What are the requirements of the hospital laboratory clean decoration?

1, the ground material: requires the use of seamless non-slip corrosion-resistant ground, commonly used decorative materials for the rubber or PVC ground, pavement joints need to be welded with the same color solder and planing, polishing;

2, the ceiling, wall panel materials: requirements for easy to clean, disinfected, not dusty, no cracking, smooth, waterproof, scrub-resistant, commonly used materials for the double-sided sandwich color steel plate, the fire rating of not less than flame retardant B1 grade;?

3, laboratory requirements for the door: should be able to close automatically, the door should be set up to observe the window, with door locks and door closers, the door can be installed on the head of the work status indicator, marking the laboratory whether someone is working;?

4, the laboratory on the window requirements: the wall should not be set up to open the external window, can be set up to close the observation window;?

5, the laboratory of the intersection between the walls: the wall and the ground at the intersection of the wall and the ceiling are applied to the intersection of arc processing, color steel plate splicing should be played at the sealant processing to ensure that the laboratory airtight;?

6, laboratory ceiling height requirements: ceiling height of 2.6m is appropriate, the main laboratory ceiling should not open access holes.

Hospital laboratory laboratory ventilation and air conditioning project?

1, purification laboratories should be avoided more than one laboratory **** with an air conditioning unit, independent air conditioning unit can effectively avoid cross-pollution, saving operating costs;?

2, laboratory air conditioning design parameters should refer to the "Biosafety Laboratory Building Technical Specification" regulatory requirements, in the design should also take into account the biological safety cabinets, centrifuges, incubators and other equipment, heat and humidity load;?

3, air purification system should be set up coarse / medium / high efficiency three-level air filtration, coarse filter should be located in the new air intake, medium filter should be in the air conditioning unit of the positive pressure section, high-efficiency filters should be set up at the end of the system's air supply;?

4, the height of the new air inlet from the ground should not be less than 2.5m, the new air inlet should be anti-rodent and insect and rain measures should be set up to easily remove the cleaning of the filter;?

5, laboratory exhaust fan should be designed with a chain of blowers, exhaust fan should be turned on before the blower, after the blower closed, indoor exhaust ducts and biological safety cabinets and other equipment should be set up separately;?

6, indoor air supply and exhaust port layout should make the indoor airflow stagnation of the smallest space, purification of indoor air supply and exhaust should be used on the air supply and exhaust mode.

7, laboratory areas should be maintained between the air pressure difference of not less than 5Pa? to ensure that the air flow is from the clean area to the contaminated area, to avoid countercurrent pollution, it is recommended to set up a differential pressure table in an easy to observe place;?

8, air-conditioning units and filters can not use materials, should use corrosion-resistant, non-absorbent materials, air-conditioning unit leakage rate should be less than 2%;

9, air-conditioning is mainly fan coil plus fresh air system, winter and summer use of hospitals to centralize the hot and cold sources, if the hospital does not have a source of hot and cold spring and fall seasons, you can self-provided air-cooled modular units to provide a source of hot and cold.

Test laboratory water supply and drainage system?

1, pure water system: the laboratory is mainly pure water equipment is biochemistry, laboratory water system before the design should be communicated with the person in charge of the laboratory pure water water points and the amount of water used in each water point.

2, the water supply system: the exit of the laboratory should be equipped with hand-washing devices, hand-washing devices should be used non-manual faucet, biosafety laboratories are recommended to test the belt network with a hands-on disinfection devices, water supply materials in line with relevant national requirements.

3, drainage system: no floor drains should be set up in the clean laboratory, laboratory drainage should be separated from the living area drainage, should ensure that laboratory drainage into the hospital sewage treatment station.

Test laboratory furniture?

1, laboratory furniture based on its use of materials can be divided into all-steel furniture, all-wood furniture, steel furniture three categories, all-steel furniture, but the price is high, all-wood furniture because of its drawbacks in the load-bearing, waterproofing has been very few people to choose, while the steel furniture is more moderate, the design should be combined with the hospital's cost of the budget for the selection of the appropriate furniture.

2, the laboratory countertop material mainly epoxy resin board, solid core physical and chemical board and Trespa three categories, because the laboratory laboratory laboratory use of high-temperature equipment is not much, generally recommended the use of solid core physical and chemical board countertops and Trespa countertops.

3, the laboratory should be made before the actual situation and work to determine the style and length/width, the number of furniture will affect the work, the number of furniture will take up too much work space. Seven, the hospital laboratory electrical engineering laboratory?

The laboratory should be tested according to the primary load power supply, and should be set up uninterruptible power supply system UPS, to ensure that the main equipment is not less than half an hour of power supply.

1, laboratory lighting system for testing?

(1) office area illumination ≥ 200?Lux; buffer room, preparation room ≥ 200?Lux; laboratory illumination ≥ 300?Lux; blood collection table illumination ≥ 500?Lux;?

(2) ordinary laboratory area can be based on the ceiling material selection of ordinary lamps and lanterns, purification area should be used closed lamps and lanterns;? (3) The laboratory should be equipped with ultraviolet sterilization lamps, can be 10-15 square meters equipped with a 30W ultraviolet lamp;?

(4) the number and location of evacuation lights, emergency lights, exit lights should be designed in accordance with the relevant provisions of the fire regulations

Fan.

2, laboratory power distribution system for testing?

(1) in the electrical design should be set up enough sockets, and should be known in advance of the main equipment of the laboratory power, biosafety laboratories should be set up in a dedicated distribution box or distribution cabinet;?

(2) in the design of uninterruptible power supply UPS should be communicated with the person in charge of the laboratory to determine the need for uninterruptible power supply equipment and the shortest power supply time, uninterruptible power supply placed in the location should ensure that the ventilation conditions are good.?

3, laboratory laboratory weak power system?

(1) telephone network terminal: in the laboratory should be set up enough telephone network terminal interface to meet the laboratory information management communication requirements;?

(2) call system: emergency call extensions should be set up in the laboratory for emergency use, the call host should be located in the duty room.?

(3) access control system: can limit the entry of non-authorized personnel to ensure the safety of the laboratory, generally recommended the configuration of electronic access control system;?

(4) monitoring system: can monitor the safety of laboratory personnel in and out of the situation, daily work and abnormalities, etc.;

Guangxi Baoshiguang Technology Co. It is a production and sales company that integrates the overall design of laboratories, the production of laboratory instruments, the sale of instruments, engineering construction and the production and installation of laboratory furniture.

The company's main production products are: microbiology laboratory planning, primary and secondary school biology laboratory, primary and secondary school chemistry laboratory, primary and secondary school physics laboratory, pcr laboratory, laboratory furniture, laboratory installation. Among the laboratory furniture: central table, side table, reagent racks, hanging cabinets, laboratory stools, fume hoods, laboratory high cabinets, biological safety cabinets, hazardous chemical storage cabinets, reagent cabinets, utensil cabinets, spray towers, eyewash, gas koak, emergency shower, drip racks, atomic absorption hoods, glass fiber reinforced plastic (Fiberglass) fans, glass fiber reinforced plastic (Fiberglass) fans, laboratory special valves, and so on.

At the same time for different customer groups need to design all-steel structure, steel and wood structure, aluminum and wood structure, all-wood structure, all-stainless steel structure and glass fiber reinforced plastic structure of the products; laboratory equipment: ultra-clean bench, biological safety cabinet, oven, incubator, electronic balance, and so on. Purification equipment: coarse, medium and high efficiency filters; air shower room; purification air conditioning; clean transfer window; air self-purifier; purification workbench; clean clothes; purification air supply outlet, etc.

Laboratory planning and design, looking for Baoshiguang!