team leader, and the class teacher of each class is the safety working group of the team members.
Three. job objective
Comprehensively investigate hidden dangers of accidents, pay close attention to the rectification of hidden dangers, further deepen special rectification, promote the implementation of the school safety responsibility system and accountability system, improve the safety management system, establish and improve a long-term mechanism for the investigation and management of hidden dangers and the monitoring of major hazard sources, and strengthen the foundation of school safety management to achieve the goal of investigation and management of hidden dangers in schools, prevention of safety accidents, and maintenance of school safety and stability.
Fourth, security risks.
(1) food hygiene
1, the school canteen has no hygiene license. Report on rectification of potential safety hazards.
2. The food sample is incomplete.
(2) Campus school safety.
1, the number of fire extinguishers in schools is small.
2. The school safety evacuation signs are incomplete, and there is a lack of emergency lighting facilities.
3. The water tower in the hospital is dilapidated and has potential safety hazards.
4. The stairs in the school function building are high and steep, so it is unsafe for students to go up and down the stairs.
(3) School management
1. There are no managers in male and female dormitories, and the division of responsibilities is not clear.
Verb (abbreviation of verb) rectification measures:
1, hold a special meeting on food safety, and order the canteen management personnel to do a good job of keeping food samples, coordinate with relevant departments, and actively apply for the school canteen hygiene license. Report on rectification of potential safety hazards.
2. Over the weekend, the school has purchased enough fire extinguishers, installed emergency lighting and safety evacuation signs, dismantled the dilapidated water tower in the courtyard, and reflected the problem of high and steep steps in the functional building to the central school, ready to coordinate with the planning unit of the Education Bureau to transform the steps. The school has held a safety work meeting, asking the leaders in charge and relevant teachers to regulate students' behavior, educate students to pay attention to the safety of recess activities, ask the class teacher to strengthen education, and ask the teachers on duty to stop accidents. Report to the teacher in time when you are in danger.
3. There are full-time management personnel in male and female dormitories, and the division of labor is clear to ensure that there is no problem.
Future planning and practice of intransitive verbs;
1, strengthen leadership and elaborate organization. Schools should earnestly strengthen the organization and leadership of the investigation and management of hidden dangers in schools, further implement the responsibility system for investigation and management of hidden dangers, improve the working mechanism, clarify the division of responsibilities, make careful arrangements, organize meticulously, and comprehensively complete various management tasks.
2. Intensify publicity and raise awareness. According to the actual situation of the school, teachers, students and parents are given safety education in all directions. First of all, the use of safety education classes, according to the age characteristics of students of all grades to take appropriate education methods. Secondly, actively carry out safety emergency plan drills, and constantly improve the emergency self-help ability of teachers and students.
3. Highlight key points and pay close attention to governance. It is necessary to highlight the three governance priorities of school buildings, activities and food, focus on the personal safety of teachers and students, pay attention to inspections and hidden dangers, and promote peace and stability. Schools should work hard on prevention and hidden danger management, speed up the intensity and progress of hidden danger investigation and management, and do the investigation and rectification without leaving a dead end. All kinds of hidden dangers found out, no matter what difficulties and conditions, should be rectified in place.
4, strict dormitory and canteen management. Dormitory should have a responsible person, clear responsibility; The canteen should strictly control the food quality, keep food samples and records, and ensure the food safety of teachers and students.
Chapter II: Report on the rectification of hospital safety hazards According to the spirit of superiors, in order to ensure the effective and smooth development of safety production in our hospital during the period of ""and put an end to safety accidents, the safety leading group of our hospital was led by the leaders in charge on August 5 16:00, and conducted safety hazard investigation in the "three points and one hospital" branch of our hospital. Conduct a "pull-net" inspection of fire safety passage, fire protection facilities, boiler room, power distribution room, power line, drug warehouse, charging department, B-ultrasound room, radiation room, important equipment department, security work and night shift work. After inspection, the overall situation is good, and the investigation is now reported as follows:
I. House inspection
After the leading group for the investigation of potential safety hazards inspected the houses in the hospital one by one, it was determined that there were no dangerous houses and no potential safety hazards.
Second, the power supply system
After inspection, no aging or damage was found in all lines of the current power supply system in our hospital, and no virtual connection or leakage was found at the joints. There is no disorderly connection between departments and individuals, putting an end to danger.
Third, fire prevention and theft prevention.
The inpatient department and important departments in the hospital are equipped with fire extinguishers, and all employees have mastered the use method. The windows of important departments are all equipped with protective nets, and there is no damage and disrepair after inspection.
Fourth, the drainage system
The hospital regularly organizes personnel to thoroughly clean all the drainage in the hospital to ensure smooth drainage.
Verb (abbreviation for verb) equipment
At present, our hospital has a medical pressure cooker 1 set, four oxygen cylinders and a 600 mA X-ray machine 1 set. After inspection, they all work normally and are kept and used by special personnel, and there is no potential safety hazard. On this basis, strengthen the training of other relevant personnel, check the pressure cooker and oxygen cylinder regularly, and reduce the accident rate.
Six, dangerous chemicals
There are no toxic or narcotic drugs in our hospital. Peroxyacetic acid disinfectant is stored in a plastic bucket and kept in a dark place.
Seven, first aid work
Our hospital has set up an emergency handling working group, the ambulance has been overhauled, and the members of the first aid team are on duty 24 hours a day.
Eight, strengthen the leadership duty shift system.
The administrative and medical personnel on duty must stick to their posts 24 hours a day and keep the communication facilities open. Deal with emergencies in a timely and effective manner to ensure the smooth flow of safety information.
Nine, letters and visits to maintain stability
We set up a leading group for letters and visits to maintain stability, carefully investigated the unstable factors in the hospital, organized and coordinated the problems found in time, and took timely measures to prevent and put an end to group petitions and leapfrog petitions. After careful investigation, there are no unstable factors.
Chapter III: Report on the rectification of the company's potential safety hazards On XX, XX, the city's safety supervision law enforcement officers conducted routine safety inspections on our company and found the following potential safety hazards:
1, goods and vehicles entering and leaving the factory and warehouse are not perfect;
2. Insufficient static eliminator and eye washer in Class A places;
3. The materials in Class A warehouse do not meet the specification requirements, and the sundries are not cleared in time;
4. Fire-fighting equipment has passed the inspection validity period, and some hoses of fire-fighting equipment are aged and broken;
5. The electronic scales used in Class A workshops and some wire tubes in explosion-proof areas do not meet the explosion-proof requirements, and the crane has no safety buckle. Operating instructions are not on the wall.
At present, in view of the security risks found in the inspection, our company has carried out the following rectification during the rectification period.
1. Redesign the company's delivery/pick-up registration form. The registration contents include: the license plate number of the delivery/pick-up vehicle, the nature of the vehicle's use, the quality of the vehicle's nuclear load, the validity period of the vehicle inspection, the driver's name, the driver's qualification certificate number, the driver's qualification certificate number, the escort's qualification certificate number, the escort's qualification certificate validity period, the name of the goods, the number of vehicles delivered/picked up, and the goods carried with the vehicle. The security guard is responsible for truthfully registering in and out of the vehicle according to the new registration form.
2. Buy 8 sets of human anti-static devices and install them at the entrances and exits of Class A warehouses and Class A workshops.
3. Buy 3 sets of eye washers and install them at the exits of Class A workshop and Class B warehouse.
4, a warehouse goods according to the "five distance" (goods from the top more than 50cm; The distance between goods and lamps is not less than 50 cm; The distance between the goods and the wall is 30cm, and the distance between the goods and the inner column of the warehouse is10 ~ 20cm; Pile spacing 100cm), in order to keep the materials tidy and the site clean. When stacking in barrels, plywood must be added between layers.
5. Check the fire-fighting equipment of the whole plant, and find unqualified fire extinguishers (*** 103 sets) to be replenished, and replace the aging and damaged equipment accessories (***75 sets).
5. Conduct a comprehensive inspection of tools in workshops and warehouses, and replace all barrel-opening tools with explosion-proof tools made of copper-aluminum alloy.
6. Buy explosion-proof electronic weighing display. Because the merchant is short of cash, two explosion-proof electronic weighing displays have been replaced, and all of them will be replaced when the merchant arrives.
7. An anti-falling safety auxiliary hook is installed on the hook.
8. The wires that do not meet the safety requirements in the metal shed at the east gate of the workshop have been removed.
9. The safety operation instructions and equipment safety operation procedures for each post have been hung on the wall.
Chapter IV: Report on the investigation and rectification of potential safety hazards Our school is located in the countryside, and students and parents have weak safety awareness, so we can't relax our safety work at any time. "Without security, there is nothing" is a belief from school leaders to teachers. In order to further strengthen and improve the school safety work, ensure the safety of all teachers and students' lives and property, and maintain the normal education and teaching order of the school, the safety work of our school was seriously investigated at the beginning of the fall semester of 20 14. The investigation and rectification situation is now reported as follows:
First, attach great importance to it, organize it carefully and implement it carefully.
Campus safety involves thousands of households and social stability. Our school conducted a safety inspection on the campus and its surrounding environment on September 1-3. First, our school has made a long-term alarm for safety work and has always made unremitting efforts. The second is to improve the organization, sign letters of responsibility at all levels, implement the responsibility system at all levels, and implement the first level. The third is a comprehensive investigation and careful inspection.
Second, the basic situation of campus safety work
1. The internal system of the school is relatively perfect. Schools conduct regular inspections and education to prevent accidents and strive to create a good educational environment.
2. The whole school regularly conducts safety self-examination and self-correction, and arranges staff to be on duty at school every day. During class, off-campus personnel are not allowed to enter the campus casually.
Third, the school security risks investigation
Carefully check the safety of all parts of the school. The school safety work leading group has carefully inspected the school buildings and facilities. Every potential safety hazard found in the self-inspection is recorded in the Safety Inspection Record Form, and specific rectification measures are put forward for potential accidents found in the self-inspection. The school conducts investigation and management of potential safety hazards, and the relevant information is as follows:
(a) the safety status of important facilities and places in the school.
1, check the school security equipment, and find that the monitoring equipment is damaged and there is no image, which has been reported and contacted relevant personnel for after-sales.
2, a comprehensive inspection of power lines, found that the school line trunk aging phenomenon, has been replaced immediately. The school microcomputer has been used for many years, and its configuration is also low, and it often breaks down. Now we are trying to replace it.
3. The doors and windows of some classrooms in the school are damaged, and the master has been asked to repair and reinforce them.
4. The security situation of school buildings is grim and not optimistic:
(1) The roofs of classrooms 2, 3 and 5 are leaking, and the school called to repair them.
(2) The top of teachers' and students' toilets and cesspools are seriously damaged and are being repaired.
(3) The school gate is welded and has been repaired by special personnel. The south wall of the school has been reinforced due to inclined cracking. Observe and use it.
(4) The ground of the kindergarten square is uneven and needs to be leveled and hardened.
5. Large toys, flagpoles, swings, basketball stands, table tennis tables and other facilities have no potential safety hazards.
(b) The security situation around the campus.
There are no internet cafes at the school gate and no traffic roadblocks along the road, but there are dangerous walls, ponds, idle houses and many cars on the way to school. We have strengthened the relevant safety education for students.
(3) Implement safety education. Conduct comprehensive safety education for teachers and students at the beginning of school, and sign safety responsibility letters with class teachers, parents and students; Every class carries out safety education inside and outside the school. Our school carries out all-round safety education and publicity through blackboard newspapers. All staff should establish safety awareness, strengthen safety education for students, ask students not to get close to strangers, and educate students on how to prevent drowning, food poisoning, epidemic situation, traffic accidents and respond to emergencies such as earthquakes, floods, fires and lightning, so as to effectively enhance students' safety awareness and self-help and self-care ability.
In short, the implementation of safety work is not phased, but a long-term work, and the school is unable to bear the heavy financial burden of school building rectification. However, we deeply feel that security is a great responsibility. Our school should take this special action to investigate and manage potential safety hazards as an opportunity to further improve various rules and regulations of safety work, deepen management, strive to put an end to campus safety accidents, and create a safe and harmonious working, learning and living environment for teachers and students.
Chapter V: Report on the rectification of enterprise safety hazards On XX, XX, the city safety supervision law enforcement officers conducted routine safety inspections on our company and found the following safety hazards:
1, goods and vehicles entering and leaving the factory and warehouse are not perfect;
2. Insufficient static eliminator and eye washer in Class A places;
3. The materials in Class A warehouse do not meet the specification requirements, and the sundries are not cleared in time;
4. Fire-fighting equipment has passed the inspection validity period, and some hoses of fire-fighting equipment are aged and broken;
5. The electronic scales used in Class A workshops and some wire tubes in explosion-proof areas do not meet the explosion-proof requirements, and the crane has no safety buckle. Operating instructions are not on the wall.
At present, in view of the security risks found in the inspection, our company has carried out the following rectification during the rectification period.
1. Redesign the company's delivery/pick-up registration form. The registration contents include: the license plate number of the delivery/pick-up vehicle, the nature of the vehicle's use, the quality of the vehicle's nuclear load, the validity period of the vehicle inspection, the driver's name, the driver's qualification certificate number, the driver's qualification certificate number, the escort's qualification certificate number, the escort's qualification certificate validity period, the name of the goods, the number of vehicles delivered/picked up, and the goods carried with the vehicle. The security guard is responsible for truthfully registering in and out of the vehicle according to the new registration form.
2. Buy 8 sets of human anti-static devices and install them at the entrances and exits of Class A warehouses and Class A workshops.
3. Buy 3 sets of eye washers and install them at the exits of Class A workshop and Class B warehouse.
4, a warehouse goods according to the "five distance" (goods from the top more than 50cm; The distance between goods and lamps is not less than 50 cm; The distance between the goods and the wall is 30cm, and the distance between the goods and the inner column of the warehouse is10 ~ 20cm; Pile spacing 100cm), in order to keep the materials tidy and the site clean. When stacking in barrels, plywood must be added between layers.
5. Check the fire-fighting equipment of the whole plant, and find unqualified fire extinguishers (*** 103 sets) to be replenished, and replace the aging and damaged equipment accessories (***75 sets).
5. Conduct a comprehensive inspection of tools in workshops and warehouses, and replace all barrel-opening tools with explosion-proof tools made of copper-aluminum alloy.
6. Buy explosion-proof electronic weighing display. Because the merchant is short of cash, two explosion-proof electronic weighing displays have been replaced, and all of them will be replaced when the merchant arrives.
7. An anti-falling safety auxiliary hook is installed on the hook.
8. The wires that do not meet the safety requirements in the metal shed at the east gate of the workshop have been removed.
9. The safety operation instructions and equipment safety operation procedures for each post have been hung on the wall.
Hereby report
XX company limited
X year x month x day
Chapter VI: Report on Rectification of Hidden Dangers of Engineering Safety In view of the problems raised in the Notice on Rectification of Hidden Dangers of Engineering Safety dated April 18, 20xx, the rectification of hidden dangers of engineering safety on site is as follows:
1. Assign a special person to be responsible for rectifying the temporary electricity consumption on site according to the requirements of double-line grounding to ensure the normal operation of the protective zero line; Individual distribution boxes have been rectified according to the requirements of three-wire distribution; Dismantle the wiring of the mechanical switch box of reinforcement; Replace the switch box and switch appliances of the cooking machine to ensure that the leakage protector can work normally. Person in charge: Jiang Yi
Completion time: XX years, xx months, xx days.
2.( 1) As the scaffold has been set up, it is temporarily impossible to adjust the interval.
(2) Contact points and channels are being established.
(3) According to the requirements, set foot boards in the limb.
(4) According to the specification requirements, a flat screen should be set at a distance not greater than 10 meter.
(5) The scaffold height should be one step higher than the construction height as required.
Person in charge: xxx
Completion time: XX years, xx months, xx days.
3. The formwork support has been removed; Arrange special personnel to be responsible for the erection of border protection.
Person in charge: xxx
Completion time: XX years, xx months, xx days.
4, arrange someone who's in charge of setting up the material hoist docking device; The receiving platform shall be rectified as required, with protection on both sides and protective doors; Overhaul the hanging cage door to ensure normal use.
Person in charge: xxx
5. Assign a special person to supplement and improve the site safety information again.
Person in charge: xxx
Completion time: XX years, xx months and xx days.
6. Arrange special personnel to rectify the safety protection shed of the material hoist; The roof is provided with edge protection; Safety protection should be set at the steel pipe column on the roof.
Person in charge: xxx
Completion time: XX years, xx months and xx days.