Relocation activity planning program

Relocation activity planning program (general 6)

In order to ensure that the activity is effective, usually need to make a complete activity program in advance, the activity program is to clarify the activity time, place, purpose, expected results, budget and activity methods of the business plan. Activity program to how to develop it? The following is my relocation activities for you to organize the planning program sample (general 6), welcome to share.

Relocation activity planning program 1

Office building relocation time is tight and heavy task, in order to the overall interests of the company, do a good job in advance of the preparatory work, to ensure that the staff can smoothly move into the new office building, specially formulated the following relocation program.

First, the establishment of the relocation work leading group:

General Coordination:

Members: the head of each department and its designated three employees (please report the list of personnel after the meeting to the Ministry of Integrated Lv Weisheng)

Duties:

1. Organization of the company's overall work of relocation;

2. .Discuss and formulate the work plan of the company's relocation and organize the implementation;

3. Coordinate the contradictions and problems arising from the relocation work;

4. The members of the leading group should be responsible for the relocation work of their respective departments.

Second, the relocation method: the branch hired a moving company to carry out the removal

Third, the specific work of the relocation:

1, the preparatory work:

20xx May 24th - May 27th

① according to the floor plan of the new site of the various departments to allocate;

② determine the specific time of relocation, the establishment of the leading group of relocation work to determine the members;

③ organization of the group members to the new site of the actual site inspection;

work includes: refer to the floor plan of the new site of the various departments of the work site for the unified numbering, furniture layout planning, pasting Signs, the new site for the site, decoration protection, etc.;

④ related relocation objects to prepare: markers, sealing glue, cardboard boxes, screwdrivers, hammers, pliers, paper cutters, newspapers, foam, etc.;

2, the relocation of the implementation of the: May 28, 20xx - May 30

① departments relocation work should be followed by the "the" department of the departmental relocation work to follow the "independent and autonomous, the main relocation of the department" principle;

② specific relocation work:

First of all, the Ministry of General Affairs for the departments to issue the relocation of packaging required cardboard boxes, labels stickers and other packing tools;

Secondly, the person in charge of the department is responsible for the organization of relocation of departmental personnel Relocation of items for packing, and labeled with the department, name, item name and other labels, and at the same time do a good job on the identification of the items of the department's claim, especially important file cabinets, voucher cabinets must do a good job of claiming work, and at the same time, in the claimed items, filing cabinets on the label marked with the department, the serial number of the label; no departmental claim of the items of the Department of Integrated Organization of the unified handling;

Third, in the process of relocation. In the relocation process, the person in charge of the relocation department needs to organize the whole process of tracking the personnel of the department, in loading, transporting, unloading, the new office stairway and office building placement and other aspects of the organization need to do a good job of tracking the work;

Fourth, the staff's personal belongings are recommended to be carried by myself to the new office building; Fifth, the staff of all departments of the computer, the Ministry of the integrated arrangements for unified dust, and the staff of the departments of the self-packaging, the integrated department coordination Company and staff private vehicles for moving, and then by the Ministry of Technology unified installation;

Sixth, the relocation of the department will be all the items of the department to move the new office building, in accordance with the designated location of the placement, the staff items need to be placed in the designated office location (the Ministry of the comprehensive department has marked the location of the office of employees of the various departments), and their office items and documents neatly arranged;

Seventh, the company's Leadership office, by the comprehensive part of the installation, packing, disassembly and protective packaging of office furniture that needs to be disassembled, to ensure that the relevant items in the moving process without damage;

③ Relocation order:

From the old building cut off the network, the new building to open the network time to consider, arrange for the Ministry of Technology to complete the wiring after the opening of the network to be carried out after the Ministry of Technology to move first, after the move of the other departments.

The order of relocation is as follows: Technology Department, Office of the Leader, General Department, Business Department, ATM Department, Marketing Department

Fourth, relocation notes and requirements:

1, the principle of relocation work requires all employees of the company to participate in all the staff to participate in the relocation of all the staff should be punctual in place, conscientious and responsible;

2, the departments in advance to deal with do not want the goods, some important documents and information should be organized and filed in advance, and handed over to the Ministry of Integrated unified custody. All paper and electronic information related to the company are not allowed to discard, for the need to destroy the need to do a good job of registration, and submit to the Ministry of Integrated Destruction;

3, after the relocation is completed, members of the relocation team of each department is responsible for checking whether the original office facilities are intact, whether there should be moved and not moved items, eliminating the tables, cabinets, such as whether the emptying, close the doors, windows, water and electricity, clean up the original office hygiene, the original office key to the Ministry of Integrated. The key of the original office will be handed over to the Ministry of General Affairs.

A, the preparatory work

1, to determine the general responsible person, the executive, as well as the departments docking personnel;

2, to determine the date of the move:

3, issued a notice of the relocation (internal) and announcements (external), requiring the departments to receive notification of the items to be moved to start the planned organization.

4, change the corporate VI, such as business cards, whether it is necessary to replace before moving;

5, the new office cleaning appliances, low-value consumables statistics (need to be listed on the list) and purchasing;

6, the new and old office access card for the main moving company's porter's pass.

7, whether the new office needs to do air purification, fine cleaning.

8, the new site file cabinet placement, office arrangements.

Second, the implementation of the stage

1, the departments of the items to be relocated to their own packing, and marking, computer disassembly by the removal company responsible for packing. (Work must be items can be the last sealing box)

2, the Ministry of Human Resources on the departments need to relocate the items of statistical verification. 3, the night of the removal of the list of overtime personnel, the items of the departments to check.

Three, follow-up work

1, the old office space scrap cleanup.

2, the new office cleaning.

Relocation activities planning program 3

Before moving:

1, into the new site for the site, decoration protection. Protection measures: from out of the shipping elevator, the door frame, wall corners with large cardboard for protection. (Large cardboard length 2.5m, width 1.5m, thickness 0.5cm). To carry the main channel with colorful strips of cloth for protective laying to ensure that the carpet is not contaminated.

2, with reference to the floor plan of the new site of the workstation for a unified number, that is, in the new seat above the special label with the seat employee's name and number. Once this number is confirmed, the employee of the old site of all the private office supplies and documents unified use of the number, so that workers can quickly find the specific location of the documents carried over (office supplies), and placed in the seat above, for the next sorting of documents (office supplies) to provide the most convenient preparatory work.

3, the public **** area according to the pre-set function of a unified number, in the field and drawings marked. Likewise the number once confirmed, the old site of the region's equipment, documents, filing cabinets will also be unified to use the number to ensure that workers can quickly and accurately find the home of each item. (For example, the administrative department, personnel department, finance department, marketing department, etc. to carry out the number of separate categories)

Moving:

1, began to distribute cardboard boxes, labels to the hands of each employee, by the employees themselves will be their own personal belongings for the box, at the same time, to the computer for the organization (the computer has been disassembled by the user is complete), the monitor and the host for separate packaging, and stickers, the monitor and the host for the computer. The computer is organized (the computer has been disassembled by the user), the monitor and the mainframe are packed separately and labeled with a uniform number, making it two independent whole for easy handling. Employees will be their own personal belongings after the completion of the box, the carton for packing and sealing, labeled with a unified number.

2, our company will send service personnel to disassemble the office furniture need to disassemble and protective packaging. For wooden desks, we will use bubble wrap outside and then cardboard packaging to ensure that wooden desks are unharmed during transportation.

3, the common area of the documents, office equipment (such as printers, copiers, fax machines, projectors, etc.) to pack or organize and stick a uniform number. Make it an independent whole, easy to carry, to ensure that not miss a part, a data line.

4, on some of the fragmented miscellaneous classification and packaging (such as garbage cans, fans, refrigerators, hangers, water dispensers, etc.), to ensure that they become an independent whole, and affixed with a uniform number of labels, so as not to lose three or four when moving.

5, all things have been classified and packaged, organized, and labeled with a uniform number. Now start and the customer company's site manager together with all the items to register the number of count, in order to move to the new site after the number can be verified.

6, our company's trucks and movers and service personnel will arrive on time. We assign vehicles according to the actual situation of the customer, and each truck is equipped with 2 porters. From the moment the goods leave the old office, we will send our service personnel to track the goods throughout the whole process to ensure that the goods can reach the new office with quality and quantity. At the same time, we will arrange for our service personnel to be on site to direct the movers to put the goods in place according to the pre-planned orientation.

After the move:

1. All the goods have been moved to the designated location of the new office. Now start and the customer company's on-site person in charge together in accordance with the statistical breakdown of one by one inventory, after the inventory is correct, notify your company staff according to the pre-arranged position back to their own position to start organizing their own private office supplies and documents. Our service personnel began to organize the documents in the common area, but also the need to install the office furniture installation and placed in place according to the drawings.

2, all the office furniture, office equipment, documents are organized and placed, began to clean up the garbage, remove the site of the protective materials. Finally, the carpet is thoroughly cleaned to ensure that all employees have a clean and tidy office environment after the move.

3, the old office cleaning, but also the property company a clean office environment.

Relocation activities planning program 4

First, dismantling principles and general requirements

1.1 first small and then large, first easy and then difficult, first ground and then high altitude, first peripheral and then the main body, it is necessary to dismantle the equipment to be as little as possible, and at the same time to meet the requirements of the packaging, and ultimately to achieve the equipment reinstalled after the accuracy of the performance of the same dismantling of the same pre-consistency. In order to strengthen the post responsibility, the use of division of labor responsibility system, who disassembles, who installs.

1.2 Before disassembly, the first must be in conjunction with the manufacturer and the owner to cut off and remove the power supply of the equipment. Water, gas and other parts of the workshop power contact.

1.3 Empty lubricating oil, coolant, cleaning fluid and so on.

1.4 Disassembly should avoid destructive disassembly (such as gas cutting, etc.), such as must be carried out through the owner's representative and the engineer in charge.

1.5 All wires and cables are not allowed to be cut, the removed threads should be labeled, some threads are not labeled, should be supplemented before removing, the line number is not allowed to be lost, before removing the line should be carried out before the three controls (internal line number. Terminal board number, external line number) to confirm that there is no error, before disassembling, or to adjust the line number.

1.6 disassembly to ensure the absolute safety of the equipment, to use the appropriate tools, not just substitute, not to use a sledgehammer.

1.7 lifting equipment shall not be bumped, to choose the appropriate lifting point of slow lifting light, wire rope and equipment contact to take protective measures.

1.8 The use of forklifts to transport equipment should be bundled and tied up tightly, so as not to fall off in the downhill or vibration.

1.9 When disassembling and assembling the combined equipment, the removed bolts, nuts, locating pins, etc. should be screwed back and inserted into the original position immediately after applying oil to avoid confusion and loss.

1.10 Some movable parts of the equipment, such as skateboards. Power head, etc. to lower the center of gravity, with a wooden board padded dead before locking.

1.11 equipment hydraulic piping is more, before each removal of a head, you must first hang a sign with the installation number, some parts to make a good positioning line marking, remove the pipe two ends should be immediately wrapped in wax paper to avoid contamination and damage to the wire buckle.

1.12 Remove the equipment to be stored in accordance with the designated location.

1.13 Do not unplug the plug-in board in the electrical cabinet of the equipment, and seal it with tape paper for reinforcement.

1.14 Make a good record of dismantling, and hand over to the relevant personnel.

Second, the disassembly process flow

Third, to the process description

3.1 construction preparation

3.1.1 to all participating construction personnel to carry out the project's technical briefings, and each individual project specific construction personnel to carry out Construction process requirements, quality requirements, construction precautions, etc., all participating construction personnel should be familiar with the site, drawings and specifications, procedures and requirements, so that everyone has a clear idea of the heart, not blind operation.

3.1.2 In accordance with the requirements of the owner and the specification, all construction equipment, testing instruments (table), cleaning equipment, labor supplies, etc., to do a good job of inspection, acceptance, storage, protection work.

3.1.3 Inspection of equipment, including the following:

A. Inspection of the appearance of the equipment

B. Confirmation of the technical parameters of the equipment, the state of action

C. Checking the precision of the equipment installation

D. Mapping of the equipment between the position of the mutual location of the operation position, draw the relevant diagram

E. Equipment processing accuracy to the site production of workpieces in place subject to The workpiece produced on site in situ shall prevail, and the sample workpiece will be randomly boxed and shipped later.

The above checks should be made a detailed record, and handed over to the site representatives of both parties to sign, as the basis for installation.

3.2 Marking

In order to facilitate the smooth progress of demolition and restoration of the installation work, equipment demolition using a unified marking method, that is, the digital marking of the approach to the demolition of electrical equipment, basically using the same method for the demolition and according to the complexity of the electrical equipment, and accordingly increase the part of the marking symbols.

Secondly, in order to determine the location of each line of equipment in the production line, according to the direction of each line of the process flow arranged in the sequence of calibration of the equipment, calibration of the principle of each separable, the completion of a process for the division of equipment for the division of unit calibration.

Equipment decomposition should be considered comprehensively, decomposition and re-installation, can maintain the original precision requirements under the conditions of packaging convenience, there are contradictions between the two should be to ensure that the accuracy of the work performance does not change prevail.

The limit block of each line (equipment), travel switches, non-contact switches, in the case of conditions permitting, as far as possible, do not remove, in order to reduce the installation of re-adjustment of the work must be removed, must be strictly determined by the position of the probe and the relative position of the sender workpiece (or block) and the distance, marking out the location of the installation, and make a record, draw a sketch.

Each line of equipment, should be installed later according to the lack of information may be the case, calibration of the relevant positioning dimensions, and sketches, record the specific data, in order to reset the installation.

For the coupling between the two devices, there should be a reset mark and positioning mark, and as far as possible in a line to achieve uniformity of symbols, part marking can be according to the coupling device workstation.

For equipment that is not easy to recognize the direction, there should be obvious installation direction symbols.

A variety of demolition symbols, signs, must be secure, positioning marks and positioning dimensions of the measurement point, should be as far as possible in accordance with the permanent requirements, so as to avoid damage and fuzzy due to the hollowing out of the box transportation and other reasons, affecting the installation.

Record work, is a guarantee of the smooth progress of the installation work in the future, there must be a person responsible for the need for Party A visa recognition of the work, must adhere to the countersigning system, in particular, the defects of the equipment inspection records, packing list records.

3.3 dismantling records

3.3.1 As the dismantling of equipment are generally old equipment, before dismantling, we should be the appearance of each piece of equipment, the relative position, the accuracy of the installation, the process of checking, and together with the owner and the relevant technical personnel to fill out the countersigning form as a basis for the future acceptance of the handover of the work, the individual equipment is being carried out, we can also take the processing of its parts as a sample for the commissioning. Commissioning samples for equipment installation after the standard of processing accuracy, some of the control of more advanced equipment, such as computer-controlled equipment, to consider the dismantling from the shutdown, packaging, transportation, re-installation, debugging and operation of such a long cycle of the process, the loss of the program in the machine, to make a good backup in a timely manner.

3.3.2 Before disassembly, equipment marking is a very important and detailed work, the disassembly of equipment must do this work, disassembly, in accordance with the unified marking method number, to provide a guarantee of smooth installation in the future, in addition, in addition to disassembly of the equipment for the numbering, but also some parts of the equipment to make a good positioning mark, such as the equipment process block, the position of the bumper limit switches, all kinds of sensors installed, the safety device. A variety of sensor installation position, the insurance device, the original position of the safety valve and some round mounting parts, symmetrical mounting parts, in the process of dismantling may change the position, in the dismantling, make a good positioning mark, the installation can be easily restored to its original position, reduce unnecessary adjustments and errors.

3.3.3 According to the general principle of disassembly, combined with the actual situation of each device, to determine the number of major disassembly parts, the external dimensions of each piece and the estimated weight, before disassembling the relevant dimensions should be drawn out to measure the parts, draw the necessary piping system diagram, the operation of the guide rail, the power head and a variety of sensors to detect the components of the measures taken to protect.

3.3.4 Disassembly sequence block diagram:

3.3.5 Piping, wiring demolition

Demolition should be the first to demolish the branch pipe after the removal of the total pipe, and finally the bracket, the pipeline within the external dimensions of the disassembled parts of the other equipment is no longer disassembled, by the hose connected to the equipment, and the pipe will be connected to the pipe is dismantled, will be tied to the hose to the equipment, demolition of the following should be paid special attention to:

A.The hose should be connected to the equipment by a hose. p>

A. Draw the necessary piping system map of each production line

B. As more pipe headers are disassembled, it is necessary to hang the installation marking sign on both sides of the disassembled pipe joints first, and the disassembled pipe joints should be wrapped to avoid damage to the wire fasteners and the entry of dirt.

C. The gasket of the pipe joint must not be lost, and can be wrapped together in the pipe joint.

D. Remove the tube, according to the medium contained in the species, respectively, bundled, hung up the packing mark, sent to the designated location.

E. When disassembling, must use the appropriate work, machine tools, appropriate force, each disassembled pieces must have a packing number, and rust treatment before packing.

3.3.6 Disassembly

According to the specific conditions of each process equipment and transportation requirements, to determine whether it is disassembled or not, the disassembly process should pay attention to the following points:

A. Draw out the necessary process equipment layout plan.

B. The disassembly process should be a detailed inspection and disassembly, disassembly records.

3.3.7 Electrical system`s dismantling

The following points should be noted for the dismantling of the electrical system of each processing line (equipment):

A. Before dismantling, familiarize yourself with the relative position of each electrical equipment, and understand the direction of the cables and the significance of their numbers.

B. Draw the mutual position of each electrical equipment, before dismantling the bridge, draw a three-dimensional map, and then mark the installation number on the map, and then mark this installation number on the cable bridge, marking the completion of the dismantling only.

C. Considering the safety, convenience and reliability of mechanical and electrical disassembly, cable disassembly is carried out from each power head according to the position of the wire box.

D. Before disassembling, we should first number all the lines according to the corresponding terminals, and then disassemble them only after checking carefully that there is no error.

E. For the position of ultra-high junction box, should be removed from the column, fixed in the corresponding position, but the cable can not be stressed.

3.4 Cleaning

equipment, fittings and other disassembly is completed, should be cleaned in a timely manner, rust work, the specific methods of operation can be found in the "mechanical equipment installation program" in the "equipment cleaning".

Fourth, equipment removal construction safety technical measures

In order to ensure the safety of demolition construction, the following requirements and measures must be met:

4.1 familiar with the environment, understanding of the water, gas, electricity control of the operating position, demolition must be clear cut off state before operation.

4.2 Strictly in accordance with electrical safety regulations, construction, stopping must be hung with "prohibit closing" signage, and technical measures to prevent misdirection of power.

4.3 The correct use of site work, machinery and equipment, to understand its performance.

4.4 Strictly comply with the fire regulations, the need for open-flame operation, there must be fire prevention measures, and have a person to monitor, in the flammable, explosive materials around, to strictly prohibit open-flame operation.

4.5 should try to avoid cross work, work at height must carry a safety belt, safety belt suspension must meet the requirements of the safety regulations.

4.6 When dismantling equipment, you must first familiarize yourself with the relevant drawings and equipment, and prohibit blind operation.

4.7 When dismantling equipment and lifting, care must be taken not to damage the plant and facilities.

4.8 The site should be equipped with a full-time safety inspector to check and remove unsafe factors in time.

4.9 To do civilized construction, timely clean up the site and waste.

Relocation activities planning program 5

I. Establishment of the leadership group

Group leader: Ding Huaming

General commander: Chen Dayun

Deputy leader: peak, Xu Tujun

Members: Lei Bing, Fang Mei, Guo Hongxia, Lei Huifen, Zhou Aizhen, Yang Aiping, Chen Sweet, Lei Aimin, Pan Ling, Zhou Qiu Hua

2. Teachers relocation time:

3. The old school stopped after dinner.

4, follow-up property cleanup and relocation:

Third, the student dormitory arrangements

1, dormitory arrangements: see the "Accommodation Arrangement Table". 606 -- 611 middle school girls and their living teachers; 506 --511, 401--411 junior high school boys; 1 to 3 floor 18 rooms (106--111, 206--211, 306--211, 306--211, 306--211, 306--211, 306--211) -211, 306--311) live elementary school boys and girls.

2, bed arrangement to people: by the life of each class teacher is responsible for, class teacher support.

3. 1--3 grade students are arranged according to 6 persons per room; 4--9 grade students are arranged according to 10--12 persons per room.

Fourth, specific matters

1, Saturday and Sunday overtime personnel: Chen Yun, peak, Xu Tongjun, Zuo Dali, Zeng Jianhong, Lei Huifen, Huang Yuqin, life teachers, Yang Jiyong, Zhao Congzhong, Chef Fang, two helpers, cleaners, all class teachers.

2, bed arrangements to the person and bed posting: life teacher, by Xu Tongjun is responsible for in place.

3, the list of students in the dormitory, "student dormitory system", "civilized dormitory system" posted: Zhao Hongxia, Peng Zhichao.

4, luggage storage and handling: Friday morning with the school bus first transport junior boys and girls luggage to the new campus is stored in the dance studio on the first floor, on and off the bus elementary and junior high school life teachers work together. In the old campus, the luggage in their respective bundles, tied with straps, write the name; on the car, according to the new campus dormitory arrangements, with the dormitory luggage stored together, with a car transportation.

Friday afternoon with the school bus to transport junior high school girls luggage to the new campus stored in the first floor biochemistry laboratory. Saturday with the school bus to transport elementary school students luggage to the new campus equipment room storage. Friday to Sunday, bed tags laid out a dormitory, life teacher homeroom teachers will be settled luggage a dormitory.

5, each room is equipped with ash handfuls, garbage baskets, waste baskets, room numbering, each life teacher with a clothes fork. Lei Huifen, Huang Yuqin, Ding Chunfang completed.

6, the afternoon before school, junior high and middle school tables and stools all moved to the playground storage, tables and stools of primary students by junior high students to move, teachers unified command, according to the height of the storage respectively.

7, student beds, luggage tables and stools moved to the new campus, teachers, life teachers, warehousemen, food supervisors, chefs, cooks, stoves workers all to work in the new campus, the security guards adhere to the December 23rd, after the new campus to work.

V. Demolition, handling and installation of beds

1, demolition and installation of carpentry: 4 people.

2, wooden beds, tables and stools loading and unloading porters: 6 people.

3, iron bed dismantling, loading and unloading, moving to the room, installation: 6 people. According to each bed 10 yuan package.

4, please a medium-sized car.

5, the price of work and living arrangements: 80 yuan per shift for large workers, 50 yuan per shift for small workers. Each class on the 8 hours, 8 hours outside of overtime as a separate calculation. The school provides free lunch, with disposable lunch box meals, by Ding Chunfang is responsible for.

6, please labor and arrange in place: Chen Yun, Xu Tongjun.

Six, the organization and implementation:

1, held a meeting of all the staff of the old campus, the layout of the relocation work to put forward the relocation requirements.

2, held an elementary school, junior high school students relocation mobilization, study and publicity "student dormitory system", "civilized dormitory rules", classroom teachers are responsible for the four to nine grades of students signed the "Accommodation Guarantee". Elementary school grades 1 to 3 by the class teacher is responsible for safety, civilization, health education.

VII, instructions

1, the original on- and off-campus lodging teachers, all back to the school to arrange room accommodation;

2, not allowed to damage the door and the wall and other facilities dirty;

3, beds, bedding baggage, tables and stools check and acceptance: Xu Tujun.

Relocation activities planning program 6

In order to strengthen the organizational leadership of the relocation work, the Director's Office decided to set up the District Archives relocation work leading group, the list of members are as follows:

Leader: Zhang Xingchun

Deputy Leader: An Ying, Sun Zhiguo, Dong Haiyan

Members: Yue Xin, Ren Zengyao, Xia Jie

The leading group is responsible for Comprehensively leading the relocation work of the Bureau Museum and coordinating the problems arising in the relocation process. According to the needs of the work, the staff of the Bureau will be divided into four working groups, each group is organized as follows:

Group I: Zhang Xingchun, Sun Rufeng, Zhang Yongmei

Group II: An Eagle, Yue Xin, Li Hongfu, Qian Kun

Group III: Sun Zhiguo, Xia Jie, Wu Yuhong, Yang Fan, Jin Gan

Group IV: Dong Haiyan, Ren Zengyao, Ma Hong, Xiong Dan, Li Tao

1, to ensure the safe handling of archival storage archives.

2, to ensure the safe handling of library materials.

3, to ensure the safe handling of archival materials in the former District History Museum.

4, to ensure the safe handling of office equipment, office supplies.

5, to ensure the safe handling of other miscellaneous items.

(a) the preparatory stage (before the end of August 7)

1, the first group to develop a relocation work plan arrangements, contact to determine the removal company, ready to prepare the necessary packing equipment, do a good job of the new Museum of cleaning, do a good job in advance to open the network, equipment installation and other logistical support work;

2, the third group to complete the file

(B) relocation stage (August 8 - August 9)

1, August 8, to complete all the collection of archives, library materials, the original exhibition of the Museum of History of the District of the materials out of the warehouse, handling, acceptance, storage work;

2, August 9, the groups to complete their respective responsibility for the Office equipment, office supplies and other miscellaneous loading, handling, acceptance work

(C) adjustment stage (August 10 - August 21)

1, the first group to do a good job of the Bureau of network, equipment debugging to ensure that the normal operation of the office and functional room equipment, supplies The equipment work, do a good job of all kinds of debris disposal work, determine the new museum security, cleaning, do other logistical support work;

2, the fourth group to do a good job in the collection of archival materials, shelves, do a good job in the department of sealed archives receiving, handling, shelves, do a good job of indexing of the warehouse, do a good job of the current document access center documents on the shelves, do a good job of the archives network debugging Work to ensure that the normal work of archive checking;

3, each group to do their respective responsibilities for office equipment, office supplies, unsealing, organizing, placing the work of the archives.

;