How much is it to walk 90 square meters of water and electricity in Zhengzhou?

By 2020, the labor cost of 90 square meters hydropower renovation will be different according to the pricing method of the decoration company. Usually 90 square meters of water and electricity labor costs should be around 3000 yuan.

Labor cost calculation method:

1, calculated by square area

At present, high-voltage electricity is generally calculated at 35-45 yuan per square meter (if it is a little more complicated, the price is higher), and drainage is calculated at 35 yuan per square meter.

2. Mixed price

After the plumber investigates the site, he will estimate the approximate labor cost according to the actual situation, and then quote the lump sum price.

3, according to the actual length calculation

20 yuan per meter is calculated according to the length of electric conduit, and 25 per meter is calculated according to the actual length of upper and lower water pipes.

4, according to the actual man-day settlement

According to 300 yuan/man-day, according to the actual installation man-day * man-day unit price = labor cost.

Extended data:

Cost of water and electricity materials:

1, high-pressure material fee

Wire: concealed pipe 2.5mm2, 32 yuan/m; Single pipe decorative open wire 2.5mm2, 22 yuan/m;

Open pipe with single pipe is 2.5mm2, 18 yuan/m.

Socket: 86×86,65,438+00 yuan per box, 86×86 5 yuan per box.

Construction: through-hole bearing wall 40 yuan/piece, non-bearing wall 15 yuan/piece, box black box 200 yuan/piece, surface mounted 100 yuan/piece.

2, channel reconstruction material costs

Water pipe: concealed pipe PP-RDNS2.820mm, 38 yuan/linear meter; Open pipe PP-RDNS2.820mm, 28 yuan/linear meter; Dark pipe PP-RDNS3.525mm, 55 yuan/linear meter; Open pipe PP-RDNS3.525mm, 46 yuan/linear meter.

Construction: 50 yuan/hole for load-bearing wall of through-wall tunnel and 20 yuan/hole for non-load-bearing wall of through-wall tunnel.